Extra notes from card index
• Rigging guide about 16/8/13 and 17/8/13
• Correction to 0841.svx + 15-01.svx
Orphan card index date references to logbook pages
• [25/07/1992] Pushed loose ends.
• [05/04/2004] Tackled up.
• [06/04/2004] Side passages surveyed to Block Chamber.
(1) 169.8 (2) 102.3m
TL=7045+271.1 =7316.1m
• [11/04/2004] Not Worthwhile Passage 103.8m
7316.1+103.8 = 7419.9m
(Write up after Whit in log book)
• [04/08/2006] Photo. GPS
• [07/08/2007] Not in log. Photo.
Dated logbook entries with card index notes
1990
August 8th - summer log -
1990s-12;
1990s-15;
1990s-16 -
Hole opposite 126 Cueva Fresnedo. Dug into. Explored for about 50m, still going.
1991
August 5th - summer log -
1991s-32 -
Re-explored. Strong draught. Surveyed.
Dig worth doing. Possible back way in seen. Little draught.
August 11th - summer log -
1991s-60;
1991s-61 -
Dug to small chamber and ways on.
August 13th - summer log -
1991s-61
August 15th - summer log -
1991s-71 -
Large extension to the Howling.
August 19th - summer log -
1991s-75;
1991s-76 -
Up into high phreatic passage.
TL=1466m at end of '91Digging at Howling.
1992
July 24th - summer log -
1992s-06;
1992s-06 -
Pushed loose ends.
July 29th - summer log -
1992s-11 -
Pushed ends.
July 30th - summer log -
1992s-13;
1992s-14 -
Small amount surveyed.
July 31st - summer log -
1992s-16 -
(1) Small amount surveyed.
(2) 254m surveyed.
August 1st - summer log -
1992s-17 -
Heading ESE.Total length 2863m
August 3rd - summer log -
1992s-21 -
(1) Major push SE 747m
(2) High level oxbow
August 4th - summer log -
1992s-23;
1992s-23 -
(1) Howling dug
(2) BOlting
(3) Major push 858m
August 5th - summer log -
1992s-26 -
(1) Ecstacy linked to Howling.
(2) Bits surveyed.
August 8th - summer log -
1992s-37 -
Inlets heading NE surveyed.
L=5585m
August 14th - summer log -
1992s-38 -
Surveyed 114m L=5699
August 15th - summer log -
1992s-43 -
Surveyed 418m L=6117m
August 18th - summer log -
1992s-51 -
photography; surveying?
August 23rd - summer log -
1992s-64
1993
July 26th - summer log -
1993s-06 -
Side passages / chambers surveyed before Cascade Inlet. Surveyed 149.4
TL=6117+149.4 = 6266.4m
July 27th - summer log -
1993s-09 -
Knotted Rope Series 65m
TL=6331.4m
July 29th - summer log -
1993s-15 -
Extension to Knotted Rope Series.
TL=6488m
July 31st - summer log -
1993s-20;
1993s-21 -
Bolting chamber to alcove.
August 5th - summer log -
1993s-47 -
Pushing near end.
TL=6557m
August 8th - summer log -
1993s-51 -
Detackle. Pitch in Tile Passage descended - too tight. Loose hole needs decending through boulders.
August 9th - summer log -
1993s-54 -
Looking at What and Which passages
August 11th - summer log -
1993s-64 -
Extension to Knotted Rope Series
TL=6761m
August 13th - summer log -
1993s-66 -
Detackle.
August 23rd - summer log -
1993s-77 -
Soft Option Chamber. Down to ~25m muddy passage - unsurveyed.
1994
March 29th - Easter log -
1994e-05 -
Poking in That Chamber
January 1st - Easter log -
1994e-36
April 3rd - Easter log -
1994e-30 -
Sediment sample taken.
July 31st - summer log -
1994s-23 -
Digging in passage to right at Loredo Junction.
August 2nd - summer log -
1994s-23;
1994s-24 -
(1)Rigged Pendulum Pitch. Traverse lines set up. Avens checked with torch.
(2)Bolting in That Chamber
August 4th - summer log -
1994s-27;
1994s-27;
1994s-28;
1994s-28 -
Continue above. 40m surveyed.
TL=6801m
1995
July 31st - summer log -
1995s-33 -
Extensions around St Pauls Chamber. 26m
August 2nd - summer log -
1995s-33;
1995s-34;
1995s-35 -
Bolting and traverse near chamber 101m
August 3rd - summer log -
1995s-40;
1995s-41
August 19th - summer log -
1995s-A2 -
In Pauls Chamber 117m
TL=7045m
1999
August 1st - summer log -
1999s-22 -
Abortive capping trip to boulder choke below Paul's Chamber.
Visited The Howling.
2000
January 1st - summer log -
2000s-00
2001
April 12th - Easter log -
2001e-18 -
(1) Rift climbed at base of passage from Laredo Junction ~8m to muddy chamber with 2 footprints.
(2) Also passage on way out between 1 Footprint Passage + the crawls to choke.
20m explored up in higher passage.
2002
April 6th - Easter log -
2002e-32
April 19th - Easter log -
2002e-33
2004
April 10th - Easter log -
2004e-28;
2004w-06
June 10th - Whit log -
2004w-07
2012
February 9th - Jan-Feb log -
2012jf-04
2013
July 21st - summer log -
2013s-01 -
Entrance re-opened.
GPS of entrance 0453263 4801416
January 1st - summer log -
2013s-80
August 12th - summer log -
2013s-70;
2013s-75;
2013s-76;
2013s-77 -
Cave tackled up.
August 14th - summer log -
2013s-71;
2013s-72 -
Explored to "scary" climb near end.
Passage near sump - "accessible stream" - surveyed for 179m to mud choke.
Half way along, stream heard down hole which needs descending.
Batch 13-01 L=179m
TL=7599m
2015
July 31st - summer log -
2015s-19 -
Howling is only 5m long. Dug out.
August 8th - summer log -
2015s-38;
2015s-39;
2015s-40 -
Through Howling again.
Pushed downstream. Becomes tight. Needs lumphammer. 41.2m new.
TL=7599= 41=7640m
2016
March 15th - Easter log -
2016e-06 -
Howling excavated.
Steps put in mud banks.
Check out any leads between Ecstacy Chamber and the Howling.
March 22nd - Easter log -
2016e-12;
2016e-13 -
(1) Handlines installed.
(2) Oxbow looked at and pushed.
Still going. Batch 16-01
March 25th - Easter log -
2016e-19;
2016e-20 -
(1) Pushed inlet off Munster's Waltz. Shabby Passage. Total 16-01 length =116m. ends in sump
(2) Downstream pushed 16-02 L=172m Not Too Shabby Passage
TL=7640+116+172=7928m
Batch descriptions in log book.
August 5th - summer log -
2016s-35 -
Exploring off centre line only passages. Batch 16-03 L=31m
TL=7959m
August 15th - summer log -
2016s-52 -
Photos.
2017
April 13th - Easter log -
2017e-16;
2017e-17 -
(2004E batches - corrected - attached to correct station)
This trip explored unsurveyed routes around Block Chamber / Situation Normal, to the south of main route to the end.
Batch 17-01 L=374.3m
TL=7959+374=8333m
April 15th - Easter log -
2017e-22;
2017e-23;
2017e-24 -
(1) Batch 17-01 increased stations 62-65.
Batch 17-01 = 398m TL=8357m
(2) Batch 17-02 L=84.6
TL=8357+85=8442m
April 18th - Easter log -
2017e-31;
2017e-32;
2017e-33 -
Scaling pole up waterfall into extension to aven.
Batch 17-02 169m
TL=8442+169 = 8611m
July 30th - summer log -
2017s-13;
2017s-14 -
Waterfall bolted. Higher level continues to dig. Some surveying done - to be added to next visit
August 2nd - summer log -
2017s-22;
2017s-23 -
Pitch climbed up. Streamway too tight. Higher levels. End chamber is "That's All Folks!". Possible other leads.
Batch 17-04 (previous trip) = 51.8
Batch 17-05 = 314.2 L=366m
TL=8611+366 = 8977m
2018
August 1st - summer log -
2018s-22 -
Investigate leads in "That's All Folks!" area.
Some closed down. Some remain. See log book.
August 4th - summer log -
2018s-23 -
Bolting near terminal choke up into possible passage.
August 6th - summer log -
2018s-24;
2018s-25 -
Continuation of above. Main lead followed north for about 100m with holes above.
p15 reached down to large passage streamway. Good draught.
Surveyed Batch 18-01 L=189
TL=189+8977 = 9166m
August 9th - summer log -
2018s-32;
2018s-33 -
Inlet passage near entrance maypoled and pushed Batch 18-02 L=73m
TL=9166+73 = 9239
August 11th - summer log -
2018s-34;
2018s-35 -
Down p15 @ end; explored and surveyed downstream.
Draughting route is partway down pitch - yet to be entered
Batch 18-03 L=106m
TL=9239+106 = 9345m
August 27th - summer log -
2018s-63;
2018s-64 -
Push @ end. Batch 18-04 to aven. 18-05 207m
TL=9592m
18-05 streamway called "The Honeymoon Period"
2019
April 15th - Easter log -
2019e-18;
2019e-19 -
Trip to end.
(1) E.M. Inlet finished quickly.
(2) Downstream too small down p7.
Seems to be finished apart from possible bolt climb. L=28m 19-01
TL=9592+28 = 9620m
August 2nd - summer log -
2019s-18 -
Bolted "A Bit on the Side" to large chamber. Traverse at top required tp reach possible passage.
(James C. knee damaged on walk, so no other trips this summer.)
2021
August 7th - summer log -
2021s-26 -
Knotted Rope Series not accessible up 30yr-old rope on p20.
Other passage left open
2022
August 4th - summer log -
2022s-22;
2022s-23;
2022s-24 -
To check a lead in Knotted Rope Series. Careful prusik up 30yr-old rope and re-rig.
Various investigations. Sketch.
August 6th - summer log -
2022s-29;
2022s-30 -
KRS - Andy Pringle lead is an alcove. Other leads crapped out.
2023
March 20th - Easter log -
2023e-01 -
Substantial re-write of the description (James Carlisle)
2025
February 23rd - Xmas- New Year log -
2024c-34
2026
August 8th - summer log -
2026s-46 -
Pepe le Puits traverse started.
August 10th - summer log -
2026s-46 -
traverse not reached - ran out of time.
August 15th - summer log -
2026s-52 -
Traverse complete.
Batch 0841-26-01 l=14m
TL = 14m + 9620 = 9634m
Published documents: print and digital
• [BO]
Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
Summary - shown on area map.
• [BW] Openshaw S et al, 1993
Secular Variation in Stalagmites from the Matienzo Depression, Santander, Spain. A Project Outline Sample of stal removed for dating.
• [BY]
Corrin J, 1993 Expedicion Britanica a Matienzo (Año 1992) BCE Cantabria Subterránea, No. 9, Nov. 1993.
• p102 - Summary. Survey plan and section
• [BZ]
Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
Summary of '93. Area map.
• [CS]
Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
• p11 - Length only reported. Onarea map.
• [CU]
Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
Summary of '93. Area map.
• [CX]
Corrin Juan, 1995a Matienzo '95 Caves & Caving, Issue 70, Winter '95
• pp25-26 - Mention and photo of bolting.
• [FJ]
Corrin Juan, 1996 Matienzo '95 Boletín Cántabro de Espeleología no. 12
• p79 - Mention
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • pp641 - 643 - Summary & exploration history. Photo.
• [DV] Corrin Juan, 1997c
El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p712 - Future hopes.
• [FD]
Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p32 - Mention in Spanish summary article
• [GK] Ruiz Cobo J and Muñoz Fernández E, 2013
El registro arqueológico del valle de Miera BAR International Series 2542 Archaeopress, Oxford
• p58 - Resumé Wild Mare Cave.
• [KL] Corrin Juan et al, 2025
Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161
(area map + photos)