Updated 7th May, 28th November 2024; 23rd May 2025
A GE Pistruellos site which Matienzo cavers had been asked to work on. Two visits saw the draughting hole enlarged to a corner at 3m in. The way on is down a small sloping passage that may dig out. Miguel of the GE Pistruellos has been informed. Four trips were spent enlarging the end at Easter 2024. Digging in September 2024 was very slow in crappy rock.
In April 2025, after working with plugs and feathers, debris was cleared.
References: anon., 2016d (autumn logbook); anon., 2024b (Easter logbook); anon., 2024e (autumn logbook); anon., 2025a (Easter logbook)
Entrance pictures :
Underground pictures :
Video :
Detailed survey :
Line Survey :
On area survey :
Survex file :