MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0071 Mostajo, Torca del
Cubija - 30T 0450243 4796764 Altitude: 304m - Depth: 117m
Website description for site 0071   |   Site in context, area map

Extra notes from card index
• After Morenuca extensions TL=19317m

Orphan card index date references to logbook pages
• [01/08/1984] in lower reaches
• [27/07/1987] carry on 27/7/87; surveying
• [10/08/1992] core sampling
• [13/08/1992] Pitch dropped below Golden Void
• [09/08/1995] tourist trip; passage off top of Golden Void? End of summer 95 L=15621m
• [28/07/1997] Entered through 774; 53.2m surveyed near stn V20?; tL=17147m
• [04/08/1997] Connection to GT series in Regaton. 11m surveyed. TL=17808m
• [06/08/1997] Two links to Regaton down pitches. 55.4 + 59m. TL=17922m
• [17/08/2008] tourist trip
• [14/09/2014] Complete survey and description of Tenebrous Passage
• [15/04/2022] Tourist trip and photos taken in Wonderland
• [30/03/2024] New p hangers seen

Dated logbook entries with card index notes

1978

July 13th - summer log - 1978s-02; 1978s-03 - found and entrance explored
July 15th - summer log - 1978s-06 - finished at 300m

1982

August 17th - summer log - 1982s-41

1983

August 9th - summer log - 1983s-27 - Scale at end into new passage. Dug. Stop at climb.
August 10th - summer log - 1983s-33; 1983s-34 - Dig blow hole at top of climb
August 12th - summer log - 1983s-39 - Dig blow hole at top of climb; Photos taken
August 14th - summer log - 1983s-43 - Dig blow hole at top of climb
August 17th - summer log - 1983s-50 - Dig blow hole at top of climb
August 18th - summer log - 1983s-51 - Dig blow hole at top of climb; 50ft down the side entered.
August 19th - summer log - 1983s-53 - Dig blow hole at top of climb; Photos taken and extension entered. About 300m to large pit. Surveyed.
August 20th - summer log - 1983s-60 - Beyond Pit surveyed and photographed. Extra 370m. Detackled.

1984

July 29th - summer log - 1984s-03 - down Golden Void?
July 30th - summer log - 1984s-08 - pushing?
July 31st - summer log - 1984s-13 - down Golden Void
January 1st - summer log - 1984s-22; 1984s-23; 1984s-56; 1984s-B8
August 2nd - summer log - 1984s-27; 1984s-28; 1984s-29 - lots more found; surveying and passage descriptions
August 3rd - summer log - 1984s-30; 1984s-31
August 4th - summer log - 1984s-35; 1984s-36 - Extending and surveying. Hedgehog Passage.
August 9th - summer log - 1984s-66; 1984s-67; 1984s-68; 1984s-69; 1984s-70; 1984s-73 - 1: surveying (sketches) 2: pushing Hedgehog Crawl 3: Photos taken
August 10th - summer log - 1984s-76; 1984s-77 - Surveying Hedgehog Crawl - sketch
August 11th - summer log - 1984s-85 - surveying in Cayenne Series
August 13th - summer log - 1984s-86; 1984s-86; 1984s-86; 1984s-87; 1984s-87; 1984s-87; 1984s-89; 1984s-89; 1984s-89; 1984s-94; 1984s-94; 1984s-94; 1984s-95; 1984s-95; 1984s-95 - bits and pieces; pitch bolted; more passage
August 14th - summer log - 1984s-98 - Went down shaft - not bottomed. Enter new stuff near Dwatf Chamber.
August 15th - summer log - 1984s-A2 - Poke about on top level
August 16th - summer log - 1984s-A3 - Survey Helictite Passage
August 17th - summer log - 1984s-A6 - shaft detackled; explored into active section.
August 19th - summer log - 1984s-A9; 1984s-A9; 1984s-B0; 1984s-B0; 1984s-B1; 1984s-B1 - 1: Quiberon Passage - Going Home Series. Confusing area. ...
August 20th - summer log - 1984s-B4 - derig
August 21st - summer log - 1984s-B5 - tourist trip (Portienzo)
August 22nd - summer log - 1984s-B6; 1984s-B7 - Portienzo descend big pitch to end.

1985

April 2nd - Easter log - 1985e-02 - Rig cave. Descend 60ft pitch near the base of the Golden Void.
April 4th - Easter log - 1985e-03 - Bits found near Quiberon?
April 5th - Easter log - 1985e-03; 1985e-04 - Going Home Series to descend pitches
April 7th - Easter log - 1985e-09 - photography to Golden Void
April 8th - Easter log - 1985e-10 - pushed near Going Home Series
April 10th - Easter log - 1985e-14 - Going Home pushed; "no obvious leads going". Derigged.
July 17th - summer log - 1985s-01 - searching for bypass to Golden Void
July 20th - summer log - 1985s-03 - Tackling and poking near far end of high level
July 25th - summer log - 1985s-09 - photography end chamber; First trip down second pit; bolt climb started.
July 27th - summer log - 1985s-10 - video; Second trip down second pit into lower levels. Survey done.
July 29th - summer log - 1985s-15; 1985s-16 - photography (Frank); Wonderland and Dwarf Chamber. Also new chamber and passage not on survey.
August 2nd - summer log - 1985s-24 - Pit pitches lead to "about 500m" of passage with static sump and railway tunnel not surveyed.
August 3rd - summer log - 1985s-27; 1985s-28; 1985s-28 - Two survey teams into extension and surveyed. 80m climb up unsurveyed.
August 6th - summer log - 1985s-37; 1985s-37; 1985s-37; 1985s-37 - Neil and Mark to Golden Void Bypass; looking at choked parts. Surveyed about 30m.
August 8th - summer log - 1985s-43 - Slug, Nigel, Martin (Disley) to Hedgehog. Martin out due to pulled shoulder. Others poke at high level end. Portsmouth off station 8 down into small extension.
August 9th - summer log - 1985s-48; 1985s-49 - Survey passage in wall; St 10 near end of "Gypsum Passage" - top level? - surveyed.
August 11th - summer log - 1985s-56; 1985s-57 - Sketch of Hedgehog Crawl pitch. Also GV bypass note opposite.
August 13th - summer log - 1985s-60; 1985s-61 - Hedgehog Crawl pitch descent; Spiney Norman sketch.
August 14th - summer log - 1985s-69 - Photography Dwarf Chamber
August 24th - summer log - 1985s-92; 1985s-93 - Down p19 to look at dotted bits on survey. Detackled.

1986

July 23rd - summer log - 1986s-25 - tackling up and trip to end of high level
July 24th - summer log - 1986s-25; 1986s-28 - Bolt up to passage in roof at end of high level; need scaling poles. Hole in floor leads to about 200ft extension; needs surveying.
July 25th - summer log - 1986s-32 - More digging at the hole in the floor.
July 26th - summer log - 1986s-38 - Into extension in floor
July 27th - summer log - 1986s-40 - Survey extension; about 250m. Pitch still needs descending fully.
July 30th - summer log - 1986s-52 - descended pitch
August 1st - summer log - 1986s-58 - aborted surveying trip
August 8th - summer log - 1986s-86 - down 200ft shaft from high level. Surveyed.
August 9th - summer log - 1986s-88 - pitch descended from 8/8/86. Detackled. About 623m surveyed.

1987

July 25th - summer log - 1987s-01 - Drop shaft at end of Hedgehog Crawl
January 1st - summer log - 1987s-53
August 10th - summer log - 1987s-48; 1987s-75 - small extension in middle level; Grovel.
August 11th - summer log - 1987s-52 - Pitch and later (Alligator Pit). Surveyed. Diagram; tL=6050m; pL=5296m
August 13th - summer log - 1987s-75

1988

July 25th - summer log - 1988s-05 - new passage over traverse from p19 p20 area
July 27th - summer log - 1988s-06; 1988s-07
July 28th - summer log - 1988s-10; 1988s-11 - continue with new passage
July 29th - summer log - 1988s-12; 1988s-13 - continue with new passage down to streamway
January 1st - summer log - 1988s-A6
August 14th - summer log - 1988s-84; 1988s-86 - re-rigged
August 22nd - summer log - 1988s-A5 - photography - Juan - detackled

1990

August 5th - summer log - 1990s-07

1991

July 16th - summer log - 1991s-09 - tackling up
July 17th - summer log - 1991s-09 - exploration of passage found in 1988; nothing new.
July 23rd - summer log - 1991s-09 - photography in entrance series
July 27th - summer log - 1991s-13 - resurveyed from Golden Void; left and right to check discrepancies on old survey data. Hole noted 10m along SE and 5m down.
July 28th - summer log - 1991s-12 - resurveyed from Golden Void; left and right to check discrepancies on old survey data. Hole noted 10m along SE and 5m dow
August 4th - summer log - 1991s-30 - Pushing in Eastern Series down pitch. 64m surveyed; tL=5794m; tL=6582m
August 8th - summer log - 1991s-39 - 1: photography 2: Pete's dig near Wonderland - no go. 3: resurvey from p19. TL=6582m

1992

August 8th - summer log - 1992s-32 - 1: Couldn't find Headgehog Crawl. 2: sediment collecting. 3: Lower level look around.
August 14th - summer log - 1992s-38 - surveyed but not on because cannot be tied back.

1993

July 22nd - summer log - 1993s-02 - traverse line replaced
August 14th - summer log - 1993s-68

1994

March 28th - Easter log - 1994e-02 - Looked at western end near the entrance. Small chamber entered. Looked at possible link with Torcón de Cubija
April 1st - Easter log - 1994e-14 - Looking for Torcón connection between the long straw and the pit. Various holes. One still going. Diagram.
April 3rd - Easter log - 1994e-28
April 4th - Easter log - 1994e-25; 1994e-26; 1994e-27 - 1: Pushing crawl to right into chambers and more crawling. Wait 'til summer for draught. 2: Into hole on right hand wall which enters mainly previously descended stuff.
April 5th - Easter log - 1994e-32
August 8th - summer log - 1994s-37 - Down Golden Void to prospect
August 9th - summer log - 1994s-41 - Finding Headgehog Crawl
August 10th - summer log - 1994s-41 - Joined to Cubio-Regaton. Sistema de Vega Norte. First Mostajo - Regaton - Cubio traverse. TL=14211m
August 11th - summer log - 1994s-43 - Starlight Express explored and surveyed at end of Headgehog Crawl. 410m surveyed. TL=6992m; System length = 14621m
August 14th - summer log - 1994s-47 - detackled

1995

May 26th - Whit log - 1995w-01 - dig extension surveyed; 20.6m new; tL=14642m
May 30th - Whit log - 1995w-05 - tourist trip
May 31st - Whit log - 1995w-05 - Replaced second pit rope and did two bolt climbs beyond. One on left hand wall near end VN50952 97429; other on corner at above stn87: VN50869 97384
July 30th - summer log - 1995s-20; 1995s-22 - Headgehog Crawl extended into Easy Rider Passage (2 accounts); 285m surveyed. Length =15284m then 15335m and 15521m after Regaton extensions.
August 5th - summer log - 1995s-57 - photography
August 10th - summer log - 1995s-74; 1995s-75

1996

April 7th - Easter log - 1996e-15; 1996e-16; 1996e-17
August 6th - summer log - 1996s-18 - tourist trip
August 17th - summer log - 1996s-39 - Confirm to farmer that cow has fallen down shaft. End of summer 1996 L=17023m

1997

July 25th - summer log - 1997s-02 - Entered through 774; 71m surveyed around stn V20; tL=17094m
July 29th - summer log - 1997s-15 - through trip with Morenuca
July 30th - summer log - 1997s-15; 1997s-15 - 97m surveyed around stn V20? TL=17244m
August 3rd - summer log - 1997s-29 - 1: Extended over Magic Carpet end pitch to 15m wide shaft TL=17320+259 = 17579m. 2: Down Stair Rod to Heaven pitch in Morenuca from '95. TL=17579+41=17620m. 3: Black and Blue Series 177m; tL=17797m

1999

April 4th - Easter log - 1999e-15 - Tourist trip down G.V. Hole at top is parallel shaft. Short ladder up now has a dodgy handline.
April 8th - Easter log - 1999e-20; 1999e-21
July 31st - summer log - 1999s-13 - Supposed passage opposite eyehole not seen
August 4th - summer log - 1999s-24; 1999s-25 - Eastern Series re-explored. Beyond big pitch noy surveyed in the past. Needs doing.
August 8th - summer log - 1999s-24 - Various bits in Eastern Series. Not surveyed. Diagrams of the area.

2000

August 3rd - summer log - 2000s-21

2002

January 1st - Xmas - New Year log - 2001c-08
March 23rd - Easter log - 2002e-01 - tourist trip
March 30th - Easter log - 2002e-12 - tourist trip
August 12th - summer log - 2002s-26

2004

April 19th - Easter log - 2004e-45 - email: New series on the left on the way to Dwarf Chamber?
October 28th - autumn log - 2004a-03; 2004a-04
December 24th - Xmas - New Year log - 2004c-04

2008

March 23rd - Easter log - 2008e-22 - photography trip along top level
August 16th - summer log - 2008s-78

2009

April 19th - Easter log - 2009e-59 - tourist trip

2012

February 9th - Jan-Feb log - 2012jf-04
July 25th - summer log - 2012s-04; 2012s-05; 2012s-06 - End of high level. Entered hole in floor before the end. Probably into known cave then "Stompy Passage" at end of crawl (No survey 2 accounts
July 29th - summer log - 2012s-15 - Resurveyed old passage then 53m new to open passage. TL Cubija System = 52 + 20446 = 20498 Batch 0071-12-01
August 1st - summer log - 2012s-25; 2012s-26 - MUSC Series. Continue exploration in Southern Series at end. 282m surveyed. TL = 282 + 20498=20780

2013

July 28th - summer log - 2013s-14 - Resin bolts. Photography
July 29th - summer log - 2013s-17; 2013s-18 - Look to the W off the entrance pitch. Nothing obvious. Batch 13-01 L=71m TL=20780+71 = 210851m
July 30th - summer log - 2013s-19; 2013s-19; 2013s-23; 2013s-23 - 4 people to tight section. Too tight for 3. Needs enlarging. …
August 1st - summer log - 2013s-29 - P bolts installed on traverse by Adam Sharples.
August 3rd - summer log - 2013s-41 - Sandy crawls dug out and squeeze into extensions enlarged. Now "rescue size".
August 4th - summer log - 2013s-43 - Solo survey trip. Batch 13-03 168m TL = 20891 +168 = 21059m
August 6th - summer log - 2013s-50 - New finds in MUSC Series. Needs surveying.
August 8th - summer log - 2013s-65 - Surveying + exploration. Batches 13-04,05,06,07 Total new length = 627m TL=21059+627 = 21686m

2014

August 2nd - summer log - 2014s-25 - Entrance rigged. Paths layed out by Spanish cavers. Various drops pushed. (2 accounts)
August 4th - summer log - 2014s-32; 2014s-33 - Extensions off 2013 extensions. 14m found 14-01 + 14-02 Cubija Sys. TL = 21686+142 = 21828m
August 7th - summer log - 2014s-42 - Various poking about
August 11th - summer log - 2014s-51; 2014s-52 - (1) Blocked passage left of breakthrough poinjt in 2012. Passage full of mud. (2) Pushed lead off left wall after the 2 traverses. Drops down 2 x p15m. Passage @ base continues.
August 12th - summer log - 2014s-54; 2014s-55; 2014s-55 - (1) Rope too short to explore down short pitch. (2) Surveyed 220m in Tenebrous Passage. Streamway entered 150m to blockage
August 14th - summer log - 2014s-60; 2014s-61
August 15th - summer log - 2014s-58 - Detackle extension. Possible connection ends in muddy chamber. Total length surveyed over summer '14 = 667m TL=21686+667 = 22353m Batches 14-03 -> 14-06 are Tenebrous Passage (?)

2015

July 28th - summer log - 2015s-07 - .Tackle up
July 30th - summer log - 2015s-15 - Dig poss route off top passage.
August 1st - summer log - 2015s-18 - Continue digging but drill not working. Sound connection.

2016

August 4th - summer log - 2016s-30 - tourist trip top level

2017

July 29th - summer log - 2017s-12 - Tackled up for trip tomorrow. Note: Entrance pitch requires a 45m rope to tackle up a p22.
July 30th - summer log - 2017s-15 - Trip to Wonderland end. The draughtless choke would be a big job. Photography.
August 3rd - summer log - 2017s-24 - Trip on top level.
August 8th - summer log - 2017s-34; 2017s-35 - Sheppard's Bush extension. Batch 17-01 L=55m TL=55 + 22353 = 22408m Other small extension sketched in log book

2018

March 30th - Easter log - 2018e-09; 2018e-10 - Ent. Pitch rigged.
March 31st - Easter log - 2018e-10; 2018e-11 - (1) Photos taken before crawl. (2) Attempt to fond connection to MUSC Series.
April 2nd - Easter log - 2018e-20; 2018e-21; 2018e-22; 2018e-23 - Confusion with stns labelled "p" shown on map as pitches. Survey amendments in log book. Survey annoatations in log book
April 4th - Easter log - 2018e-30; 2018e-31; 2018e-32 - (1) Entrance rope found scorched due to farmer's fire. (2) Replacved rope but found passages smoke-filled. Down Golden Void then trip anorted.
August 18th - summer log - 2018s-56 - Resurvey batch 18-03 New surveyed loop 31m TL=22408+31 = 22439m
August 24th - summer log - 2018s-61; 2018s-62 - 7:55am in cave! Resurvey batch 18-04 (passage detail) TL is still 22439m

2019

April 18th - Easter log - 2019e-30; 2019e-31 - Exploring far eastern end of G.V.Series. No survey. Some extension area to push.
April 21st - Easter log - 2019e-41; 2019e-41 - Descend pitch near PP0 (or p10?) stn A27: p dropped and closed in. …

2021

July 31st - summer log - 2021s-11 - 105.56m surveyed 68m new (21-01) Connection not (re) found into Footprint Passage. TL = 22596+68 = 22664m
August 9th - summer log - 2021s-30; 2021s-31; 2021s-32; 2021s-33; 2021s-33-1 - MUSC Series.Looking at possibilities mentioned by A. Sharples (2012) Misc. explorations + one open lead. Annotated survey. 29m (21-02)
August 11th - summer log - 2021s-40; 2021s-41; 2021s-42 - Survey of new passage which joined back to main route. Batch 0071-21-03 - Time Travelling Donkey New = 195 + 22664 = 22859m + 21-02 @ 29m = 22888m

2022

April 16th - Easter log - 2022e-32
July 31st - summer log - 2022s-13; 2022s-14; 2022s-15 - Last bit of MUSC Series to explore. Batch 0071-22-01 L=61m TL = 22888 + 61 = 22949m
December 5th - Xmas - New Year log - 2022c-03; 2022c-04 - Some new anchors and ropes installed by Spanish team. Diagrams into description.

2023

April 13th - Easter log - 2023e-50 - Photography trip

2024

August 4th - summer log - 2024s-31; 2024s-31 - Drone orbit

2025

February 10th - Xmas- New Year log - 2024c-31
July 28th - summer log - 2025s-13; 2025s-14; 2025s-15 - Trip to top level end. Possible bolt route seen with possibility of intersecting a Rascavieja level. Photos.
July 31st - summer log - 2025s-18; 2025s-19 - (1) Aven partly bolted. Photos. (2) Trip down G. Void. Top needs rebolting.
August 11th - summer log - 2025s-40 - Aven climb completed to a boulder choke.
August 14th - summer log - 2025s-47

2026

August 2nd - summer log - 2026s-28
August 7th - summer log - 2026s-28 - Tourist / photo trip
August 12th - summer log - 2026s-48 - Freya Bearn arm broken by slipping on the traverse near the entrance. Hospital visit.
August 15th - summer log - 2026s-54; 2026s-55 - Top of Golden Void had "only spits and naturals to be rigged off".
August 17th - summer log - 2026s-66 - Derig. Path used from bend below the #0813 parking spot.

Published documents: print and digital

• [F] Corrin J et al, 1978 Matienzo 1978 J. Manchester University Speleological Society No 9
• p5, 9, 12 - account and survey
• [P2] Smith P, 1981b Grupo de Espeleologia de Matienzo J. Manchester University Speleological Society No. 10
• p12 - Survey
• [T1] Mills L D J, 1981 Caves & Caving in Matienzo BCRA Transactions Vol 8(2)
• p56 - first discovered 1978
• [T4] Corrin J S and Smith P, 1981 Matienzo Underground BCRA Transactions Vol 8(2)
• p96 - description; L=325m; d=59m
• [K] Corrin J, 1983b Matienzo '83 Caves & Caving 22, Nov. 1983
• pp16-18 - account of 1983 explorations; cave on area map; 5 photos.
• [M] Barrington P and Hanson D, 1984 Matienzo '84 Caves & Caving 26, Nov. 1984
• pp18-19 - account 1984 explorations; 3 photos; description; survey on area map. Now has 6km of passage.
• [CZ] Cawthorne Bob, 1985b Matienzo 1984 Plymouth Caving Group Newsletter and Journal, No. 94, Feb. '85
• p4 - mention of 1984 explorations
• [N] Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p15 - After 1985. Now 4.7km; 117m deep to sump and boulder pile. On area survey.
• [O] Corrin J, 1987 Matienzo '86 Caves & Caving 35, Spring 1987
• p18 - summary of 1986 activities. L=5908m ; pL=5171m; d=117m
• [BC] Davis J and Corrin J, 1989 Matienzo 1988 Caves & Caving 44, Summer 1989
summary of 1988; photos; pitch to be descended; tL=6518; pL=5746m
• [BO] Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
mention of small extension. On area survey.
• [BP] Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - survey on area map
• p348• p350, 353 - survey and elevation; also on hillside section
• [BR] Corrin J and Quin A, 1992 Matienzo '92 Caves & Caving 58, Winter '92
survey on area map and section with Regaton
• [CL] Cawthorne B, 1992 Matienzo 1992 Newsletter No. 64. August 1992. W Pengelly Cave Studies Trust
• p27
• [BU] Quin A, 1993b Morphological links between distinct cave systems? An investigation of the magnetic properties of sediments
• p28, 33, 34 - sediment sampling thesis; survey with Regaton.
• [BY] Corrin J, 1993 Expedicion Britanica a Matienzo (Año 1992) BCE Cantabria Subterránea, No. 9, Nov. 1993.
survey on area map with Regaton
• [BZ] Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
• p27 - survey on area map
• [CS] Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
account; photo of Italian Pitch and Dwarf Chamber; survey on area map
• [CU] Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p67 - survey on area map
• [CY] Quin Andrew, 1995 Morphological links between distinct cave systems, as revealed by the magnetic properties of cave sediments Studies in Speleology, Vol X, December 1995 William Pengelly Cave Studies Trust Ltd
• pp9-19 - Survey; magnetic properties of cave sediments
• [FJ] Corrin Juan, 1996 Matienzo '95 Boletín Cántabro de Espeleología no. 12
• p75 - Mention
• [DM] Corrin Juan, 1997a Matienzo Caves & Caving, Issue 75, Spring '97
• p17,18 - summary 1996; connection with Morenuca 774
• [DR] Corrin Juan, 1997b Expedición Británica a Matienzo 1996 Boletín Cántabro de Espeleogía no 13. Santander.
• p82 - summary 1996; connection with Morenuca 774
• [DS] García José León, 1997 Cantabria Subterránea. Catálogo de las Grandes Cavidades
• pp421-423 - summary & exploration history; stall photo; line survey and section through hillside.
• [DV] Corrin Juan, 1997c El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• pp712-713 - future hopes
• [DN] Corrin Juan, 1998 Matienzo 1997 Caves & Caving, Issue 79, Spring '98
• p26 - summary 1997; photos by Ramon?
• [DT] Fernández Ortega F and Valls Uriol, M C, 1998 Los Colores de la Oscuridad. Cantabria, Paraíso Subterráneo. Creática, Santander
• p53 - sediments in Mostajo
• p97 - stal photo
• [EF] Corrin Juan, 2001a The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p13 - Mentioned in summary artilce
• [ES] Corrin Juan, 2003c Las Cuevas de Matienzo. Exploración y documentación. La Cueva de Cofresnedo en el Valle de Matienzo Ruiz Cobo Jesús and Smith Peter (directores)
• p31 - Similar levels to SVS Summary description of NVS
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p32 - Mention in Spanish summary article
• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p15 - Summary (Morenuca extensions)
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• pp488-490 - History; description as part of the Cubija System. Line survey and section. Photos p488, 490
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p10 - Summary p12 L = 20780
• [HU] Scaife Chris, 2022a Finding Big … Descent 285 April/May 2022 Wild Places Publishing, Abergavenny
• p17