Extra notes from card index
• file
• L84 Checking out hole. Entrance ponly 50ft deep.
• details of surface survey
• 3hr radon reading is 4, equating to 32 Bq/m³ as a 1 day figure. However, draught was in …
• … TL=1834 + 209 = 2043m
Ali's resurvey TL = 2256m
• New description (Ali)
Orphan card index date references to logbook pages
• [10/08/1983] Down sandy pitch to deep series
TL 1032m Depth 86m
• [11/08/1983] Across sandy pitch and down to view into chamber - Lastrilla nearby?
TL=1206.5m
• [24/04/1994] French team A.S.C. extend up climb at old southern end. ~100m found.
TL now 1342m incl unsurveyed French bit.
• [31/07/1994] (1) Pit below French bit partly descended.
(2) Calcite choke looked at. Diagram.
• [09/07/2007] photography (Not in log?)
• [02/08/2012] Attempt to extend Mega Bat. Lloyd C. - boulders fell on him on pitch into extension. Four stitches needed.
• [16/09/2013] Change TL = 2717m
Dated logbook entries with card index notes
1978
July 13th - summer log -
1978s-02
1984
August 2nd - summer log -
1984s-30
1993
August 6th - summer log -
1993s-38 -
Resurveyed. Some drauighting holes found.
August 7th - summer log -
1993s-40 -
Extended into draughting passage
August 8th - summer log -
1993s-51;
1993s-52 -
Surveyed. Muddy ramp still to be descended. 291.6m surveyed.
TL=850.3m
August 10th - summer log -
1993s-61
August 11th - summer log -
1993s-65
August 12th - summer log -
1993s-65 -
Small extension. Derigged.
TL=1241m Depth 87m Vert range +10 - 87
1994
March 29th - Easter log -
1994e-04 -
Small extensions. Cave finished?
April 3rd - Easter log -
1994e-28
July 30th - summer log -
1994s-18;
1994s-19
August 3rd - summer log -
1994s-22 -
Dug draughting dig on S side. Still going.
August 4th - summer log -
1994s-27 -
Surveyed finds 47m Mega Bat Series.
TL=1388m Other bits looked at.
August 7th - summer log -
1994s-33 -
Bits. Surveyed 53m TL=1441
2000
February 27th - February log -
2000f-01
April 23rd - Easter log -
2000e-25 -
photography
August 1st - summer log -
2000s-16 -
Some climbing and poking about
August 4th - summer log -
2000s-18 -
Climbing near entrance
August 5th - summer log -
2000s-23 -
Check out draughting hole at bottom of Mega Bat.
2001
April 11th - Easter log -
2001e-07 -
Finishing off climb at aven in 2nd chamber. About 15m high and closes down. Sketch.
2003
August 18th - summer log -
2003s-45 -
photography + video to near the end
2008
January 5th - Xmas - New Year log -
2008c-02
2011
July 29th - summer log -
2011s-22;
2011s-23 -
GPS 0450110 4796860
Looked at Mega Bat. Too tight to get down to new extensions in Morenuca.
August 8th - summer log -
2011s-42 -
Dig not far from entrance through squeeze inboulders.Dug down. Gave up.
September 6th - summer log -
2011s-66
2012
February 4th - Jan-Feb log -
2012jf-07 -
tourist trip. Cold weather; cave draughting in.
April 4th - Easter log -
2012e-15 -
Used snappers at bottom of Mega Bat. Now larger but needs more work.
July 24th - summer log -
2012s-03;
2012s-03 -
(1) Mega Bat - further snappering.
(2) Unpushed lead to N of Music Box area looked at.
July 25th - summer log -
2012s-07 -
Explore new drop @ stn 0 -1993 N of Music Box.
Drop 5m into chamber. Hole in floor measured with Disto to 50m depth - probably Regaton? A flake blocks the route down. Good draught.
L=57m TL = 1441+57 = 1498m
July 26th - summer log -
2012s-07;
2012s-08 -
More snappering @ Mega Bat. Hole open access difficult past a flake which needs removing. Reached roof of chamber ~5m high? Could be Picón Pie Chamber in Morenua (no survey).
July 27th - summer log -
2012s-11;
2012s-12 -
Mega Bat opened up. Down handline slope to 4 chambers; one has a 60m aven. Halfway down slope is a draughting rift to another chamber with another potential aven.
175m surveyd. TL=1498 + 175 = 1673m
July 30th - summer log -
2012s-19 -
Misc Box area. Top of 50m drop opened up but not enough to descend.
July 31st - summer log -
2012s-27;
2012s-39 -
(1) Opened. But got too tight @ rift 15m down.
(2) Cave survey restarted.
August 1st - summer log -
2012s-27;
2012s-28
August 3rd - summer log -
2012s-30 -
Exploration down Mega Bat. Into 6m diameter chamber with no exit.Draughting window in side chamber.
November 6th - autumn log -
2012a-04 -
Mega Bat visited to open up squeeze.
November 8th - autumn log -
2012a-04 -
Squeeze easily passed in Mega Bat. No exploration.
November 10th - autumn log -
2012a-05 -
Visit to ASC Extension. Bolted up.
November 11th - autumn log -
2012a-05;
2012a-06 -
Exploration in ASC extension. Bypass to bolted climb dug out
November 14th - autumn log -
2012a-06;
2012a-07 -
Melted Wax Candle of Doom Chamber entered at end. Batch 0075-new-12-02
All surveyed - total Autumn: 161m
Include all of this as "new"
TL=161 + 1673 =1834m Vert range = +36 -110 = 146m
2013
March 28th - Easter log -
2013e-10;
2013e-10;
2013e-25;
2013e-25;
2013e-26;
2013e-26;
2013e-31;
2013e-31 -
(1) Resurvey
(2) Extended Melted Wax Candle of Doom Chamber. …
March 30th - Easter log -
2013e-12 -
Picón Eye + Pee Pee Chamber extension TL = 121m
April 2nd - Easter log -
2013e-15 -
Small extension + aven climbs. Length = ?41m.
On one climb found Ian Lawton 2001 sling.
July 24th - summer log -
2013s-08 -
Gear in for 20m pitch push. Avens inspected.
July 25th - summer log -
2013s-10 -
Returned to push Coral Rift Passage through 3 squeezes to decorated chamber "Wish You Were Here". L=118m 13-07
July 27th - summer log -
2013s-15 -
Resurvey + new material off p20 below the high level traverse. 13-11
July 28th - summer log -
2013s-14 -
Cave rigged to Mega Bat and the "drop zone"
July 29th - summer log -
2013s-16;
2013s-17 -
(1) Various bits looked at.
(2) Aven part climbed "French Aven"
July 31st - summer log -
2013s-24 -
Aven climb finished 15m. Total = 35m
August 1st - summer log -
2013s-29 -
Mega Bat extended part way down into large passage heading ~ east.
L=96m Batch 13-12
August 2nd - summer log -
2013s-34;
2013s-35 -
(1) Continue extension back towards slope coming down from entrance. Batch 14 and 13 178m + 48m
(2) tourist trip
August 4th - summer log -
2013s-42;
2013s-43 -
Extension to Mega Bat extension. (Not surveyed). Photos.
August 6th - summer log -
2013s-50 -
Excavation @ base of entrance slope to try for connection through.
August 9th - summer log -
2013s-66 -
De-rig. Nuts on through-bolts removed.
TL=2739m (needs checking by AN)
TL=2256+475 = 2731m
2015
April 4th - Easter log -
2015e-17;
2015e-18 -
p10 dropped beyond Pee Pee Chamber. 1.5m is draughting dig. Snappers needed to progress.
2019
April 18th - Easter log -
2019e-58 -
photography
August 17th - summer log -
2019s-45 -
1.5 hours to find entrance. Photo trip but no card in camera. Visited helictites.
August 21st - summer log -
2019s-51 -
Assistance given to Wessex CC.
Stretcher and man-power to get Malcolm Foyle from entrance top to helicopter 112. He'd fallen on the entrance pitch.
August 28th - summer log -
2019s-59
2023
November 6th - autumn log -
2023a-11 -
Part exploration
November 7th - autumn log -
2023a-17 -
photography
2025
February 10th - Xmas- New Year log -
2024c-31
Published documents: print and digital
• [E]
Ullastre-Martorell J, 1975 Aportacion al conocimiento morfokarstica de la depresion de Matienzo (Santander) Cuadernos de Espeleología Vol. 8
• pp82-86 - Account + survey
• [P2]
Smith P, 1981b Grupo de Espeleologia de Matienzo J. Manchester University Speleological Society No. 10
• p12 - Survey
• [DF]
Cawthorne R, 1993 Matienzo 1993 Plymouth Caving Group Newsletter and Journal, No. 119, Winter 93- 94
• p11
• [BZ]
Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
Summary and area map + photos. Covers.
• [CS]
Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
• p11 - Length only reported. On area map
• [DG]
Neill A, 1994 Matienzo '94 (Part 1) Plymouth Caving Group Newsletter and Journal, No. 122, Nov 94
• p13
• [CU]
Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p67 - Summary and on map
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • p448 - Summary & exploration history to 1996
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p17 - summary
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p11 - photography helictites
• p12 - mention re "1894" (should be 1984?)
• [FO]
cantasub2010-vol1.pdf and
cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2 • p489 - On Cuibija System line survey and section
• p514 - History; description; line survey + section; photo• p545
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p10 - summary length
• p12 - summary length