Extra notes from card index
• Cueva de la Reñada
• Note on '91 extensions: All of the downstream main passage was previously known and surveyed. Side passage is new. 4 Valleys length has been adjusted.
• 4 Valleys length = 40439m
• end '94 TL=40596m
• Easter & Summer 2000: Extensions in Uzueka. TL=42853
• Easter extensions 2001: TL=42951
• Easter '07 All 07E passages in SchoolBoy Error Aven area total of Easter passages surveyed = 604.5m
(See Uzueka for 4 Valleys length)
TL=604.5 (Riaño) +221(Biggo) +44480 = 45306m
• Autumn 2007 December. 89Cents Tinto Extension 248.3m
Total 4VS = 49096 + 248.3=49344m
• Easter '08
Total Riaño survey = 154.7m Total Hoyuca (Gour Inlet) survey = 369.3m. Total Llueva (new chamber) = 280.6m
Total = 804.6m
So TL 4VS = 50149m (without Giant Panda adjustment)
• TL=51642m (Uzueka extended)
• Survey off entr. Passage
• Summer 09 4VS Revised TL = 51697m -> 52439m
• February 2010: 4VS length = 52788m
See also accounts for 20-2-10+ 21-2-10 + 22-2-10 after 30-10-11 in L11A
• 4VS ~54249m
• Also exploring passage to R of Acid Bath (account after 26/8/11)
• See also L11A after 30/10/11
• After Easter 2016 4VS TL = 58086m
• TL=59101 (recalc) + 121 + 60 (in Carc.) = 59282m
• End of summer 2019 4VS TL = 67126m
• Batch 24-07? = 114m 1/8/24?
• End of summer '25 TL=78718.2m
Orphan card index date references to logbook pages
• [13/08/1976] (?date?) Exploration and survey maze
• [04/08/1991] Survey / push inlet at base of 8m cascade in downstream 671m surveyed.
• [06/08/1991] Intention to explore downstream but Grov slips.
• [05/08/1991] Surface survey from entrance to risings.
• [08/04/1993] Pitch descended on R of main passage some way from Anastomoses climb. Not surveyed.
• [06/12/2007] 6th to the 11th December - log book account : 3 days in Riaño
• [05/08/2011] Some resurveying around Crystal Mines
• [15/07/2016]
• [31/08/2018] North end of Grey Rift Grey Rift Loop
• [01/04/2018] North end of Grey Rift Grey Rift Loop L=120.6m
• [12/08/2019] ??No note
• [05/04/2024] Batch 24-02, 03, 04 154m length
• [09/06/2024] Latest pdf from PF
• [06/08/2024] Batch 24-17 L=115.3m
4VS = 76166.49m
• [24/04/2025] (1) Pendant Chamber exploration; bolting a rift.
(2) Photos.
• [25/04/2025] At end of Easter 2025
TL of 4VS = 78544m
Dated logbook entries with card index notes
1974
August 7th - summer log -
1974s-33 -
exploration
August 14th - summer log -
1974s-66;
1974s-67 -
exploration and survey
August 15th - summer log -
1974s-70
1975
July 19th - summer log -
1975s-06
January 1st - summer log -
1975s-70
1976
August 15th - summer log -
1976s-56;
1976s-57
1984
July 31st - summer log -
1984s-13;
1984s-14;
1984s-15;
1984s-16 -
Poking about
1985
August 16th - summer log -
1985s-76;
1985s-77;
1985s-78 -
Extending in various places. Catprint passage and above.
August 17th - summer log -
1985s-78;
1985s-79;
1985s-80 -
Two teams pushing and surveying
August 20th - summer log -
1985s-87;
1985s-89;
1985s-90;
1985s-91 -
Pushing and surveying
1986
July 19th - summer log -
1986s-09;
1986s-11 -
(1) Connected to Uzueka via 2nd River Inlet
(2) 50m extra at the connectionpoint - up an inlet.
July 25th - summer log -
1986s-29;
1986s-30 -
Bat Chamber look. SKETCH
July 29th - summer log -
1986s-49 -
Bat Chamber surveyed. Still pitches to do and climb to scale into.
August 1st - summer log -
1986s-61 -
Pitches above done.
August 15th - summer log -
1986s-A4 -
toLDJM's passages. Down 15' + 20' ps detackle
August 18th - summer log -
1986s-A5 -
detackling
August 21st - summer log -
1986s-B0
1987
August 4th - summer log -
1987s-26;
1987s-29;
1987s-30;
1987s-75 -
Small amount surveyed near Catspaw Passage
August 6th - summer log -
1987s-37 -
Shaft dropping in or near Cats Whisker Bypass and beyond
August 7th - summer log -
1987s-39
August 10th - summer log -
1987s-48;
1987s-75 -
Surveying in Maze
August 15th - summer log -
1987s-63;
1987s-75 -
Surveying at end
1988
January 1st - summer log -
1988s-A6
August 8th - summer log -
1988s-57 -
Crystal Mines connected to main passage. Can reach end without a ladder. Surveyed small amount of new.
August 13th - summer log -
1988s-83 -
Photo trip to Cystal Mines and large chamber
1989
January 1st - summer log -
1989s-00
August 8th - summer log -
1989s-97;
1989s-98 -
Bits and pieces. Investigate Double Barrell Passage. Try to descend pitych near The Prison. Acid Gas Way.
1991
August 7th - summer log -
1991s-38 -
Pushing tube at top of cascade. 313m surveyed to slightly beyond downstream sump.
August 8th - summer log -
1991s-41;
1991s-41;
1991s-42;
1991s-42 -
Finishing cave found 7/8. Followed downstream beyond sump to T junction.
August 9th - summer log -
1991s-42;
1991s-43;
1991s-45 -
Trip to push at end.
August 14th - summer log -
1991s-71 -
Detackled and bits pushed
1992
July 21st - summer log -
1992s-01 -
Resurvey of entrance passage to downstream junction. Seems to go wrong near head of pitch and this bit needs resurveying.
August 2nd - summer log -
1992s-24 -
Push inlet at LHS downstream. Surveyed 46m
1993
July 25th - summer log -
1993s-05 -
Smoke test done at end of passage neading to surface. Smoke seen emerging from Dormouse Cave (935) and nearby boulder choke - all draughting.
August 9th - summer log -
1993s-55 -
Another look at Big Chamber
1994
April 8th - Easter log -
1993e-12;
1993e-13
1995
April 17th - Easter log -
1995e-15;
1995e-17 -
Bolting. Not surveyed.
1999
March 31st - Easter log -
1999e-11;
1999e-12 -
Trip to previously surveyed passages at large block. Also extensions in Carcavuezo / Biggo TL = 41687m
2000
April 21st - Easter log -
2000e-13
July 31st - summer log -
2000s-15
2001
August 5th - summer log -
2001s-24 -
Attempt to find Mad Axe Woman from inside Riaño. Joss sticks used.
2006
April 14th - Easter log -
2006e-38
April 16th - Easter log -
2006e-39 -
GPS and photo entrance
April 17th - Easter log -
2006e-44;
2006e-45 -
Re-opened. Inlet pushed
April 18th - Easter log -
2006e-46 -
Inlet pushed. 245.3m surveyed. Batch 06-01 - lots of leads to look at.
4 Valleys System is now 43437 + 245 = 43682m
July 30th - summer log -
2006s-08;
2006s-09 -
Checking passage details for survey
July 31st - summer log -
2006s-12 -
Easter 06 extensions 128m surveyed.
TL=128+43682 = 43810m
August 2nd - summer log -
2006s-20;
2006s-21 -
Resurveying
January 1st - autumn log -
2006a-10
December 10th - Xmas - New Year log -
2006c-04;
2006c-05 -
Climb aven at northern end. "Schoolboy Error" aven into 470m passage.
Surveyed roof passages found in August. 200m
December 11th - Xmas - New Year log -
2006c-06;
2006c-07 -
Surveyed 470m 13.5hr trip.
TL = 44480m
December 12th - autumn log -
2006a-09
December 14th - autumn log -
2006a-09
2007
March 31st - Easter log -
2007e-01;
2007e-02 -
122m surveyed Batch Riaño_070331
January 1st - Easter log -
2007e-03;
2007e-38
April 2nd - Easter log -
2007e-07;
2007e-07;
2007e-07;
2007e-07;
2007e-08;
2007e-08;
2007e-08;
2007e-08 -
35m surveyed Batch Riaño_070331
April 4th - Easter log -
2007e-41;
2007e-42 -
(No account in log) "Dave's Runaround" Batch 070404a Length =43.7.
Pitch down into Quake Rift. Batch 070404b Length = 70.2m
January 1st - summer log -
2007s-63
December 7th - autumn log -
2007a-14;
2007a-14;
2007a-15
December 8th - autumn log -
2007a-15
December 9th - autumn log -
2007a-15
December 21st - autumn log -
2007a-13
2008
January 1st - Easter log -
2008e-00
March 19th - Easter log -
2008e-30 -
Pushing at end of Pray Aven near surface at end of 89cents Tinto passage.
March 20th - Easter log -
2008e-10;
2008e-10;
2008e-31;
2008e-31;
2008w-01;
2008w-01 -
1st through trip Uzueka to Riaño
March 21st - Easter log -
2008e-32;
2008e-33 -
Acid Bath push. Mud / boulders
March 22nd - Easter log -
2008e-29;
2008e-34 -
Survey
April 1st - Easter log -
2008e-73
2009
April 8th - Easter log -
2009e-30;
2009e-31 -
Top of School Boy Error Aven 20m of passage?
April 12th - Easter log -
2009e-31;
2009e-31;
2009e-32;
2009e-32;
2009e-33;
2009e-33 -
(1) Into passage through boulders near entrance - about 100m? Egg shells and bones.
(2) Surveying and resurveying
2010
February 20th - autumn log -
2011a-09
February 21st - February log -
2010f-02;
2011a-09
February 22nd - autumn log -
2011a-09;
2011a-10
February 26th - February log -
2010f-04
August 11th - summer log -
2010s-47;
2011a-12 -
Looking for 'pitch 8m' at 2nd River Inlet into Uzueka. Details not correct?
2011
January 1st - Easter log -
2011e-37
June 28th - summer log -
2011s-02
July 1st - summer log -
2011s-02
August 4th - autumn log -
2011a-13;
2011s-31 -
In 11A Pendant Chamber survey and extension.
August 7th - autumn log -
2011a-15;
2011s-38 -
(Re) surveying Length of new cave unknown
August 9th - summer log -
2011s-34;
2011s-65 -
u/d pitch @ farend.368 Pitch blind
October 10th - autumn log -
2011a-02
2012
February 9th - Jan-Feb log -
2012jf-04
February 19th - Jan-Feb log -
2012jf-08;
2012jf-08
February 20th - Jan-Feb log -
2012jf-09;
2012jf-09;
2012jf-10
May 25th - Whit log -
2012w-01
August 7th - summer log -
2012s-73;
2013s-02 -
South of Pete's Way.DistoX file length 90.7m
2013
March 25th - Easter log -
2013e-08;
2013e-63;
2013e-64 -
Pitfall traps set
March 26th - Easter log -
2013e-08;
2013e-09;
2013e-64;
2013e-65 -
Part survey downstream. Probably entered and surveyed Ghost Rift. Some new passage found. 2 accounts.
March 28th - Easter log -
2013e-35;
2013e-67;
2013e-68;
2013e-69 -
Trip to link to Torno. Large rift but needs aids to progress (3 accounts)
April 3rd - Easter log -
2013e-21;
2013e-21 -
Pitfall trap removed. New survey …
April 10th - Easter log -
2013e-59
2015
August 1st - summer log -
2015s-17;
2015s-18 -
Resurvey Ghost Rift area? Freid Egg on a Stick L=102.7m
This is a resurvey. Stations : 215.n in batch 0105-new100220-150801.top
2017
August 16th - summer log -
2017s-46
2018
March 31st - Easter log -
2018e-15
April 3rd - Easter log -
2018e-27 -
Traps set?
2019
July 29th - summer log -
2019s-07;
2019s-08 -
Look for surface sub phone point for poss. connection to 3234.
July 30th - summer log -
2019s-09;
2019s-09;
2019s-10;
2019s-10;
2019s-11;
2019s-11;
2019s-12;
2019s-12 -
(1) Surface suphone team talked to Riaño team.
(2) Most digging in Torno Inlet through to 3234
(3) Torben through connection from 3234.
TL 4VS = 59367 + 7268 + 24 = 66659m …
July 31st - summer log -
2019s-13 -
Connection surveyed. Batch 0105-19-01 356 new Also new passages in area. Spiral Ramp and Snady Swims
August 4th - summer log -
2019s-15 -
V. strong draught @ entrance.
August 8th - summer log -
2019s-28;
2019s-29 -
First Llanío-Riaño through trip. En-route visited Ammonite Choke in Riaño. Pushed up well into Ammonite Choke with more to do. 48m surveyed in batch 0105-19-02
4VS length = 66659+48 = 66707m
2021
October 20th - autumn log -
2021a-09
2024
January 31st - Jan-Feb log -
2024jf-05 -
Checked for inclusion in 4VS scenarios
April 3rd - Easter log -
2024e-35 -
Explore and survey up inlet. Still going. Batch 24-01 154m length.
April 7th - Easter log -
2024e-39;
2024e-41;
2024e-42 -
(1) Looking at cave formation.
(2) Batch 24-05 99.5m
Total 0105 extension = 408m
4VS = 74611m
July 18th - summer log -
2024s-13 -
Various solo work. See log.
July 19th - summer log -
2024s-13 -
Various solo work. See log.
July 21st - summer log -
2024s-13 -
Various solo work. See log.
July 27th - summer log -
2024s-14;
2024s-15 -
(1) Batch 24-06 off La Playa. Splits - slight draught.Notes on survey. L=72.3m
(2) At end of cave. Sketch.
July 30th - summer log -
2024s-16;
2024s-17;
2024s-18 -
Batches 8 and 9. Maze passages and large chamber
July 31st - summer log -
2024s-18;
2024s-19;
2024s-20 -
Batches 10, 11, 12. TL 2024 summer so far is 510m
4VS = 75370.8m
August 1st - summer log -
2024s-23;
2024s-24;
2024s-25;
2024s-26;
2024s-27 -
Batches 13 + 14 L = 271 + 223
August 3rd - summer log -
2024s-31;
2024s-31 -
Visit by James + 7yr-old Juan
August 5th - summer log -
2024s-33;
2024s-34
August 13th - summer log -
2024s-68;
2024s-69;
2024s-70;
2024s-71 -
New series of chambers reached by climbing. Photos and video in log book.
Survey batch 24-18 L=70.2
76236.7m
August 14th - summer log -
2024s-71 -
Trip to pitch Jaun Carlisle
August 15th - summer log -
2024s-71
August 18th - summer log -
2024s-76 -
Media download.
November 3rd - autumn log -
2024a-32;
2024a-33 -
Anemometer used in entrance 2.44m/s 15.9°C
2025
February 20th - Xmas- New Year log -
2024c-32 -
Gypsum Needles photo from Lank via PS. (Added to stals page).
April 8th - Easter log -
2025e-03 -
Re-investigate passage heading towards Dormouse Cave.
Inlet surveyed (short)
0105-25-01 (entered?) 21m
April 14th - Easter log -
2025e-12;
2025e-13 -
Batch 25-02 32m
Up bolt climb
April 15th - Easter log -
2025e-18;
2025e-19 -
Natch 25-03 66m
April 18th - Easter log -
2025e-29;
2025e-43;
2025e-44 -
Batch 25-04 25m
Amendments on sketch later in log book.
April 21st - Easter log -
2025e-48
April 23rd - Easter log -
2025e-58
July 29th - summer log -
2025s-16 -
Look around Mouse Print Passage.
One dig a possibility with hammer and chisel.
Re-surveyed - batch 25-06
July 31st - summer log -
2025s-21 -
Up Torno Inlet.
August 1st - summer log -
2025s-21 -
Mouse Print Passage - a few metres of progress.
August 2nd - summer log -
2025s-23 -
MPP - through into extension (Wise Choice) with 21.5m aven. LH Aven and a RH Aven.
Surveyed. Possible high level. Batch 25-07 38.8m
August 8th - summer log -
2025s-34;
2025s-35 -
Torno Inlet.
August 10th - summer log -
2025s-37 -
(1) Mouse Print Passage aven bolting.
5m short of a possible ledge.
(2) Small dig; 4m passage to stall grill.
December 9th - Xmas - New Year log -
2025c-02 -
Updated svx file from PF.
2026
April 3rd - Easter log -
2026e-26;
2026e-27 -
Shrimp sampling in various passages. Photos
April 4th - Easter log -
2026e-15 -
Mouseprint Passage. Couldn't reach avens because of too much water.
August 11th - summer log -
2026s-47 -
Bolt traverse high off Pendant Chamber heading south into new area with leads.
August 14th - summer log -
2026s-62;
2026s-63;
2026s-64 -
(1) Pitch at end of traverse. Very tight.
(2) Right at end of traverse: pitch to 125m of open stomping canyon. P down and continues.
August 16th - summer log -
2026s-64;
2026s-65 -
Pitch down at end of traverse into Sand Canyon. Pitch down. Tight rifty passage not surveyed: issues with the SAP6. Diagram in log book.
4VS at end of summer 2026 TL=80249m
Published documents: print and digital
• [B]
anon., 1974a Matienzo, North Spain - The 1974 British Expedition Report • p2 - account
• pp19-22 - account and survey?
• [BK]
Cope J, 1974 Northern Spain, Summer Holidays 1973 J. Manchester University Speleological Society No. 7
Account of first exploration
• [E1]
Fernández Gutiérrez J C, 1975 Noticias y Reflexiones sobre las actividades de la S.E.U.M. en el área de la depresión de Matienzo . . . 1969 - 1974 Cuadernos de Espeleología Vol. 8
• p147
• [D]
Cope J et al, 1976 The 1976 Expedition to Matienzo, Northern Spain J. Manchester University Speleological Society, No. 8
• p18
• [T1]
Mills L D J, 1981 Caves & Caving in Matienzo BCRA Transactions Vol 8(2)
• p55 - Initial discovery 1972; first exploration 1973
• p55 - 1974 surveyed
• [N]
Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p17 - Extensions. Suspected link with Uzueka.
• [DA]
Cawthorne R, 1987 Matienzo '87 Plymouth Caving Group Newsletter and Journal, No. 101, Sept. '87
• p23, 25 - Explorationaccount 1987
• [O]
Corrin J, 1987 Matienzo '86 Caves & Caving 35, Spring 1987
1986 resumé
• [BO]
Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
Account (wrong!) of '91 explorations.
• [BP]
Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - on area map
• p347 - hydrological scheme
• [CL]
Cawthorne B, 1992 Matienzo 1992 Newsletter No. 64. August 1992. W Pengelly Cave Studies Trust
• p26 - 4 Valleys L=40485m end of '92
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • pp412-416 - summary & exploration history to 1996
• [DV] Corrin Juan, 1997c
El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p712 - Futrue hopes
• [DT] Fernández Ortega F and Valls Uriol, M C, 1998
Los Colores de la Oscuridad. Cantabria, Paraíso Subterráneo. Creática, Santander • pp67-70 - Hydrology
• [EF] Corrin Juan, 2001a
The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p15 - Mentioned in summary article
• [ES]
Corrin Juan, 2003c Las Cuevas de Matienzo. Exploración y documentación. La Cueva de Cofresnedo en el Valle de Matienzo Ruiz Cobo Jesús and Smith Peter (directores)
• pp31-33 - Summary of the 4VS
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p11 - Mention re. 1804 + 1805
• [EZ]
Corrin Juan, 2007 Expedition Report: Matienzo, Spain 2006 Speleology Issue 9, April 2007 BCRA
• pp16-17
• [FD]
Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• pp31-32, 38 - Summary Spanish article. Photo.
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p18, 23 - Photo
• [FM]
Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• pp18-19
• [FN]
Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p14 - Summary. May eventually link with 3234 Llanío
• [FP]
Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p10 - Summary
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p11 - Summary
• [HE] Thomson Tom, 2016
Life in Matienzo Descent 253 Dec/Jan 2016-17 Wild Places Publishing, Abergavenny
• [HU] Scaife Chris, 2022a
Finding Big … Descent 285 April/May 2022 Wild Places Publishing, Abergavenny
• p17
• [KC] Carlisle James and Corrin Juan, 2024
Climbing the Charts in Matienzo Descent 298 June / July 2024 Stalactite Publishing, Kendal
• p22 - Mention of 40th World Cave length ranking
• [KL] Corrin Juan et al, 2025
Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161
(area map + photos)
• [ML] Scaife Chris, 2026a
Matienzo 2026 Descent 312 October / November 2026
• p21 - Open canyon found.