Extra notes from card index
• L82 - middle description
• SEE RENADA AFTER THIS
• Depth 305m to Comediante level.
• See Reñada for "Reñada III"
•
• 1994 No entry through Azpilicueta. Extension in Reñada. TL=21982m
• (Cabaña extended by 59m SVS TL = 24915m)
• L01 (27/7/01) 1338/Coteron link. SVS 25304+618 = 25922m
• Ghost Lake and extension surveyed. TL=26057m
• TL=26170 after Xmas 2001
• TL=26287m (Moat of Doom in Reñada.
• L03 Papá Noel (1471) linked to SVS Copteron. Length of SVS is now 26287+2637 = 28924m
• Length @{ end of Whit 2004 is 30368.2m
• L06 Additions P.N. and Reñada TL=31359.1m
• L07E Additions in PN1471 TL=31451m
• L09E Dived extensions in Reñada.
TL=40+31451 = 31491m
• L10 Tie in above dive with new passage surveyed. L=78m TL=31569m
• (After Easter 2012 TL=32003)
• After summer 2012 TL = 32951 (Comellantes) depth =339m
• Easter 2014: TL=33071 (Sq. Passage dive)
• 2015S: TL = 33969.3 after finds in Reñada
• L15A TL=34029
• After 0040 TL=34036
after 0048 TL = 34066m
• After 0264-16-01 resurvey. New =175.9m
34066+176 = 34242m @ end Easter 2016
• End of Easter 2017 TL=34345
• Viana 2016 description pdf
• Easter 2019. TL=34345 + Batches 19-02 + 19-03 in Reñada 12m 158m = 170m
However, 85m is resurvey.
• Final from PP - new is 11m therefore TL=34345+11 = 34356+12+158=34537m
• Summer 2019 Itchy Crutch extension
TL=34537+46 = 34583m
• Length is shown as 34783m including 200m unsurveyed 0675.
Orphan card index date references to logbook pages
• [12/08/1987] New series noted off side of 3rd pitch
• [08/08/1991] Top entrance 675 connected above 4th (60ft) pitch. Depth now ~ 310m
• [19/08/1991] TL=21066m incl. extension not yet entered in computer. New Azpilicueta entrance has yet to be surveyed.
• [09/08/1992] 90m surveyed
• [11/08/1992] Body recovery
• [13/08/1982] Remove route markers + tidy up from Reñada.
• [16/08/1992] Resurvey + survey side bits. in Sanatogen
• [18/08/1992] Resurvey + survey side bits. in Sanatogen
• [15/08/1993] Traverse round Giga Hall into well-decorated passage. Surveyed 319m
SVS TL=21906m
• [08/08/1995] (1) Digging at choke
(2) Extended over water.
• [11/08/1995] Link with Reñada-Cabaña surveyed.
TL SVS = 21982 + 90 + 2180 (Cabaña) = 24252m
• [13/08/2000] (1) Extension off Coffin Levels
(2) End of Coffin Levels surveyed. Close to 1471.
TL=95+25209 = 25304m
• [13/08/2003] Connection of Tumbling Dice (Papá Noel) to Reñada. 138m pitch
SVS TL = 29068m
• [17/08/2003] p20 in 1471 TL=29088m
• [03/08/2004] Connected to Papá Noel through Hall of Tubes / At the Opera
TL=30570.5m
• [11/11/2005] Additions in P.N.
• [13/04/2006] Additions in P.N. TL=30612+117.5 = 30730m
• [03/08/2014] To sump then detackled.
• [16/08/2026] After Wiggle Passage survey in Cabaña, SVS TL = 34783m + 78 = 34861m
• [26/08/2026] After batches in Reñada (8/8/26 and 10/8/26)
TL SVS=34861+169+126 = 35156m
Dated logbook entries with card index notes
1982
January 1st - summer log -
1982s-05
July 17th - summer log -
1982s-03;
1982s-04 -
Initial exploration - part way down pitch 2
July 19th - summer log -
1982s-04 -
Down 15ft to head of next pitch. SKETCH
July 21st - summer log -
1982s-07;
1982s-08 -
Down to head of big pitch
July 23rd - summer log -
1982s-08;
1982s-09 -
On big p[itch - 400ft rift
Survey to -115m + upstream SKETCH
July 26th - summer log -
1982s-11 -
Into chamber SKETCH
July 28th - summer log -
1982s-12 -
In chamber - down pitches
July 30th - summer log -
1982s-17 -
Detackled.
January 1st - summer log -
1982s-60;
1982s-69;
1982s-70;
1982s-74
1984
August 13th - summer log -
1984s-90;
1984s-91 -
Tackled up for SRT. Bits explored off main chamber. SKETCH.
August 14th - summer log -
1984s-96;
1984s-97 -
(1) Poke about above 90ft.
(2) Into new sandy passage for 300 - 400m.
August 17th - summer log -
1984s-A7;
1984s-A8 -
Extended off main chamber (½km) and detackled. SKETCH
August 22nd - summer log -
1984s-B4
1985
July 28th - summer log -
1985s-12;
1985s-13 -
Partial tackling.
August 4th - summer log -
1985s-30;
1985s-31 -
Trip to obtain Reñada connection. Instead about 1km found from big chamber; possibly to Giga Hall. Lots to go at. SKETCHES
August 5th - summer log -
1985s-33 -
Phil, Graham, Mark, Slug. Surveying finds made yesterday. Giga Hall is joined with Azpilicueta.
August 7th - summer log -
1985s-40;
1985s-40;
1985s-41;
1985s-49;
1985s-50;
1985s-50 -
(1) "½km" of crawls, pitches and small chambers heading towards Stuffed Monk (Phil)
(2) Coffin level + surveying + 3rd account later + 4th account
August 9th - summer log -
1985s-44;
1985s-45;
1985s-46 -
Phil + Steve connect with Jim Davis from Reñada. Terry surveys ~500m heading west. Italians connect Azpil. to Giga Hall.
August 11th - summer log -
1985s-52;
1985s-56;
1985s-57 -
Better route into Reñada. Azpil. detackled.
August 13th - summer log -
1985s-62;
1985s-63
August 14th - summer log -
1985s-68
1986
July 17th - summer log -
1986s-06 -
Tackled up with rope.
July 18th - summer log -
1986s-07;
1986s-08 -
Mud wall climbed. Nothing at top. Resurvey of loop - thought to be wrong.
July 22nd - summer log -
1986s-19;
1986s-20;
1986s-21;
1986s-22 -
New side passage surveyed
July 23rd - summer log -
1986s-23
July 31st - summer log -
1986s-57
August 4th - summer log -
1986s-69;
1986s-72
August 8th - summer log -
1986s-84
August 12th - summer log -
1986s-96
August 18th - summer log -
1986s-A5;
1986s-A6 -
Detackling
1987
January 1st - summer log -
1987s-56;
1987s-57
August 7th - summer log -
1987s-38;
1987s-38;
1987s-38;
1987s-46 -
(1) Failure to find passage with pits.
(2) Pushing into Reñada 2½. Now needs dive.
(3) (Further in log) Portienzo Passage looking for links with Reñada 2½. All choke.
August 8th - summer log -
1987s-70
August 11th - summer log -
1987s-53 -
Photo trip in Rub-a-Dubs + Giga Hall. New series noted off side of 3rd pitch
August 13th - summer log -
1987s-57 -
Big Brick Chamber resurveyed.
August 15th - summer log -
1987s-63;
1987s-75 -
New series partly surveyed
August 20th - summer log -
1987s-70 -
Return to new series pushing on. Not surveyed.
August 21st - summer log -
1987s-72 -
New pitch down - derigged still going.
August 23rd - summer log -
1987s-74 -
Detackled
1988
August 12th - summer log -
1988s-77 -
2 Croyden into 1987 side extension. Partly done.
August 13th - summer log -
1988s-79 -
Continue in side extension to start of undescended bit.
August 20th - summer log -
1988s-A2;
1988s-A4;
1988s-A5 -
Continue and detackle.Sketch. Needs ladders and long belays. Not Impressed!
1989
January 1st - summer log -
1989s-00
1990
August 15th - summer log -
1990s-36
1991
August 9th - summer log -
1991s-45 -
Into Reñada 3. Radiolocated end at chamber. Sump may be lower after removing part of natural dam. Lots of small leads still.
Surveyed 114m at end SVS TL = 20504m
August 11th - summer log -
1991s-50;
1991s-51 -
Pushing passages near Wooden Hill
1992
August 4th - summer log -
1992s-23;
1992s-24 -
Pushing at NE end. 156m surveyed.
August 6th - summer log -
1992s-31;
1992s-32 -
Pushing at NE end. 163m surveyed.
August 8th - summer log -
1992s-32 -
(1) Nothing new in NE extensions,
(2) 15m surveyed incl. in next.
August 10th - summer log -
1992s-34;
1992s-65;
1992s-66 -
Photography. Survey (length). Giles Barker death.
August 12th - summer log -
1992s-73
1993
August 3rd - summer log -
1993s-29 -
Tackle up through Giga Hall (passage on opposite wall). Survey bit in Coffin Levels 52.1m
SVS TL=21587m (incl. Sanatogen Extensions.
August 14th - summer log -
1993s-67
1995
July 26th - summer log -
1995s-06 -
Tackled up. Traverse over mud out over big pit and beyond. Still going.
July 31st - summer log -
1995s-29 -
Mud traverse to nothing.
August 5th - summer log -
1995s-60;
1995s-61 -
(1) Through trip.
(2) Digging at terminal choke.
August 10th - summer log -
1995s-77;
1995s-79 -
(1) Photograph chamber above Giga Hall.
(2) SUrveyed passage in water found 8/8/95. 90.4m
1996
April 8th - Easter log -
1996e-24;
1996e-25 -
Into Reñada 3 through 0048. Extension into chamber to south with inlets entering from the east. Still open.
Surveyed 203m. TL = 24455m
July 24th - summer log -
1996s-01
August 3rd - summer log -
1996s-12;
1996s-13 -
Cave rigged and through trip done.
August 5th - summer log -
1996s-18 -
China Syndrome passage extended to large chamber, unexplored passages and good prospects.
Surveyd 401m TL=401+24455=24856m
August 11th - summer log -
1996s-26 -
Cave derigged. Looked at "interesting" Portienzo Passage. Pull through belays detackled.
1997
March 28th - Easter log -
1997e-02 -
Rigged and through trip.
April 2nd - Easter log -
1997e-06 -
China Syndrome extension. 144.1m TL=25059m
August 1st - summer log -
1997s-23
August 15th - summer log -
1997s-62;
1997s-63;
1997s-67 -
(1) China Syndrome looked at. Still a good prospect. No surveying.
(2) Lake area investigated. 30m found not surveyed. Area needs systematic look.
1998
August 13th - summer log -
1998s-30;
1998s-31 -
Pull through trip: Pushing up China Syndrome Aven. CDLimbs done but there are more possibilities in Valline.
2002
March 11th - February log -
2002f-07;
2002f-07
March 12th - February log -
2002f-09
March 13th - February log -
2002f-09
April 5th - Easter log -
2002e-32
August 7th - summer log -
2002s-16 -
Dive in Rub-a-Dub Dubs sump going about 100m to the west. Not surveyed.
August 10th - summer log -
2002s-26 -
Detackle - flooded out.
August 13th - summer log -
2002s-27 -
Detackle
December 24th - Xmas - New Year log -
2002c-01 -
GPS + photo entrance. Caves in this area will need relocating on map.
2003
December 8th - autumn log -
2003a-08
2004
August 7th - summer log -
2004s-31 -
Resurveyed Selenite Crunch - now drawn on survey.
2005
March 29th - Easter log -
2005e-22
2006
October 21st - autumn log -
2006a-00
2007
January 1st - summer log -
2007s-00
2008
January 1st - Easter log -
2008e-00
2011
April 20th - Easter log -
2011e-12 -
Previous trip to tackle up? Diving gear to base of Giga Hall. Some out of 333; others do through trip.
April 27th - Easter log -
2011e-33;
2011e-34;
2011e-35 -
Rupert Skorupka dives the sump near "into the Tub" corner. Passaes Mark Smith 75m limit at 12m depth. RS reached 150m in @ 17.5m depth. Visability excellent. Passage continues 5m wide.
April 29th - Easter log -
2011e-36 -
RS dive gear through to downstream side of Sump 1. Met by carrying team. Gear transported to Squirrel's Passage.
TL=31569+150 dive surveyed = 31719m
June 23rd - summer log -
2011s-01
2014
August 1st - summer log -
2014s-40 -
Trip to R a DDs
August 4th - summer log -
2014s-40
2015
July 24th - summer log -
2015s-02 -
Grid ref from G Earth photo. 30T 0450248 4784758 Altitude 477 Knob of rock directly over first climb down in rock out of entrance depression.
2017
May 14th - Easter log -
2017e-51 -
Photos
2018
August 27th - summer log -
2018s-62 -
Fly over + panoramic aerial photos in aera.
2022
February 8th - Jan-Feb log -
2022jf-08 -
Photo from distance
July 30th - summer log -
2022s-09 -
Through trip (incl write up) Pull through.
2023
April 4th - Easter log -
2023e-09 -
Azpilicueta - investigating '1987 Extensions'
April 11th - Easter log -
2023e-47 -
Too much mud. Not enough rock. Sketch around old data.
2025
June 18th - summer log -
2025s-02 -
Drawn up survey pdf of upstream SVS (PP)
August 5th - summer log -
2025s-28
2026
August 3rd - summer log -
2026s-69 -
Catalan trip to suss out routes at the Rub-a-dub-dubs
August 5th - summer log -
2026s-69;
2026s-70 -
Further Catalan work down Azpilicueta.
Published documents: print and digital
• [S]
Addis F, 1982 Matienzo 1982 Caves & Caving 18, Nov. 1982
• pp28-30 - Surveys;. account + photos
• [G]
Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions • cover - Photo
• p6 - Photo-diagram entrance position.• p7 - Exploration account• p8 - Survey plan + photo.• p10 - Survey elevation.• p30 - PL=332 TL=573 D=263m
• [Z]
Corrin J, 1983a The South Vega System. Major south Vega cave surveys The 1981 & 1982 Matienzo Expeditions
SVS survey
• [N]
Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p15 - 1985 extensions
• [O]
Corrin J, 1987 Matienzo '86 Caves & Caving 35, Spring 1987
• p16 - 1986 resumé
• [BO]
Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
Mention of possibilities.
• [BQ] Stacey P, 1992
Matienzo Descent 108. October / November 1992 Wild Places Publishing, Abergavenny
• p6 - Obituary
• p16 - Giles Barker accident
• [CL]
Cawthorne B, 1992 Matienzo 1992 Newsletter No. 64. August 1992. W Pengelly Cave Studies Trust
• p27 - Note on accident
• [BT]
Quin A, 1993a Karst Processes and Landforms in the Matienzo Depression, Cantabria Northern Spain. • p17 - Significant karst feature
• [BW] Openshaw S et al, 1993
Secular Variation in Stalagmites from the Matienzo Depression, Santander, Spain. A Project Outline Sample of stal taken for dating
• [BY]
Corrin J, 1993 Expedicion Britanica a Matienzo (Año 1992) BCE Cantabria Subterránea, No. 9, Nov. 1993.
• p102 - Note on accident
• [CH]
Ogando Lastra E, 1993 Informe: Alertas y Actuaciones del Espeleosocorro Cantabro (1992) BCE Cantabria Subterránea, Noviembre 1993
Giles Barker fatality in '92
• [BZ]
Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
• p25 - Summary '93
• [CU]
Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p68 - Summary '93
• [CX]
Corrin Juan, 1995a Matienzo '95 Caves & Caving, Issue 70, Winter '95
• p25 - Mention.
• [DM]
Corrin Juan, 1997a Matienzo Caves & Caving, Issue 75, Spring '97
• pp16-18 - Summary of the '96 finds. China Syndrome.
• [DR]
Corrin Juan, 1997b Expedición Británica a Matienzo 1996 Boletín Cántabro de Espeleogía no 13. Santander.
• p81 - Summary of the '96 finds.
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • pp417-421 - summary & exploration history
• [DV] Corrin Juan, 1997c
El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p712 - Future hopes.
• [DN]
Corrin Juan, 1998 Matienzo 1997 Caves & Caving, Issue 79, Spring '98
• p27 - 1997 summary.
• [EF] Corrin Juan, 2001a
The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p13 - Mention in summary article.
• [ES]
Corrin Juan, 2003c Las Cuevas de Matienzo. Exploración y documentación. La Cueva de Cofresnedo en el Valle de Matienzo Ruiz Cobo Jesús and Smith Peter (directores)
• pp30-31 - Part of the SVS summary
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• pp12-13 - Summary of '03 work. NEW TRACK. One of eight entrances.
• [EX]
Corrin Juan, 2006 Expedition Report: Matienzo, Spain 2004 Speleology Issue 6, April 2006 BCRA
• p22 - Summary
• [FD]
Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p31,33 - Mention in Spanish summary article
• [FO]
cantasub2010-vol1.pdf and
cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2 • pp481-487 - History; description as part of the SVS.
• p483 - Entrance photo• p484 - Survey section
• [GH]
Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• pp42-51 - Possible link to Asón systems.
• p43 - On map (postulated hydrology)