Extra notes from card index
• 1979 in log? Scaling - where? (on boulder slope to right of Lake?)
• Card missing?? Should be at least L87 and more?
• L99E : Extensions opp. Straw Passage TL=41687
• 2000 : Extensions at Easter and summer 2000 in Uzueka TL = 42863m
• Easter 2001 Extensions in Carcavuezo TL = 42951m
• L06A : TL = 44480m after autumn '06 explorations in Riaño 105.
• GPS 'top of scar' 045657 4798397 Altitude 155m
Entrance now @ 0454657 4798387 ALtitude 128m
• AFter Easter 2007 TL = 45306m (Ext. in Biggo and Riaño)
• After December in 105 TL=49344m
• Easter 08
Riaño survey 154.7, Hoyuca (Gour Inlet) 369.3, Llueva (New CHamber) = 280.6 Total =804.6
TL 4VS =49344+804.6 = 50149m This doesn't include any adjustments for the Giant Panda entrance.
• With Hoyuca addition TL=51642m
• L09E: Trip into top levels aborted because of water on 80m climb
• After Easter 09 4VS TL revised = 51697m
• Summer 09 and Febraury 2010 in Riaño TL = 52788m
• L11E: 4VS length ~ 54249m
• September 2015 4VS TL=57999m
• September 2015 Smack Choke pano from PF
• Easter 2018. 4VS length = 59282m
• Summer 2019 4VS length = 67126m (3234 linked)
Orphan card index date references to logbook pages
• [31/07/1977] New passage explored + surveyd in Near Series
• [02/08/1982] Extension opposite entrance pitch needs pushing.
• [10/08/1984] tourist trip
• [02/05/1995] SRT route into entrance bypasses jungle bash. To head of pitch.
• [02/08/1999] See 81 card TL=42215m
See 114 card TL = 42316
• [07/08/2007] Extended through tight crawl to pitches into big passage. Link to top of p surveyed. TL=195+ 47287 = 47482m
• [14/08/2007] Boulders at end of Paleokarst Passage investigated.
• [19/08/2007] Batches 2007_08_19 + 2007_08_19-2 263.9m TL=49096m
• [12/04/2009] Stal grill @ high level smashed but needs more. Avens looked at but not climbed.
• [01/05/2012] Surface survey. Photos. 30T 0454645 4798398 Altitude 125m
• [20/04/2014] entrance p ws rigged as a traverse to the left througha passage. Ladder @ end here removed and replaced with rope. Visited Big Bang Burger Bar to view bolting possibilities.
• [22/04/2014] Climbed @ BBBB 11 bolts used to create a free-hanging p20. Surveyed batch 14-01 (161m)
• [23/03/2016] Bolting up Fault Aven
• [02/08/2017] (Re)surveying in Biggo. See 107 for length.
• [04/08/2017] See Carcavuezo (81) card for dive from Strangle Wanking to Hoyuca.
Dated logbook entries with card index notes
1976
July 23rd - summer log -
1976s-14;
1976s-15;
1976s-16 -
Shale dug away, head of pitch. Juan, Lank, Ian.
July 24th - summer log -
1976s-17;
1976s-18 -
Exploration + surveying to Lake
July 26th - summer log -
1976s-20;
1976s-21 -
Survey and traverse round lake to enter far chamber.
August 4th - summer log -
1976s-33;
1976s-33;
1976s-34 -
RH Bypass exploration + survey
August 6th - summer log -
1976s-38;
1976s-39 -
Upstream exploration to sump.
August 7th - summer log -
1976s-43;
1976s-44;
1976s-45 -
Downstream exploration
August 14th - summer log -
1976s-53;
1976s-54;
1976s-55;
1976s-75 -
RH Bypass lassooing, photos
August 20th - summer log -
1976s-75
1977
July 18th - summer log -
1977s-14 -
Abortive downstream trip. Upstream poked about in.
July 23rd - summer log -
1977s-24;
1977s-25;
1977s-26 -
Downstream photography
August 9th - summer log -
1977s-82 -
Abortive downstream dive. New passage at upstream end.
August 11th - summer log -
1977s-87 -
Biggo downstream dive. -20m
1978
July 18th - summer log -
1978s-08;
1978s-24 -
Detector placing
July 30th - summer log -
1978s-16;
1978s-24 -
Dye test result. Pushing to Lake RHS
August 6th - summer log -
1978s-19;
1978s-24;
1978s-31;
1978s-32 -
Fault Extension pushed, surveyed.
1979
January 1st - summer log -
1979s-48
August 14th - summer log -
1979s-24
August 16th - summer log -
1979s-20 -
Radio location not successful
August 21st - summer log -
1979s-40;
1979s-40;
1979s-42;
1979s-42 -
More scaling at end of LH Bypass.
August 22nd - summer log -
1979s-43 -
Diving and push around Fault Chamber
1980
July 22nd - summer log -
1980s-10 -
Bolts put in climb over Fault Chamber. Swedish Lady.
July 27th - summer log -
1980s-15 -
More bolting Swedish Man.
January 1st - summer log -
1980s-59
August 8th - summer log -
1980s-32 -
Bolting. Sump bypass remote.
August 9th - summer log -
1980s-35 -
tourist trip
August 12th - summer log -
1980s-46 -
Phil & Fred dive through to passage + boulder choke
August 14th - summer log -
1980s-50 -
Dive and further exploration of choke. Uzueka team in at the same time. Sledge hammer fails to impress cascades. Draughting rift attempted at dive base. +FLYS
August 18th - summer log -
1980s-56 -
Solo survey by Phil of extension beyond sump. Holes around canal looked at. SKETCH
1981
August 5th - summer log -
1981s-53;
1981s-54 -
Dive into extension upstream. Lugger into extension. Smoke through from Uzueka.
August 11th - summer log -
1981s-63;
1981s-64;
1981s-65 -
Phil, John, Fred beyond upstream sump with surveying and exploring through boulders.
August 24th - summer log -
1981s-89;
1981s-90 -
tourist trip
1982
August 3rd - summer log -
1982s-20
1984
August 6th - summer log -
1984s-40;
1984s-41;
1984s-42;
1984s-58 -
Diving trip aborted. LH Bypass extended? SKETCH 200ft? Which end?
August 11th - summer log -
1984s-83
1985
August 14th - summer log -
1985s-66;
1985s-67;
1985s-68;
1985s-70;
1985s-71 -
(1) Tackle up and video
(2) Later on - 6 people beyond sump into mega passage. Carcavuezo water met.
August 17th - summer log -
1985s-81;
1985s-82;
1985s-83;
1985s-84 -
Into extension: pushing near to R Horror. SKETCH
August 22nd - summer log -
1985s-91 -
Detackle + video
1986
July 20th - summer log -
1986s-12;
1986s-13;
1986s-14 -
Extending in 85 extensions.
(1) Inlet on left 100m before Rhinocerus. Needs pushing still with possible surface connection.
(2) 400m in oxbow?
July 25th - summer log -
1986s-31 -
Surveying trip to end and side passages.
July 27th - summer log -
1986s-40;
1986s-41 -
Surveying "Carcavuezo" arm and smoke bomb set off.
January 1st - summer log -
1986s-92
August 2nd - summer log -
1986s-54;
1986s-55;
1986s-62;
1986s-63;
1986s-64;
1986s-65 -
(1) Smoke bomb off in Carc. Arm
(2) Joined to Uzueka at Rocky Horror.
August 4th - summer log -
1986s-70;
1986s-73
August 7th - summer log -
1986s-81;
1986s-83 -
Resurvey of main line up to LH Bypass and surface survey. Hole in roof seen at top of 1st hill.
August 9th - summer log -
1986s-87;
1986s-87 -
(1) Scale up into hole. No go.
(2) Downstream look.
August 12th - summer log -
1986s-96;
1986s-96 -
Uzueka link surveyed
August 14th - summer log -
1986s-99 -
Surveying + extending boulder choke at Uzueka connection.
August 20th - summer log -
1986s-A8
1987
July 27th - summer log -
1987s-04
July 29th - summer log -
1987s-07;
1987s-08;
1987s-09
August 3rd - summer log -
1987s-33
August 4th - summer log -
1987s-75
August 5th - summer log -
1987s-27;
1987s-28;
1987s-29;
1987s-31
August 7th - summer log -
1987s-75
August 8th - summer log -
1987s-46;
1987s-47
August 15th - summer log -
1987s-68;
1987s-75
1989
July 28th - summer log -
1989s-24
July 29th - summer log -
1989s-23;
1989s-58
July 31st - summer log -
1989s-33;
1989s-58
January 1st - summer log -
1989s-51
August 13th - summer log -
1989s-94
1995
June 2nd - Whit log -
1995w-10
August 8th - summer log -
1995s-63;
1995s-67;
1995s-68 -
Entrance reached through jungle after 3 hours
August 11th - summer log -
1995s-78 -
Bottle carried in. RH Bypass has dig to sound of stream. LH Bypass extended slightly up inlets.
August 12th - summer log -
1995s-81 -
Dived into boulders (downstream). Bad vis.
1996
August 8th - summer log -
1996s-24
1999
August 6th - summer log -
1999s-29;
1999s-42
2000
August 4th - summer log -
2000s-20 -
tourist trip. Entrance approach from meadow and round the back.
2001
January 1st - Easter log -
2001e-43
2007
April 7th - Easter log -
2007e-28;
2007e-29 -
And following day (1) Surveyed chamber up from pitch L=139m
(2) Surveyed up sandstone-floored inlet off LH Bypass. Ends at sump L=92m
(3) Re-explored passage rising from lake. P30 may not be above main chamber.
April 9th - Easter log -
2007e-28;
2007e-29 -
And previous day (1) Surveyed chamber up from pitch L=139m
(2) Surveyed up sandstone-floored inlet off LH Bypass. Ends at sump L=92m
(3) Re-explored passage rising from lake. P30 may not be above main chamber.
July 30th - summer log -
2007s-19;
2007s-20 -
(1) Scaled in entrance chamber to loop not surveyed.
(2) Extended up high part way up Fault Passage. L=246.5 v.r.=+80m
TL=45306+247 = 45553mk
July 31st - summer log -
2007s-24;
2007s-25 -
Extended in Fault Passage extension
TL=45553+428 = 45981m
January 1st - summer log -
2007s-62;
2007s-63
August 2nd - summer log -
2007s-25;
2007s-26 -
Extended in Fault Passage extension. Down into parallel overflow streamway below large chamber. Whole series called "Life, The Universe + Everything"
TL=665.2+45981m = 46646m
August 3rd - summer log -
2007s-26;
2007s-27 -
(1) Trip through upstream sump.
(2) Trip to downstrream sump (same team). Narrow passage at sump may bypass it?
August 4th - summer log -
2007s-23;
2007s-24;
2007s-27 -
567m surveyed in high and low level passages.
TL=46646 + 567 = 47213m
August 6th - summer log -
2007s-34;
2007s-35 -
(1) Chamber surveyed but not tied into previous survey. Problems with survey gear. TL=73.6
(2) Pitch down to chamber capped out
TL=73.6 + 47213 = 47287m
August 8th - summer log -
2007s-36;
2007s-42
August 9th - summer log -
2007s-37;
2007s-42;
2007s-45 -
1.1km surveyed down pitches
TL=105s + 47482 = 48534m
August 11th - summer log -
2007s-45;
2007s-46 -
(1) Link to Big Chamber 31.6m
(2) Link from Fault Passage to flash bulb discovered 9/8/07 38.9 TL=48605m
August 13th - summer log -
2007s-55 -
(1) RH Bypass resurveyed
(2) Paleokarst Passage 226.5m TL=48832m
August 20th - summer log -
2007s-60 -
Familiarisation trip. Noted bedding slot before up into big passage.
August 22nd - summer log -
2007s-60 -
(1) Remove entrance pitch rope.
(2) Noted water rising and only 2 steps available onboulders tops to reach high level boulder passage.
(3) Waterfall out of cave above entrance to Biggo.
2008
January 1st - Easter log -
2008e-00
March 17th - Easter log -
2008e-04;
2008e-05;
2008e-07 -
Rigging cave and pushing past 'stal grille'. Surveyed 53m
TL=49397m
March 18th - Easter log -
2008e-21;
2008e-62;
2008e-63;
2008e-79 -
Eldon?
(1) Pushing around chokes and sump area. Surveyed ?
(2) Surveyed RH Bypass to drop into chamber @ LH Bypass + right hand side of lower levels.
(3) Surveyed 138m
March 19th - Easter log -
2008e-09 -
Looking at terminal choke at W end. N choke has definite draught. Gypsum crystals found in hole down along wall of passage leading to Edge of Darkness.
March 20th - Easter log -
2008e-12 -
Danes in - familiarisation.
March 22nd - Easter log -
2008e-18 -
Traverse line rigged just after entrance pitch to allow access during high water. Too much water at pitch up into extensions.
March 27th - Easter log -
2008e-53;
2008e-53;
2008e-54;
2008e-54 -
(1) Other exploration while 'new chamber' was being explored: Upstream passage from top of second pitch.
(2) Survey of 2nd small east? Heading chamber.
(3) Chamber survey.
January 1st - Easter log -
2008e-76
April 1st - Easter log -
2008e-73
April 6th - Easter log -
2008e-83 -
tourist trip to BRKR. Entrance pitch detackled of rope.
2009
April 9th - Easter log -
2009e-52 -
Photos in RH Fault Passage. Pushed into rift not on survey but evidence of (Spanish?) visitors.
April 14th - Easter log -
2009e-52 -
Another visit where "50m" climb up was possibly carried out but not surveyed.
2012
February 19th - Jan-Feb log -
2012jf-08
April 30th - Easter log -
2012e-54
May 15th - Easter log -
2012e-55 -
(1) Video of depression.
(2) Fireplace seen 11m insode from second wall. Photos / video. (Pete S has visited "fire place")
May 27th - Whit log -
2012w-02
August 3rd - summer log -
2012s-35;
2013s-02
August 8th - summer log -
2013s-02
2014
April 24th - Easter log -
2014e-48 -
Continued surveying 14-02 (425m) Totalo length surveyed = 576m. High level high above Lake area
4VS TL=57364
2015
November 10th - autumn log -
2015a-09 -
Checked out 2014 extension. Looked in NE choke. No way on.
2016
March 22nd - Easter log -
2016e-14;
2016e-15
March 24th - Easter log -
2016e-15;
2016e-16 -
More bolting but only small aven at top.Footprints seen probably from 35 years ago. Survey?
March 26th - Easter log -
2016e-21 -
New? explorations off the LH Bypass.Not surveyed.
March 30th - Easter log -
2016e-30 -
Batch 16-01 126.5m LH Bypass extension New=87.1m
4VS TL=57999+87 = 58086m
2017
August 16th - summer log -
2017s-46
2022
April 15th - Easter log -
2022e-30
2023
April 5th - Easter log -
2023e-13;
2023e-14 -
BBBB '2014 extensions' looked at. No survey?
April 7th - Easter log -
2023e-22;
2023e-26 -
Extension bolted up. Photos. 15m from top of bolt climb.Continues up steep muddy slope and may communicate with adjacent aven. (2 accounts)
2024
January 31st - Jan-Feb log -
2024jf-05 -
Checked for inclusion in up-to-date 4 Valleys Survex scenario.
2025
February 10th - Xmas- New Year log -
2024c-31
February 23rd - Xmas- New Year log -
2024c-33
Published documents: print and digital
• [D]
Cope J et al, 1976 The 1976 Expedition to Matienzo, Northern Spain J. Manchester University Speleological Society, No. 8
• pp1-6 - account + survey + photos
• [F]
Corrin J et al, 1978 Matienzo 1978 J. Manchester University Speleological Society No 9
• p4 - diving
• [H]
Addis F et al, 1979 The 1979 Expedition to Matienzo, Santander, N. Spain • pp2-3 - account with survey
• [Q]
Corrin J, 1980 Matienzo 1980 Caves & Caving 11, Feb. 1981
• p10 - account
• [P1]
Corrin J et al, 1981b Matienzo Expeditions 1979-80 J. Manchester University Speleological Society No. 10
• pp2-3 - account with sketch of extension at end of LH Bypass.
• p4 - Fault climb and diving• p5 - 170m from Uzueka
• [P3]
Corrin J et al, 1981a Matienzo Expedition 1981 J. Manchester University Speleological Society No. 10
• p(i) - account of diving extensions ~70m apart
• [R]
Corrin J, 1981 Matienzo 1981 Caves & Caving 14, Nov. 1981
• p17 - description
• [T1]
Mills L D J, 1981 Caves & Caving in Matienzo BCRA Transactions Vol 8(2)
• p56 - 1976 1st entry to over 2.5km length.
1977 Upstream - downstream sumps dived. Dye test from Uzueka.
1979 Dive upstream by PP
1980 4 divers past upstream sump 170m from Uzueka
• p59 - Photo. Phreas downstream• p62 - Photo main passage
• [T2]
Mills L D J and Waltham A C, 1981 Geomorphology of the Matienzo Caves BCRA Transactions Vol 8(2)
• p73 - Survey 1980 scale 1cm = 31.7m
• p77 - early link with Llueva - vauclusian rising in Llueva valley, before diversion to Secadura• p78 - Elevation on area map• p83 - Sandstone as control• p64 - Survey on simple geol. Map• p71 - Geomorph. Description
• [W2]
Smith P, 1982b La Expedicion Inglesa a Matienzo 1981 Boletin Cantabro de Espeleologia 2, April 1982
summary
• [G]
Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions • p44 - account of 81 + 82 extensions PL=2800 d=44m
• [CJ]
Cawthorne B, 1985a Matienzo 1984 Newsletter No. 45. March 1985. W Pengelly Cave Studies Trust
• p14
• [CZ]
Cawthorne Bob, 1985b Matienzo 1984 Plymouth Caving Group Newsletter and Journal, No. 94, Feb. '85
• p4 - Diving carry and LH Bypass explorations
• [N]
Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p16 - Extensions resumé. Area map.
• [O]
Corrin J, 1987 Matienzo '86 Caves & Caving 35, Spring 1987
• p18 - 1986 resumé, survey and photos
• [BF]
Fernández V, 1988 Deterioro de los Aspectos Paisajisticos y Naturales El Deterioro en las Cuevas de Cantabria (Monografias ACDPS no 3)
• p28 - Sculptures as defacing caves.
• [BP]
Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - On area map
• p347 - hydrology
• [CX]
Corrin Juan, 1995a Matienzo '95 Caves & Caving, Issue 70, Winter '95
• p25 - Sentence.
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • pp412-416
• [DV] Corrin Juan, 1997c
El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p712
• [DT] Fernández Ortega F and Valls Uriol, M C, 1998
Los Colores de la Oscuridad. Cantabria, Paraíso Subterráneo. Creática, Santander • pp67-70
• [ED]
Corrin Juan, 2001 Matienzo 2000 Caves & Caving 89, Winter 2000/2001
• pp31-33 - Summary of 4VS.
• [EF] Corrin Juan, 2001a
The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p15 - Mentioned in summary article
• [FD]
Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p32 - Mention in Spanish summary article
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• pp23-24 - summary
• pp22-23 - Survey• p20,23 - Photos
• [FM]
Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p19
• [FO]
cantasub2010-vol1.pdf and
cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2 • p458 - photography
• pp475-480 - Description of 4VS History, line survey• pp478-479 - photos
• [KL] Corrin Juan et al, 2025
Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161
(area map + photos)