#0075 Picón, Simas del
Cubija - 30T 0450008 4796651 Altitude: 300m - Length: 2717m Depth: 110m
Website description for site 0075   |   Site in context, area map

Extra notes from card index
• file
• L84 Checking out hole. Entrance ponly 50ft deep.
• details of surface survey
• 3hr radon reading is 4, equating to 32 Bq/m³ as a 1 day figure. However, draught was in …
• … TL=1834 + 209 = 2043m Ali's resurvey TL = 2256m
• New description (Ali)

Orphan card index date references to logbook pages
• [10/08/1983] Down sandy pitch to deep series TL 1032m Depth 86m
• [11/08/1983] Across sandy pitch and down to view into chamber - Lastrilla nearby? TL=1206.5m
• [24/04/1994] French team A.S.C. extend up climb at old southern end. ~100m found. TL now 1342m incl unsurveyed French bit.
• [31/07/1994] (1) Pit below French bit partly descended. (2) Calcite choke looked at. Diagram.
• [09/07/2007] photography (Not in log?)
• [02/08/2012] Attempt to extend Mega Bat. Lloyd C. - boulders fell on him on pitch into extension. Four stitches needed.
• [16/09/2013] Change TL = 2717m

Dated logbook entries with card index notes

1978

July 13th - summer log - 1978s-02

1984

August 2nd - summer log - 1984s-30

1993

August 6th - summer log - 1993s-38 - Resurveyed. Some drauighting holes found.
August 7th - summer log - 1993s-40 - Extended into draughting passage
August 8th - summer log - 1993s-51; 1993s-52 - Surveyed. Muddy ramp still to be descended. 291.6m surveyed. TL=850.3m
August 10th - summer log - 1993s-61
August 11th - summer log - 1993s-65
August 12th - summer log - 1993s-65 - Small extension. Derigged. TL=1241m Depth 87m Vert range +10 - 87

1994

March 29th - Easter log - 1994e-04 - Small extensions. Cave finished?
April 3rd - Easter log - 1994e-28
July 30th - summer log - 1994s-18; 1994s-19
August 3rd - summer log - 1994s-22 - Dug draughting dig on S side. Still going.
August 4th - summer log - 1994s-27 - Surveyed finds 47m Mega Bat Series. TL=1388m Other bits looked at.
August 7th - summer log - 1994s-33 - Bits. Surveyed 53m TL=1441

2000

February 27th - February log - 2000f-01
April 23rd - Easter log - 2000e-25 - photography
August 1st - summer log - 2000s-16 - Some climbing and poking about
August 4th - summer log - 2000s-18 - Climbing near entrance
August 5th - summer log - 2000s-23 - Check out draughting hole at bottom of Mega Bat.

2001

April 11th - Easter log - 2001e-07 - Finishing off climb at aven in 2nd chamber. About 15m high and closes down. Sketch.

2003

August 18th - summer log - 2003s-45 - photography + video to near the end

2008

January 5th - Xmas - New Year log - 2008c-02

2011

July 29th - summer log - 2011s-22; 2011s-23 - GPS 0450110 4796860 Looked at Mega Bat. Too tight to get down to new extensions in Morenuca.
August 8th - summer log - 2011s-42 - Dig not far from entrance through squeeze inboulders.Dug down. Gave up.
September 6th - summer log - 2011s-66

2012

February 4th - Jan-Feb log - 2012jf-07 - tourist trip. Cold weather; cave draughting in.
April 4th - Easter log - 2012e-15 - Used snappers at bottom of Mega Bat. Now larger but needs more work.
July 24th - summer log - 2012s-03; 2012s-03 - (1) Mega Bat - further snappering. (2) Unpushed lead to N of Music Box area looked at.
July 25th - summer log - 2012s-07 - Explore new drop @ stn 0 -1993 N of Music Box. Drop 5m into chamber. Hole in floor measured with Disto to 50m depth - probably Regaton? A flake blocks the route down. Good draught. L=57m TL = 1441+57 = 1498m
July 26th - summer log - 2012s-07; 2012s-08 - More snappering @ Mega Bat. Hole open access difficult past a flake which needs removing. Reached roof of chamber ~5m high? Could be Picón Pie Chamber in Morenua (no survey).
July 27th - summer log - 2012s-11; 2012s-12 - Mega Bat opened up. Down handline slope to 4 chambers; one has a 60m aven. Halfway down slope is a draughting rift to another chamber with another potential aven. 175m surveyd. TL=1498 + 175 = 1673m
July 30th - summer log - 2012s-19 - Misc Box area. Top of 50m drop opened up but not enough to descend.
July 31st - summer log - 2012s-27; 2012s-39 - (1) Opened. But got too tight @ rift 15m down. (2) Cave survey restarted.
August 1st - summer log - 2012s-27; 2012s-28
August 3rd - summer log - 2012s-30 - Exploration down Mega Bat. Into 6m diameter chamber with no exit.Draughting window in side chamber.
November 6th - autumn log - 2012a-04 - Mega Bat visited to open up squeeze.
November 8th - autumn log - 2012a-04 - Squeeze easily passed in Mega Bat. No exploration.
November 10th - autumn log - 2012a-05 - Visit to ASC Extension. Bolted up.
November 11th - autumn log - 2012a-05; 2012a-06 - Exploration in ASC extension. Bypass to bolted climb dug out
November 14th - autumn log - 2012a-06; 2012a-07 - Melted Wax Candle of Doom Chamber entered at end. Batch 0075-new-12-02 All surveyed - total Autumn: 161m Include all of this as "new" TL=161 + 1673 =1834m Vert range = +36 -110 = 146m

2013

March 28th - Easter log - 2013e-10; 2013e-10; 2013e-25; 2013e-25; 2013e-26; 2013e-26; 2013e-31; 2013e-31 - (1) Resurvey (2) Extended Melted Wax Candle of Doom Chamber. …
March 30th - Easter log - 2013e-12 - Picón Eye + Pee Pee Chamber extension TL = 121m
April 2nd - Easter log - 2013e-15 - Small extension + aven climbs. Length = ?41m. On one climb found Ian Lawton 2001 sling.
July 24th - summer log - 2013s-08 - Gear in for 20m pitch push. Avens inspected.
July 25th - summer log - 2013s-10 - Returned to push Coral Rift Passage through 3 squeezes to decorated chamber "Wish You Were Here". L=118m 13-07
July 27th - summer log - 2013s-15 - Resurvey + new material off p20 below the high level traverse. 13-11
July 28th - summer log - 2013s-14 - Cave rigged to Mega Bat and the "drop zone"
July 29th - summer log - 2013s-16; 2013s-17 - (1) Various bits looked at. (2) Aven part climbed "French Aven"
July 31st - summer log - 2013s-24 - Aven climb finished 15m. Total = 35m
August 1st - summer log - 2013s-29 - Mega Bat extended part way down into large passage heading ~ east. L=96m Batch 13-12
August 2nd - summer log - 2013s-34; 2013s-35 - (1) Continue extension back towards slope coming down from entrance. Batch 14 and 13 178m + 48m (2) tourist trip
August 4th - summer log - 2013s-42; 2013s-43 - Extension to Mega Bat extension. (Not surveyed). Photos.
August 6th - summer log - 2013s-50 - Excavation @ base of entrance slope to try for connection through.
August 9th - summer log - 2013s-66 - De-rig. Nuts on through-bolts removed. TL=2739m (needs checking by AN) TL=2256+475 = 2731m

2015

April 4th - Easter log - 2015e-17; 2015e-18 - p10 dropped beyond Pee Pee Chamber. 1.5m is draughting dig. Snappers needed to progress.

2019

April 18th - Easter log - 2019e-58 - photography
August 17th - summer log - 2019s-45 - 1.5 hours to find entrance. Photo trip but no card in camera. Visited helictites.
August 21st - summer log - 2019s-51 - Assistance given to Wessex CC. Stretcher and man-power to get Malcolm Foyle from entrance top to helicopter 112. He'd fallen on the entrance pitch.
August 28th - summer log - 2019s-59

2023

November 6th - autumn log - 2023a-11 - Part exploration
November 7th - autumn log - 2023a-17 - photography

2025

February 10th - Xmas- New Year log - 2024c-31

Published documents: print and digital

• [E] Ullastre-Martorell J, 1975 Aportacion al conocimiento morfokarstica de la depresion de Matienzo (Santander) Cuadernos de Espeleología Vol. 8
• pp82-86 - Account + survey
• [P2] Smith P, 1981b Grupo de Espeleologia de Matienzo J. Manchester University Speleological Society No. 10
• p12 - Survey
• [T4] Corrin J S and Smith P, 1981 Matienzo Underground BCRA Transactions Vol 8(2)
• p97 - Descript. L=450 d=60
• [DE] Neill Alasdair and Jackson Keith, 1993 Matienzo '93 Plymouth Caving Group Newsletter and Journal, No. 119, Winter 93- 94
• p10 - Survey
• pp7-8 - Account of new exploration.
• [DF] Cawthorne R, 1993 Matienzo 1993 Plymouth Caving Group Newsletter and Journal, No. 119, Winter 93- 94
• p11
• [BZ] Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
Summary and area map + photos. Covers.
• [CS] Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
• p11 - Length only reported. On area map
• [DG] Neill A, 1994 Matienzo '94 (Part 1) Plymouth Caving Group Newsletter and Journal, No. 122, Nov 94
• p13
• [CU] Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p67 - Summary and on map
• [DS] García José León, 1997 Cantabria Subterránea. Catálogo de las Grandes Cavidades
• p448 - Summary & exploration history to 1996
• [EP] Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p17 - summary
• [EW] Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p11 - photography helictites
• p12 - mention re "1894" (should be 1984?)
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• p489 - On Cuibija System line survey and section
• p514 - History; description; line survey + section; photo• p545
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p10 - summary length
• p12 - summary length