Updated 29th November 2024; 21st January, 22nd May, 11th October 2026
A 4m handline / ladder drops into a choked floor with a hidden, slightly draughting rift that could be opened up. Stones drop a few metres. A dig in the floor opened up some holes down.
Further work occurred in the Christmas period 2025 and a blocking boulder was broken up in April 2026. More excavation work is planned.
In early August 2026, the 4.5m shaft was cleared and dropped to a dig where a very large boulder was pushed forwards into a chamber to clear the way through. A 6.2m pitch followed which dropped into a spacious chamber - which would hold "15 people easily". Some digging in the chamber has allowed a view into a void, but that might just be a space in the boulder choke.
See also the nearby site 5052.
References: anon., 2020d (autumn logbook); anon., 2024e (autumn logbook); anon., 2025d (Xmas logbook); anon., 2026a (Easter logbook); anon., 2026c (summer logbook)
Entrance pictures : 2020 : Easter 2026 : summer 2026
Underground pictures : 2020 and Easter 2026 : summer 2026
Video : Easter 2026 (YouTube)
Detailed survey : elevation 2026
Line Survey :
On area survey :
Survex file : 2026 : with site 5052