MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0105 Riaño, Cueva de
Riaño 1, Cueva de Reñada, Cueva de la
Riaño - 30T 0451780 4800279 Altitude: 155m
Website description for site 0105   |   Site in context, area map

Extra notes from card index
• Cueva de la Reñada
• Note on '91 extensions: All of the downstream main passage was previously known and surveyed. Side passage is new. 4 Valleys length has been adjusted.
• 4 Valleys length = 40439m
• end '94 TL=40596m
• Easter & Summer 2000: Extensions in Uzueka. TL=42853
• Easter extensions 2001: TL=42951
• Easter '07 All 07E passages in SchoolBoy Error Aven area total of Easter passages surveyed = 604.5m (See Uzueka for 4 Valleys length) TL=604.5 (Riaño) +221(Biggo) +44480 = 45306m
• Autumn 2007 December. 89Cents Tinto Extension 248.3m Total 4VS = 49096 + 248.3=49344m
• Easter '08 Total Riaño survey = 154.7m Total Hoyuca (Gour Inlet) survey = 369.3m. Total Llueva (new chamber) = 280.6m Total = 804.6m So TL 4VS = 50149m (without Giant Panda adjustment)
• TL=51642m (Uzueka extended)
• Survey off entr. Passage
• Summer 09 4VS Revised TL = 51697m -> 52439m
• February 2010: 4VS length = 52788m See also accounts for 20-2-10+ 21-2-10 + 22-2-10 after 30-10-11 in L11A
• 4VS ~54249m
• Also exploring passage to R of Acid Bath (account after 26/8/11)
• See also L11A after 30/10/11
• After Easter 2016 4VS TL = 58086m
• TL=59101 (recalc) + 121 + 60 (in Carc.) = 59282m
• End of summer 2019 4VS TL = 67126m
• Batch 24-07? = 114m 1/8/24?
• End of summer '25 TL=78718.2m

Orphan card index date references to logbook pages
• [13/08/1976] (?date?) Exploration and survey maze
• [04/08/1991] Survey / push inlet at base of 8m cascade in downstream 671m surveyed.
• [06/08/1991] Intention to explore downstream but Grov slips.
• [05/08/1991] Surface survey from entrance to risings.
• [08/04/1993] Pitch descended on R of main passage some way from Anastomoses climb. Not surveyed.
• [06/12/2007] 6th to the 11th December - log book account : 3 days in Riaño
• [05/08/2011] Some resurveying around Crystal Mines
• [15/07/2016]
• [31/08/2018] North end of Grey Rift Grey Rift Loop
• [01/04/2018] North end of Grey Rift Grey Rift Loop L=120.6m
• [12/08/2019] ??No note
• [05/04/2024] Batch 24-02, 03, 04 154m length
• [09/06/2024] Latest pdf from PF
• [06/08/2024] Batch 24-17 L=115.3m 4VS = 76166.49m
• [24/04/2025] (1) Pendant Chamber exploration; bolting a rift. (2) Photos.
• [25/04/2025] At end of Easter 2025 TL of 4VS = 78544m

Dated logbook entries with card index notes

1974

August 7th - summer log - 1974s-33 - exploration
August 14th - summer log - 1974s-66; 1974s-67 - exploration and survey
August 15th - summer log - 1974s-70

1975

July 19th - summer log - 1975s-06
January 1st - summer log - 1975s-70

1976

August 15th - summer log - 1976s-56; 1976s-57

1984

July 31st - summer log - 1984s-13; 1984s-14; 1984s-15; 1984s-16 - Poking about

1985

August 16th - summer log - 1985s-76; 1985s-77; 1985s-78 - Extending in various places. Catprint passage and above.
August 17th - summer log - 1985s-78; 1985s-79; 1985s-80 - Two teams pushing and surveying
August 20th - summer log - 1985s-87; 1985s-89; 1985s-90; 1985s-91 - Pushing and surveying

1986

July 19th - summer log - 1986s-09; 1986s-11 - (1) Connected to Uzueka via 2nd River Inlet (2) 50m extra at the connectionpoint - up an inlet.
July 25th - summer log - 1986s-29; 1986s-30 - Bat Chamber look. SKETCH
July 29th - summer log - 1986s-49 - Bat Chamber surveyed. Still pitches to do and climb to scale into.
August 1st - summer log - 1986s-61 - Pitches above done.
August 15th - summer log - 1986s-A4 - toLDJM's passages. Down 15' + 20' ps detackle
August 18th - summer log - 1986s-A5 - detackling
August 21st - summer log - 1986s-B0

1987

August 4th - summer log - 1987s-26; 1987s-29; 1987s-30; 1987s-75 - Small amount surveyed near Catspaw Passage
August 6th - summer log - 1987s-37 - Shaft dropping in or near Cats Whisker Bypass and beyond
August 7th - summer log - 1987s-39
August 10th - summer log - 1987s-48; 1987s-75 - Surveying in Maze
August 15th - summer log - 1987s-63; 1987s-75 - Surveying at end

1988

January 1st - summer log - 1988s-A6
August 8th - summer log - 1988s-57 - Crystal Mines connected to main passage. Can reach end without a ladder. Surveyed small amount of new.
August 13th - summer log - 1988s-83 - Photo trip to Cystal Mines and large chamber

1989

January 1st - summer log - 1989s-00
August 8th - summer log - 1989s-97; 1989s-98 - Bits and pieces. Investigate Double Barrell Passage. Try to descend pitych near The Prison. Acid Gas Way.

1991

August 7th - summer log - 1991s-38 - Pushing tube at top of cascade. 313m surveyed to slightly beyond downstream sump.
August 8th - summer log - 1991s-41; 1991s-41; 1991s-42; 1991s-42 - Finishing cave found 7/8. Followed downstream beyond sump to T junction.
August 9th - summer log - 1991s-42; 1991s-43; 1991s-45 - Trip to push at end.
August 14th - summer log - 1991s-71 - Detackled and bits pushed

1992

July 21st - summer log - 1992s-01 - Resurvey of entrance passage to downstream junction. Seems to go wrong near head of pitch and this bit needs resurveying.
August 2nd - summer log - 1992s-24 - Push inlet at LHS downstream. Surveyed 46m

1993

July 25th - summer log - 1993s-05 - Smoke test done at end of passage neading to surface. Smoke seen emerging from Dormouse Cave (935) and nearby boulder choke - all draughting.
August 9th - summer log - 1993s-55 - Another look at Big Chamber

1994

April 8th - Easter log - 1993e-12; 1993e-13

1995

April 17th - Easter log - 1995e-15; 1995e-17 - Bolting. Not surveyed.

1999

March 31st - Easter log - 1999e-11; 1999e-12 - Trip to previously surveyed passages at large block. Also extensions in Carcavuezo / Biggo TL = 41687m

2000

April 21st - Easter log - 2000e-13
July 31st - summer log - 2000s-15

2001

August 5th - summer log - 2001s-24 - Attempt to find Mad Axe Woman from inside Riaño. Joss sticks used.

2006

April 14th - Easter log - 2006e-38
April 16th - Easter log - 2006e-39 - GPS and photo entrance
April 17th - Easter log - 2006e-44; 2006e-45 - Re-opened. Inlet pushed
April 18th - Easter log - 2006e-46 - Inlet pushed. 245.3m surveyed. Batch 06-01 - lots of leads to look at. 4 Valleys System is now 43437 + 245 = 43682m
July 30th - summer log - 2006s-08; 2006s-09 - Checking passage details for survey
July 31st - summer log - 2006s-12 - Easter 06 extensions 128m surveyed. TL=128+43682 = 43810m
August 2nd - summer log - 2006s-20; 2006s-21 - Resurveying
January 1st - autumn log - 2006a-10
December 10th - Xmas - New Year log - 2006c-04; 2006c-05 - Climb aven at northern end. "Schoolboy Error" aven into 470m passage. Surveyed roof passages found in August. 200m
December 11th - Xmas - New Year log - 2006c-06; 2006c-07 - Surveyed 470m 13.5hr trip. TL = 44480m
December 12th - autumn log - 2006a-09
December 14th - autumn log - 2006a-09

2007

March 31st - Easter log - 2007e-01; 2007e-02 - 122m surveyed Batch Riaño_070331
January 1st - Easter log - 2007e-03; 2007e-38
April 2nd - Easter log - 2007e-07; 2007e-07; 2007e-07; 2007e-07; 2007e-08; 2007e-08; 2007e-08; 2007e-08 - 35m surveyed Batch Riaño_070331
April 4th - Easter log - 2007e-41; 2007e-42 - (No account in log) "Dave's Runaround" Batch 070404a Length =43.7. Pitch down into Quake Rift. Batch 070404b Length = 70.2m
January 1st - summer log - 2007s-63
December 7th - autumn log - 2007a-14; 2007a-14; 2007a-15
December 8th - autumn log - 2007a-15
December 9th - autumn log - 2007a-15
December 21st - autumn log - 2007a-13

2008

January 1st - Easter log - 2008e-00
March 19th - Easter log - 2008e-30 - Pushing at end of Pray Aven near surface at end of 89cents Tinto passage.
March 20th - Easter log - 2008e-10; 2008e-10; 2008e-31; 2008e-31; 2008w-01; 2008w-01 - 1st through trip Uzueka to Riaño
March 21st - Easter log - 2008e-32; 2008e-33 - Acid Bath push. Mud / boulders
March 22nd - Easter log - 2008e-29; 2008e-34 - Survey
April 1st - Easter log - 2008e-73

2009

April 8th - Easter log - 2009e-30; 2009e-31 - Top of School Boy Error Aven 20m of passage?
April 12th - Easter log - 2009e-31; 2009e-31; 2009e-32; 2009e-32; 2009e-33; 2009e-33 - (1) Into passage through boulders near entrance - about 100m? Egg shells and bones. (2) Surveying and resurveying

2010

February 20th - autumn log - 2011a-09
February 21st - February log - 2010f-02; 2011a-09
February 22nd - autumn log - 2011a-09; 2011a-10
February 26th - February log - 2010f-04
August 11th - summer log - 2010s-47; 2011a-12 - Looking for 'pitch 8m' at 2nd River Inlet into Uzueka. Details not correct?

2011

January 1st - Easter log - 2011e-37
June 28th - summer log - 2011s-02
July 1st - summer log - 2011s-02
August 4th - autumn log - 2011a-13; 2011s-31 - In 11A Pendant Chamber survey and extension.
August 7th - autumn log - 2011a-15; 2011s-38 - (Re) surveying Length of new cave unknown
August 9th - summer log - 2011s-34; 2011s-65 - u/d pitch @ farend.368 Pitch blind
October 10th - autumn log - 2011a-02

2012

February 9th - Jan-Feb log - 2012jf-04
February 19th - Jan-Feb log - 2012jf-08; 2012jf-08
February 20th - Jan-Feb log - 2012jf-09; 2012jf-09; 2012jf-10
May 25th - Whit log - 2012w-01
August 7th - summer log - 2012s-73; 2013s-02 - South of Pete's Way.DistoX file length 90.7m

2013

March 25th - Easter log - 2013e-08; 2013e-63; 2013e-64 - Pitfall traps set
March 26th - Easter log - 2013e-08; 2013e-09; 2013e-64; 2013e-65 - Part survey downstream. Probably entered and surveyed Ghost Rift. Some new passage found. 2 accounts.
March 28th - Easter log - 2013e-35; 2013e-67; 2013e-68; 2013e-69 - Trip to link to Torno. Large rift but needs aids to progress (3 accounts)
April 3rd - Easter log - 2013e-21; 2013e-21 - Pitfall trap removed. New survey …
April 10th - Easter log - 2013e-59

2015

August 1st - summer log - 2015s-17; 2015s-18 - Resurvey Ghost Rift area? Freid Egg on a Stick L=102.7m This is a resurvey. Stations : 215.n in batch 0105-new100220-150801.top

2017

August 16th - summer log - 2017s-46

2018

March 31st - Easter log - 2018e-15
April 3rd - Easter log - 2018e-27 - Traps set?

2019

July 29th - summer log - 2019s-07; 2019s-08 - Look for surface sub phone point for poss. connection to 3234.
July 30th - summer log - 2019s-09; 2019s-09; 2019s-10; 2019s-10; 2019s-11; 2019s-11; 2019s-12; 2019s-12 - (1) Surface suphone team talked to Riaño team. (2) Most digging in Torno Inlet through to 3234 (3) Torben through connection from 3234. TL 4VS = 59367 + 7268 + 24 = 66659m …
July 31st - summer log - 2019s-13 - Connection surveyed. Batch 0105-19-01 356 new Also new passages in area. Spiral Ramp and Snady Swims
August 4th - summer log - 2019s-15 - V. strong draught @ entrance.
August 8th - summer log - 2019s-28; 2019s-29 - First Llanío-Riaño through trip. En-route visited Ammonite Choke in Riaño. Pushed up well into Ammonite Choke with more to do. 48m surveyed in batch 0105-19-02 4VS length = 66659+48 = 66707m

2021

October 20th - autumn log - 2021a-09

2024

January 31st - Jan-Feb log - 2024jf-05 - Checked for inclusion in 4VS scenarios
April 3rd - Easter log - 2024e-35 - Explore and survey up inlet. Still going. Batch 24-01 154m length.
April 7th - Easter log - 2024e-39; 2024e-41; 2024e-42 - (1) Looking at cave formation. (2) Batch 24-05 99.5m Total 0105 extension = 408m 4VS = 74611m
July 18th - summer log - 2024s-13 - Various solo work. See log.
July 19th - summer log - 2024s-13 - Various solo work. See log.
July 21st - summer log - 2024s-13 - Various solo work. See log.
July 27th - summer log - 2024s-14; 2024s-15 - (1) Batch 24-06 off La Playa. Splits - slight draught.Notes on survey. L=72.3m (2) At end of cave. Sketch.
July 30th - summer log - 2024s-16; 2024s-17; 2024s-18 - Batches 8 and 9. Maze passages and large chamber
July 31st - summer log - 2024s-18; 2024s-19; 2024s-20 - Batches 10, 11, 12. TL 2024 summer so far is 510m 4VS = 75370.8m
August 1st - summer log - 2024s-23; 2024s-24; 2024s-25; 2024s-26; 2024s-27 - Batches 13 + 14 L = 271 + 223
August 3rd - summer log - 2024s-31; 2024s-31 - Visit by James + 7yr-old Juan
August 5th - summer log - 2024s-33; 2024s-34
August 13th - summer log - 2024s-68; 2024s-69; 2024s-70; 2024s-71 - New series of chambers reached by climbing. Photos and video in log book. Survey batch 24-18 L=70.2 76236.7m
August 14th - summer log - 2024s-71 - Trip to pitch Jaun Carlisle
August 15th - summer log - 2024s-71
August 18th - summer log - 2024s-76 - Media download.
November 3rd - autumn log - 2024a-32; 2024a-33 - Anemometer used in entrance 2.44m/s 15.9°C

2025

February 20th - Xmas- New Year log - 2024c-32 - Gypsum Needles photo from Lank via PS. (Added to stals page).
April 8th - Easter log - 2025e-03 - Re-investigate passage heading towards Dormouse Cave. Inlet surveyed (short) 0105-25-01 (entered?) 21m
April 14th - Easter log - 2025e-12; 2025e-13 - Batch 25-02 32m Up bolt climb
April 15th - Easter log - 2025e-18; 2025e-19 - Natch 25-03 66m
April 18th - Easter log - 2025e-29; 2025e-43; 2025e-44 - Batch 25-04 25m Amendments on sketch later in log book.
April 21st - Easter log - 2025e-48
April 23rd - Easter log - 2025e-58
July 29th - summer log - 2025s-16 - Look around Mouse Print Passage. One dig a possibility with hammer and chisel. Re-surveyed - batch 25-06
July 31st - summer log - 2025s-21 - Up Torno Inlet.
August 1st - summer log - 2025s-21 - Mouse Print Passage - a few metres of progress.
August 2nd - summer log - 2025s-23 - MPP - through into extension (Wise Choice) with 21.5m aven. LH Aven and a RH Aven. Surveyed. Possible high level. Batch 25-07 38.8m
August 8th - summer log - 2025s-34; 2025s-35 - Torno Inlet.
August 10th - summer log - 2025s-37 - (1) Mouse Print Passage aven bolting. 5m short of a possible ledge. (2) Small dig; 4m passage to stall grill.
December 9th - Xmas - New Year log - 2025c-02 - Updated svx file from PF.

2026

April 3rd - Easter log - 2026e-26; 2026e-27 - Shrimp sampling in various passages. Photos
April 4th - Easter log - 2026e-15 - Mouseprint Passage. Couldn't reach avens because of too much water.
August 11th - summer log - 2026s-47 - Bolt traverse high off Pendant Chamber heading south into new area with leads.
August 14th - summer log - 2026s-62; 2026s-63; 2026s-64 - (1) Pitch at end of traverse. Very tight. (2) Right at end of traverse: pitch to 125m of open stomping canyon. P down and continues.
August 16th - summer log - 2026s-64; 2026s-65 - Pitch down at end of traverse into Sand Canyon. Pitch down. Tight rifty passage not surveyed: issues with the SAP6. Diagram in log book. 4VS at end of summer 2026 TL=80249m

Published documents: print and digital

• [B] anon., 1974a Matienzo, North Spain - The 1974 British Expedition Report
• p2 - account
• pp19-22 - account and survey?
• [BK] Cope J, 1974 Northern Spain, Summer Holidays 1973 J. Manchester University Speleological Society No. 7
Account of first exploration
• [C] Kendal Caving Club / Manchester University Speleological Society, 1975 Report of the British Expedition to Matienzo
• p28 - cave position
• p33 - drainage
• [E1] Fernández Gutiérrez J C, 1975 Noticias y Reflexiones sobre las actividades de la S.E.U.M. en el área de la depresión de Matienzo . . . 1969 - 1974 Cuadernos de Espeleología Vol. 8
• p147
• [D] Cope J et al, 1976 The 1976 Expedition to Matienzo, Northern Spain J. Manchester University Speleological Society, No. 8
• p18
• [T1] Mills L D J, 1981 Caves & Caving in Matienzo BCRA Transactions Vol 8(2)
• p55 - Initial discovery 1972; first exploration 1973
• p55 - 1974 surveyed
• [T2] Mills L D J and Waltham A C, 1981 Geomorphology of the Matienzo Caves BCRA Transactions Vol 8(2)
• p77 - "Reversal of drainage" "Once a tributary to Uzueka"
• [T4] Corrin J S and Smith P, 1981 Matienzo Underground BCRA Transactions Vol 8(2)
• p99 - description; l=3200m
• [AA] Manchester University Speleological Society, 1982 Las Cavidades de Matienzo, Expediciones 1974 - 1979 Cuadernos de Espeleologia Vol. 9 - 10
• p355 - description
• p360 - Survey
• [N] Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p17 - Extensions. Suspected link with Uzueka.
• [DA] Cawthorne R, 1987 Matienzo '87 Plymouth Caving Group Newsletter and Journal, No. 101, Sept. '87
• p23, 25 - Explorationaccount 1987
• [O] Corrin J, 1987 Matienzo '86 Caves & Caving 35, Spring 1987
1986 resumé
• [BB] Corrin J and Knights S, 1988 Matienzo 1987 Caves & Caving 41, Autumn 1988
Extended by 500m and survey
• [BC] Davis J and Corrin J, 1989 Matienzo 1988 Caves & Caving 44, Summer 1989
Summary 220m surveyed. Photographs!
• [BO] Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
Account (wrong!) of '91 explorations.
• [BP] Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - on area map
• p347 - hydrological scheme
• [CL] Cawthorne B, 1992 Matienzo 1992 Newsletter No. 64. August 1992. W Pengelly Cave Studies Trust
• p26 - 4 Valleys L=40485m end of '92
• [DS] García José León, 1997 Cantabria Subterránea. Catálogo de las Grandes Cavidades
• pp412-416 - summary & exploration history to 1996
• [DV] Corrin Juan, 1997c El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p712 - Futrue hopes
• [DT] Fernández Ortega F and Valls Uriol, M C, 1998 Los Colores de la Oscuridad. Cantabria, Paraíso Subterráneo. Creática, Santander
• pp67-70 - Hydrology
• [EF] Corrin Juan, 2001a The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p15 - Mentioned in summary article
• [ES] Corrin Juan, 2003c Las Cuevas de Matienzo. Exploración y documentación. La Cueva de Cofresnedo en el Valle de Matienzo Ruiz Cobo Jesús and Smith Peter (directores)
• pp31-33 - Summary of the 4VS
• [EW] Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p11 - Mention re. 1804 + 1805
• [EZ] Corrin Juan, 2007 Expedition Report: Matienzo, Spain 2006 Speleology Issue 9, April 2007 BCRA
• pp16-17
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• pp31-32, 38 - Summary Spanish article. Photo.
• [FF] Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p18, 23 - Photo
• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• pp18-19
• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p14 - Summary. May eventually link with 3234 Llanío
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• pp475-480 - History; description; line survey 4VS (photos of 4VS)
• [FP] Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p10 - Summary
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p11 - Summary
• [HE] Thomson Tom, 2016 Life in Matienzo Descent 253 Dec/Jan 2016-17 Wild Places Publishing, Abergavenny
• [HU] Scaife Chris, 2022a Finding Big … Descent 285 April/May 2022 Wild Places Publishing, Abergavenny
• p17
• [KC] Carlisle James and Corrin Juan, 2024 Climbing the Charts in Matienzo Descent 298 June / July 2024 Stalactite Publishing, Kendal
• p22 - Mention of 40th World Cave length ranking
• [KL] Corrin Juan et al, 2025 Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161 (area map + photos)
• [ML] Scaife Chris, 2026a Matienzo 2026 Descent 312 October / November 2026
• p21 - Open canyon found.