Extra notes from card index
• details of surface survey
Orphan card index date references to logbook pages
• [01/06/2001] Photography top entrance and GPS 5085(5) 9551(9) alt.262 Alt. 285 X
• [02/08/2001] Top entrance surveyed. No new passage. L=497m d=54m
• [10/05/2014] Photo taken of top entrance.
Dated logbook entries with card index notes
1978
July 15th - summer log -
1978s-05;
1978s-06 -
exploration
August 1st - summer log -
1978s-17
1979
January 1st - summer log -
1979s-48
1983
April 10th - Easter log -
1983e-14
1991
August 12th - summer log -
1991s-57 -
extended into chamber with footprints
1994
April 3rd - Easter log -
1994e-21;
1994e-22 -
extended; survey. L=474m; d=54m
1997
August 10th - summer log -
1997s-41
1998
July 31st - summer log -
1998s-05;
1998s-07
August 2nd - summer log -
1998s-08
August 22nd - summer log -
1998s-38
December 30th - Xmas - New Year log -
1998c-03;
1998c-03 -
surface survey to tie in S Vega entrances. Wall junction to 42 to 37 to 457 to 1332 to 1359. Details in file; GR of 42 altered; bottom entrance visited
2000
April 24th - Easter log -
2000e-19;
2000e-21 -
Entrance (bottom) just above track
July 20th - summer log -
2000s-01;
2000s-02 -
GPS repositioned bottom entrance (@5090(0)9560(7)
A lt.236)X. See later 2008.
July 29th - summer log -
2000s-11
August 4th - summer log -
2000s-19
2001
April 14th - Easter log -
2001e-28 -
Resurvey done
April 17th - Easter log -
2001e-42 -
(1) Down Candy's Pot.Streamway enteres. Too small outlet.
(2) Photos taken.
(3) Survey last leg to helictites. Add 23.2
L=497m
January 1st - Whit log -
2001w-02;
2001w-04
July 29th - summer log -
2001s-09
August 15th - summer log -
2001s-40;
2001s-41
2002
March 31st - Easter log -
2002e-14 -
Hilti cap and dig in top entrance area to try to connect with Hidden Hole (458)
April 3rd - Easter log -
2002e-28 -
Dug near pitches base for Hidden Hole connection.
July 30th - summer log -
2002s-07 -
(1) Dug at "Hideen Hole connection". Bad air.
(2) Blow Hole - no draught - so could be water heard
(3) Dug in wall of second chamber from bottom entrance. 2m progress made
August 3rd - summer log -
2002s-10;
2002s-11 -
14.5m surveyed at Hidden Hole dig L=512m
August 7th - summer log -
2002s-14 -
Dug at another site, parallel to old dig.
2003
April 14th - Easter log -
2003e-02
July 29th - summer log -
2003s-10 -
Dug towards Hidden Hole
August 8th - summer log -
2003s-20 -
More digging
2004
January 1st - Whit log -
2004w-05
2008
August 9th - summer log -
2008s-67 -
Dug through into W part of the top entrance rift.Batch 2008-1 New=64.3mX
TL=576m X New GPS of entrances
top @ 0450850 4795523 Altitude 282m
Bottom @ 0450902 4795603 Altitude 242m
August 16th - summer log -
2008s-78;
2008s-79;
2008s-81 -
(Two accounts) Extensions in entrance rift.
Final recalculated length is TL 554.3m (Extended by 80m)
2009
August 9th - summer log -
2009s-43
August 10th - summer log -
2009s-50
2014
April 14th - Easter log -
2014e-14 -
2 small extensions near bottom entrance. Survey in log book.
2015
August 10th - summer log -
2015s-42 -
Google Earth 0450749 4795309 Altitude 278.
~10m vertically above station 2008-2.9
Cefrales bottom entrance given own number: site 4210
2023
April 4th - Easter log -
2023e-06 -
No bats seen in the entrance. Photos taken.
Published documents: print and digital
• [F]
Corrin J et al, 1978 Matienzo 1978 J. Manchester University Speleological Society No 9
• pp18-19 - description; L=c320m
• [Z]
Corrin J, 1983a The South Vega System. Major south Vega cave surveys The 1981 & 1982 Matienzo Expeditions
SVS survey
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p18 - Summary
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p15 - Summary
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p13 - Summary
• [FM]
Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p19 - ?
• p22 - ?