1974
July 26th - summer log -
1974s-03
July 29th - summer log -
1974s-11 -
exploration
July 30th - summer log -
1974s-12
July 31st - summer log -
1974s-18 -
exploration
August 3rd - summer log -
1974s-25
1975
January 1st - summer log -
1975s-71
1977
July 29th - summer log -
1977s-51
1978
July 18th - summer log -
1978s-07
July 23rd - summer log -
1978s-12;
1978s-24
July 24th - summer log -
1978s-13;
1978s-24;
1978s-25 -
Maypoling above sump 20ft passage to choke
August 5th - summer log -
1978s-19;
1978s-24
1979
January 1st - summer log -
1979s-48
1980
August 16th - summer log -
1980s-54 -
Boulder pushing
1981
August 14th - summer log -
1981s-70;
1981s-71
1982
July 16th - Easter log -
1982s-02
1983
August 10th - summer log -
1983s-35 -
Poking about
1985
July 19th - summer log -
1985s-02 -
draught following and pushing. 3 entrances. Sketch
July 23rd - summer log -
1985s-06;
1985s-06 -
Maypoling above sump
July 28th - summer log -
1985s-11 -
draught following and pushing.
1986
July 1st - summer log -
1986s-59
July 19th - summer log -
1986s-14 -
Digging entrance
July 27th - summer log -
1986s-40;
1986s-41
January 1st - summer log -
1986s-92
August 2nd - summer log -
1986s-54;
1986s-55;
1986s-62;
1986s-64;
1986s-65 -
Smoke looking from Biggo + videoing
August 3rd - summer log -
1986s-67 -
Surveyed high level. Lower bedding looked at.
August 4th - summer log -
1986s-68;
1986s-69;
1986s-70 -
Enter 1986 extension. 1km so far.
August 5th - summer log -
1986s-74;
1986s-76;
1986s-77;
1986s-78;
1986s-79 -
12 into cave. Joined with Biggo below Smack
August 7th - summer log -
1986s-83 -
Surveying along eastern passage + second Biggo connection.
August 11th - summer log -
1986s-94 -
Look at water level after rain
August 12th - summer log -
1986s-95;
1986s-96;
1986s-96 -
(1) Further surveying + poking about
(2) Through to survey Biggo / Uzueka connection
(3) Photo trip through to Biggo 2
August 14th - summer log -
1986s-99 -
Surveying and poking about at Biggo 2 choke / Uzueka
August 20th - summer log -
1986s-A8 -
Videoing from Llueva - Carcavuezo
1987
July 29th - summer log -
1987s-07;
1987s-08;
1987s-09 -
Slug into chamber at end of Biggo 2 with river. Survey shown.
August 1st - summer log -
1987s-15;
1987s-15;
1987s-15;
1987s-15;
1987s-75;
1987s-75;
1987s-75;
1987s-75 -
Push into ARgument Passage. Series of rifts joins this to Chase the Dragon.
August 2nd - summer log -
1987s-21;
1987s-75 -
Sewers of Doom: Series above the river under Smack.
August 3rd - summer log -
1987s-24;
1987s-33 -
Large chamber near the entrance looked at. BURP location to surface. Another route through boulders found. Southern Passage pushed over boulders.
August 5th - summer log -
1987s-27;
1987s-28;
1987s-29;
1987s-31 -
(1) Sewers of Doom. Chamber at end to Biggo = Candy Shop.
(2) Passages on far side of Rhinocerous Passage from Chase the Dragon. Surveyed passage at end of Strangle W Passage
(3) Draintester. Coke Run pushing.
August 8th - summer log -
1987s-46;
1987s-47
August 9th - summer log -
1987s-43;
1987s-43;
1987s-43;
1987s-44;
1987s-44;
1987s-44;
1987s-45;
1987s-45;
1987s-45;
1987s-45;
1987s-45;
1987s-45;
1987s-46;
1987s-46;
1987s-46;
1987s-61;
1987s-61;
1987s-61 -
(1) Photo trip to Coke Run area.
(2) Through Uzueka choke to start of Trident but couldn't find entry.
August 15th - summer log -
1987s-62;
1987s-63;
1987s-68 -
Molephoning near Draintester.Didn't work.
1988
July 31st - summer log -
1988s-15;
1988s-19 -
Sewers survey started
January 1st - summer log -
1988s-A6
August 1st - summer log -
1988s-21;
1988s-26;
1988s-27;
1988s-28;
1988s-29;
1988s-30;
1988s-31 -
900m new surveyed Western Series.
August 2nd - summer log -
1988s-23;
1988s-24;
1988s-25;
1988s-33;
1988s-43;
1988s-44;
1988s-45;
1988s-46 -
Further exploration and surveying in the Western Series (2 account)
August 4th - summer log -
1988s-34;
1988s-39;
1988s-40 -
Molephoning + exploration. Find phone point 30m from shed on track.
2 caves above barn. See numbers 708, 709 (2 accounts)
August 6th - summer log -
1988s-50;
1988s-57 -
Abortive surveying trip in Sewers of Doom. Retrieve ladder (2nd account)
August 7th - summer log -
1988s-53;
1988s-55 -
Exploration of River Sink Passage (Cool Green Passage). Rift dropped back into Carcavuezo passage.
August 8th - summer log -
1988s-58 -
Surveying Sewers - 20 closed loops. Also 100m surveyed upstream towards Carcavuezo sump. Needs pushing with wetsuits.
August 9th - summer log -
1988s-59
August 10th - summer log -
1988s-67 -
Photo trip into Western Series and a few in old Carcavuezo.
August 11th - summer log -
1988s-70;
1988s-73 -
Small dig into Pudding Passage
August 15th - summer log -
1988s-91
August 16th - summer log -
1988s-93 -
Retrieve one ladder from Carcavuezo.
1989
January 1st - summer log -
1989s-00
July 24th - summer log -
1989s-25 -
Haymarket push up Haymarket inlet. See later in log.
Also photography
July 25th - summer log -
1989s-25 -
photography. Squeeze through boulders
July 27th - summer log -
1989s-26 -
43m surveyed in Haymarket Passage
July 28th - summer log -
1989s-13;
1989s-24 -
Later on Candy Shop upstream sumps. Survey 1st R Siding. Look at Southern Passage.
July 29th - summer log -
1989s-15;
1989s-23;
1989s-58 -
Bolt aven 100ft high in Coke Run "under" Trident.
July 31st - summer log -
1989s-33;
1989s-58 -
Carry on bolting Coke Run aven. Small passages at the top close in. Dutch cavers in.
+ later on in log.
January 1st - summer log -
1989s-51
August 13th - summer log -
1989s-94 -
Trip to Strangle W Passage. Roof tubes need another look.
1991
July 18th - summer log -
1991s-02
July 19th - summer log -
1991s-02 -
Dug out.
Western Series poked in. Entered by climbing up from the streamway.
July 26th - summer log -
1991s-19 -
Duck Passage explored. "110m oxbow" surveyed. Length now?
August 6th - summer log -
1991s-38;
1991s-40;
1991s-41 -
Molephoning Draintester corner. Pushing around for possible Trident link.
August 13th - summer log -
1991s-66;
1991s-67 -
Trying to find downstream high level continuation. Ladder bypass found.
1996
December 28th - Xmas - New Year log -
1996c-02
December 31st - Xmas - New Year log -
1996c-04 -
Dug out and entered to Strangle W Passage. Passage to left explored and surveyed. Is this the same one that Jim Davis did in 1989? YES
Length surveyed 141m
1997
August 2nd - summer log -
1997s-45;
1997s-46 -
Draintester extension surveyed under Trident "60m" extra explored but not surveyed at the end.
TL=41113 + 248m = 41381m
(Better logbbok account around 10/11 Aug.)
1999
April 2nd - Easter log -
1999e-08;
1999e-09;
1999e-10
August 2nd - summer log -
1999s-17 -
Parallel Sausages extensions. (continuation of Easter extensions) 528m surveyd
4VS TL = 41687 + 528 = 42215m
August 4th - summer log -
1999s-23 -
Molephoning Western Series and chamber near the entrance
August 6th - summer log -
1999s-29;
1999s-42 -
(1) Molefone: S West Passage OK but other attempts not OK
(2) About 100.7m passage surveyed off AQ Foot. Still going.
TL=42316m
(3) Rhinocerous Passage scaling. 40m surveyed but not entered. (To the east of Smack)
2000
August 6th - summer log -
2000s-27
2001
April 11th - Easter log -
2001e-09 -
(1) Passages surveyed (98m) under Rhinocerous Passage.
(2) Also Ramon Bolado pushed for another 12.5m
(3) New rift dug out 20m N of AQF 5m deep.
April 12th - Easter log -
2001e-37 -
Dive through into Western Series sump 15m (X25m) rift chamber. Narrow squeeze with gravel bottom needs pushing (dive)
April 15th - Easter log -
2001e-37 -
As above (?)
August 11th - summer log -
2001s-32 -
Dive in Ovlov, Western Series. 15m to squeeze and western heading passage. 30m turned round.
2002
March 13th - February log -
2002f-09
October 20th - autumn log -
2002a-02
2003
August 9th - summer log -
2003s-24
2007
September 4th - summer log -
2007s-66 -
Amended position 30T 0452875 4797975 Altitude 145m
2008
August 13th - summer log -
2008s-74
2011
January 1st - summer log -
2011s-68
2012
January 10th - Jan-Feb log -
2012jf-01
February 19th - Jan-Feb log -
2012jf-08
February 20th - Jan-Feb log -
2012jf-09
April 9th - Easter log -
2012e-48 -
photography
2013
July 19th - summer log -
2013s-01 -
Ent. Cleared. Survey (solo by Ali)
July 20th - summer log -
2013s-01 -
Ent. Cleared. Survey (solo by Ali)
July 22nd - summer log -
2013s-03 -
Survey from top of rift to start of rift to the Afternoon Stroll.
July 28th - summer log -
2013s-14 -
More re-surveying L=64m
July 29th - summer log -
2013s-17 -
Slippery Rifts; Duck Passage and entrance area surveyed L=71m new
Other entrance is 3895
July 30th - summer log -
2013s-23 -
More new passage during resurvey
L=188m new
July 31st - summer log -
2013s-24 -
Resurvey in stream
August 1st - summer log -
2013s-28;
2013s-30 -
(1) Photos taken
(2)Re survey
August 2nd - summer log -
2013s-32 -
Resurvey (solo)
Total length of resurvey + new in Carcavuezo is 2688m)
August 3rd - summer log -
2013s-37 -
Resurvey
August 5th - summer log -
2013s-48 -
New route to the Western Series bolted. Traverse line.
August 16th - summer log -
2013s-78
August 18th - summer log -
2013s-81
August 20th - summer log -
2013s-85
January 1st - autumn log -
2013a-09
October 14th - autumn log -
2013a-01 -
Big Chamber SNTE explored extended and surveyed. Entrance series further surveyed.
Possible leads @ upstream sump need bolts.
Downstream Oxbow surveyed.
Rift complex on N side were surveyed up to start of Barn Passage.
Batches surveyed 13-21 to 13-28 New = 267m (Total surveyed = 854m)
October 15th - autumn log -
2013a-01 -
Big Chamber SNTE explored extended and surveyed. Entrance series further surveyed.
Possible leads @ upstream sump need bolts.
Downstream Oxbow surveyed.
Rift complex on N side were surveyed up to start of Barn Passage.
Batches surveyed 13-21 to 13-28 New = 267m (Total surveyed = 854m)
October 16th - autumn log -
2013a-02 -
Big Chamber SNTE explored extended and surveyed. Entrance series further surveyed.
Possible leads @ upstream sump need bolts.
Downstream Oxbow surveyed.
Rift complex on N side were surveyed up to start of Barn Passage.
Batches surveyed 13-21 to 13-28 New = 267m (Total surveyed = 854m)
October 19th - autumn log -
2013a-04 -
Big Chamber SNTE explored extended and surveyed. Entrance series further surveyed.
Possible leads @ upstream sump need bolts.
Downstream Oxbow surveyed.
Rift complex on N side were surveyed up to start of Barn Passage.
Batches surveyed 13-21 to 13-28 New = 267m (Total surveyed = 854m)
2014
April 14th - Easter log -
2014e-12 -
Entrance cleared of debris.
April 15th - Easter log -
2014e-19 -
Passage above stream 14-01
Festering calf 70m in.
To BCSNE and down hole @ W end to meet the river.
Survey to 4016 dig. 14-02.
April 17th - Easter log -
2014e-26 -
Downstream sump area investigated. High rift near end of canal that has a strong draught. COuld be bolted.
3895 connection surveyed 14-03
4VS TL=56788m
April 19th - Easter log -
2014e-33 -
Resurvey rifts near W Series. 14-04 & 14-05?
TL after Biggo exts. = 57364m
July 23rd - summer log -
2014s-09 -
Calf in entrance decayed to mainly bones.
July 25th - summer log -
2014s-10 -
Survey connection between W + E Series
Batch 14-06
July 30th - summer log -
2014s-17 -
Up muddy rift climb leading to Western Series from streamway. 92m of new Batch 14-07
The looked at Haymarket Series
August 4th - summer log -
2014s-27 -
More survey 12+95+29 (79?)m
Low duck and streamway @ Haymarket entered. 118m surveyd Batches 08-11
August 8th - summer log -
2014s-47;
2014s-48 -
Return to W. Series. A "few hundred" metres of new passage found?
2015
March 12th - Easter log -
2015e-01;
2015e-02
April 4th - Easter log -
2015e-16
April 7th - Easter log -
2015e-27;
2015e-28 -
Entrance measured for metal grid
4'x6' + 4'x8' required
May 3rd - Easter log -
2015e-38
May 6th - Easter log -
2015e-39 -
Survey sink area and put in 3 'permanent' stations.
May 7th - Easter log -
2015e-39 -
Survey sink area and put in 3 'permanent' stations.
May 9th - Easter log -
2015e-39 -
Survey sink area and put in 3 'permanent' stations.
July 26th - summer log -
2015s-04;
2015s-04;
2015s-05 -
Cool Green Passage area. Part resurvey and some pushing.
July 27th - summer log -
2015s-06 -
Southern Passage part resurvey.
July 28th - summer log -
2015s-10 -
Resurvey S Passage and to N @ start of Afternoon Stroll.
July 30th - summer log -
2015s-10;
2015s-11;
2015s-12
August 6th - summer log -
2015s-32;
2015s-34 -
Push and survey "Puffin the Beaver"
0081-15-04 + 05 New length = 46m
TL=57891 + 46 = 57937m
August 7th - summer log -
2015s-33;
2015s-33;
2015s-33;
2015s-35;
2015s-35;
2015s-35 -
Surface survey + molephone
(1) Entrance now @ 0452786.5 4797778
(2) Collapse in path is now site 4190
(3) MP for edge of drop into final section of Cool Green Passage is 0452597.9 4797797.2 Altitude 158.4 …
August 14th - summer log -
2015s-48 -
Description end of Green Cool Passage
August 18th - summer log -
2015s-50 -
(1) Resurvey Mushroom field barn to entrance Carc. Agrees with previous survey.
(2) Surface survey stream from Alberto's barn to sink area.
August 21st - summer log -
2015s-51 -
Move contours + river on map.
August 23rd - summer log -
2015s-51
2016
March 18th - Easter log -
2016e-07 -
Entrance well blocked
July 22nd - summer log -
2016s-06 -
Well blocked - photos
2017
January 28th - Jan-Feb log -
2017jf-01 -
Entrance blocked at base of climb. Small whirlpool @ sink area. Overflow channel has no branches or vegetation.
July 30th - summer log -
2017s-16 -
Entrance free of debris
July 31st - summer log -
2017s-20 -
Resurvey and try to free-dive sump at end of S.W. Passage
August 1st - summer log -
2017s-30 -
Oxbow link surveyed from Afternoon Stroll
August 3rd - summer log -
2017s-30 -
Some survey to left not far from Afternoon Stroll. New length = ?
August 4th - summer log -
2017s-26;
2017s-26;
2017s-27;
2017s-27 -
(1) Sump @ end of S.W.Passage dived …
August 6th - summer log -
2017s-30 -
Sink area investigated. Crayfish seen.
More sinks in higher flow.
August 16th - summer log -
2017s-46
2018
April 4th - Easter log -
2018e-37;
2018e-38 -
Plan to dive through into Rocky Horror but too much water in bedding crawl to Eastern Series.Loose ends resurveyed. New extra = 60m
TL = 59161 (+121 in Riaño 105) = 59282m
2020
October 21st - autumn log -
2020a-11 -
Photo taken of sink area
2022
August 2nd - summer log -
2022s-29 -
Clear entrance
August 3rd - summer log -
2022s-29 -
Route finding to Sewers of Doom
August 7th - summer log -
2022s-29 -
Resurvey of Sewers of Doom
August 8th - summer log -
2022s-33 -
Resurvey of Sewers of Doom
August 9th - summer log -
2022s-31
August 11th - summer log -
2022s-33 -
Resurvey of Sewers of Doom
2023
July 31st - summer log -
2023s-15 -
360° phoptos, videos taken at nearly cleared and terraformed sink, chammel and overflow sink.
August 7th - summer log -
2023s-34 -
Some sinks now possibly blocked. Sound of water @ near S7.
August 30th - summer log -
2023s-72 -
Photos of 'lake' at sink area. Had been higher after recent showers.
2024
January 31st - Jan-Feb log -
2024jf-05 -
Checked for inclusion in 4VS scenarios
August 5th - summer log -
2024s-32;
2024s-32;
2024s-33;
2024s-33 -
Route finding
August 7th - summer log -
2024s-64 -
Familiarisationaround the entrances
August 8th - summer log -
2024s-50 -
Exploring W Series
August 11th - summer log -
2024s-60;
2024s-61;
2024s-62 -
Finding route to Red Column Chamber
August 17th - summer log -
2024s-75 -
Media downloaded.
2025
April 15th - Easter log -
2025e-19 -
Top of entrance cleared.
April 17th - Easter log -
2025e-24 -
Opened up by clearing logs etc.
August 7th - summer log -
2025s-51;
2025s-52;
2025s-53 -
Sewers survey. Batch 25-01
L=38.3m Also exploring in E Series.
August 8th - summer log -
2025s-39
August 12th - summer log -
2025s-45 -
More survey around Sewers
Batches 25-02, 03, 04
L=44.7+30.7+21.7
End of summer '25 TL=78718.2 (incl 0105+0107)
2026
April 5th - Easter log -
2026e-31;
2026e-32 -
Dive gear to Ovlov Sump in the Western Series. (Photos)
April 7th - Easter log -
2026e-45 -
50m dive through to chamber and passages. (Mark Smith)
April 10th - Easter log -
2026e-45 -
Surveyed new finds.
Batches 0081-26-01 and 0081-26-02
Total length 173.64 + 50 dive
4VS length = 79482 + 224 = 79706m
April 20th - Easter log -
2026e-48;
2026e-49 -
Link to dive 2 video: https://youtu.be/uufFzZMeQCE
May 4th - Easter log -
2026e-50 -
Link to dive 1 video: https://youtu.be/EIUUEtCZf6s
August 9th - summer log -
2026s-32;
2026s-32;
2026s-33;
2026s-33 -
Some small extensions aroundAfternoon Stroll / Boys Entrance.
August 10th - summer log -
2026s-34;
2026s-34;
2026s-35;
2026s-35;
2026s-36;
2026s-36;
2026s-37;
2026s-37;
2026s-47;
2026s-47 -
To "Big Chamber Near the Entrance". A slot just beyond where you drop into the stream way. The climb is reasonably tight between boulders, and leads up into a large chamber with significant breakdown, possibly made from sandstone. Advise only go up there if you really need to!
August 13th - summer log -
2026s-49 -
Further investigations around dig in Afternoon Stroll. Some surveying.
August 14th - summer log -
2026s-50;
2026s-51;
2026s-51 -
Further investigations around dig in Afternoon Stroll. Some surveying over the days
Total survey batches 26-03, 04, 05
L=76 and 67 combined = 143m
4VS = 80031+143 = 80174m
end of summer 2026: TL = 80300m