Extra notes from card index
• Entrance 0452177 4799241 Altitude 258m
Dated logbook entries with card index notes
1975
August 7th - summer log -
1975s-39 -
Seen
August 8th - summer log -
1975s-41;
1975s-42;
1975s-43 -
Descended. Surveyed
August 12th - summer log -
1975s-46
1979
August 17th - summer log -
1979s-26
1998
July 25th - summer log -
1998s-01;
1998s-02
2004
August 1st - summer log -
2004s-22 -
Rigged for SRT. 4 bolts for p7. ? For main drop
August 5th - summer log -
2004s-25 -
Re-explored down to sump. Passages noted on side of pitch. Sketch.
2019
August 4th - summer log -
2019s-15 -
Prelim. visit
August 7th - summer log -
2019s-27 -
Lassoo stal @ 2nd passage off shaft. Closes in. Other leads in shaft left for next visit.
August 15th - summer log -
2019s-39 -
(1) Surveyed inlet at start of entrance.
(2) Surveyed down to the traverse.
(3) Bolted around to new passage.
Total 233m surveyed -> 203m
TL=204+203 = 407m
August 16th - summer log -
2019s-44 -
Dig at end of new passage. 7m gained. More required. Can hear falling water. De-rigged main rope.
Old length "120m" is wrong. Should have been 224
Published documents: print and digital
• [P1]
Corrin J et al, 1981b Matienzo Expeditions 1979-80 J. Manchester University Speleological Society No. 10
• p4 - 50m from 3rd River Inlet
• [EX]
Corrin Juan, 2006 Expedition Report: Matienzo, Spain 2004 Speleology Issue 6, April 2006 BCRA
• p23 - Summary