1989
July 23rd - summer log -
1989s-03;
1989s-04 -
Initial explorations.
July 24th - summer log -
1989s-04;
1989s-05 -
Extensions - antlers and bones found
July 25th - summer log -
1989s-06 -
Extensions
July 26th - summer log -
1989s-06;
1989s-07;
1989s-07 -
Extensions
July 27th - summer log -
1989s-10 -
Extensions + suvrey off Swirl Chamber
July 28th - summer log -
1989s-12;
1989s-16 -
p25m rigged. 40m shaft descended.
Walk to find "back door". Smoke test.
Other holes looked at. Sketch.
Big passage found from Swirlpool Chamber.
July 29th - summer log -
1989s-16;
1989s-18;
1989s-27;
1989s-29 -
(1) Resurvey Road to Nowhere. Leads looked at near Swilpool Chamber. Main choke near stn 25 will go with 5min lump hammering
(2)Push passages near Swirlpool Chamber.
(3)Haymarket account later on 800m surveyed.
July 30th - summer log -
1989s-22;
1989s-28;
1989s-29 -
(1) Return to holes found 28/7. One pushed to L=20m. Other draughting holes need digging.
(2) Walk found pot SCD2014
(3) Haymarket back to Corkscrew Passage into streamway + later.
(4) Photographic trip on high level.
July 31st - summer log -
1989s-30;
1989s-83 -
Small extension
January 1st - summer log -
1989s-43
August 1st - summer log -
1989s-38;
1989s-58 -
Haymarket produce 1km loop. Pushed to top of streamway DDecker pitch. Also climbs above 2nd pitch. Big light to Swirl Chamber.
August 2nd - summer log -
1989s-84 -
Entrance squeeze dig
August 3rd - summer log -
1989s-46;
1989s-48;
1989s-49;
1989s-53;
1989s-61 -
(1) Tidying rigging. Looked at pot and choke. Streamway pushed.
(2) Streamway push
(3) Dug out squeeze. Other bits looked at in the entrance.
(4) (Later) Bolt drill to climb above 1st chamber after ladder climb + above 4th pitch
August 5th - summer log -
1989s-63;
1989s-64;
1989s-69;
1989s-70;
1989s-71 -
(1) Downstream end of Vallina description. Howling gale at dig.
(2) Spanish archaeologists taken down to see pot.
August 7th - summer log -
1989s-74 -
Lost Pot entrance dug out and through trip made.
August 8th - summer log -
1989s-76 -
(1) Detackled upwards.
(2) Dye tests @ Molino + Comellante + Reñada sump NEGATIVE
August 13th - summer log -
1989s-98 -
Surveyed 60m near bottom entrance. Investigated terminal choke.
August 17th - summer log -
1989s-A1;
1989s-A2 -
Bottom entrance seems to have slumped.
1991
August 13th - summer log -
1991s-58 -
Phillippe from Tortosa group tells JC of extensions. Permission to video in top level.
August 17th - summer log -
1991s-75 -
Video top level.
1993
August 7th - summer log -
1993s-47;
1993s-48 -
Joint Spanish-English trip. Sump dived. Boulder dig worthwhile continuing.
August 10th - summer log -
1993s-60;
1993s-63 -
(i) Bolt aven upstream. Still going.
(ii) Boulders removed at downstream draughting boulder choke. Still going.
New bit surveyed.
August 17th - summer log -
1993s-73;
1993s-74 -
Extended through choke into chamber with going leads. Not surveyed.
TL=9741m
1994
August 8th - summer log -
1994s-38 -
New extension entered. Upstream surveyed for 1405m incl side bits. Stopped at climb.
TL=11146m
August 10th - summer log -
1994s-40;
1994s-41;
1994s-44 -
Continuing upstream with side passages. 1817m surveyed
TL=12963m
August 12th - summer log -
1994s-47;
1994s-48 -
Continuing upstream with side passages. High level.
1334m surveyed. TL=14297m
August 14th - summer log -
1994s-46 -
With 5 Tortosa:
Inlet passage near choke - Toc Passage 757m surveyed.
Another 1km entered?
August 16th - summer log -
1994s-48;
1994s-50 -
2 teams Carlos Adolfo + English
522m + 648m surveyed = 1170m
TL=16731m
500m high level entered by Tortosa but not surveyed.
1995
January 1st - Whit log -
1995w-11
May 28th - Whit log -
1995w-06;
1995w-07 -
Surveyed in Boxhead Traverse.
TL=17946m (with usual omissions)
July 31st - summer log -
1995s-37;
1995s-38 -
Extensions upstream
TL=17946+521=18467m
August 2nd - summer log -
1995s-36;
1995s-38;
1995s-39 -
Photographs and sediment from upper level
Extensions around Nova dome 626m
TL=19093m
August 14th - summer log -
1995s-91 -
(1) Catalan exploration.
(2) Abyss Passage extensions.
August 16th - summer log -
1995s-A1;
1995s-A2 -
Catalan explorations + Brit.
August 21st - summer log -
1995s-A3
1996
April 5th - Easter log -
1996e-08 -
Photos. Survey new passage off Road to Nowhere.
New 67.2+107.3+75.7 + 74.1 = 324.3
TL=24415m
July 27th - summer log -
1996s-03 -
Extension in maze 38m
TL=24453m
August 2nd - summer log -
1996s-10
August 7th - summer log -
1996s-19;
1996s-19 -
(i) Pitch dropped into Haymarket Series. Length = 81.5m
(ii) Tied in 2/8/96
Looked at upstream sump area.
Length=142+229
TL=24453+82+371 = 24906m
August 12th - summer log -
1996s-29 -
R. Skorupka dive in upstream Rio Rioja.
Sump 1 22m gallery 60m
Sump 2 47m Gallery 200m
Sump 3 ?
Total surveyed 285m. Very promising lead.
TL=25191m
1997
April 6th - Easter log -
1997e-10
July 27th - summer log -
1997s-05;
1997s-07 -
(1) Canyon sump passage extension.
(2) Other trip?
August 10th - summer log -
1997s-50 -
Hale Bopp extending
TL=25360+36+201+129 = 25726m
Catalans bolted up end of Toc to tiny inlet.
Stranded + Hale Bopp Extension.
August 11th - summer log -
1997s-50 -
Overdue Catalans stranded by rope not being at base of pitch. Out @ 8pm
August 12th - summer log -
1997s-53 -
Extended around Vallina 1/2 boulder area. No survey.
1998
April 7th - Easter log -
1998e-02;
1998e-03 -
8 people in transporting bottles for upstream dive.
April 8th - Easter log -
1998e-06 -
Dived upstream.Found main way on in simp 2.
April 11th - Easter log -
1998e-15 -
Maze shaft descended. Not surveyed.
April 13th - Easter log -
1998e-24 -
Dive gear recovered in wet weather.
Dive surveyed -
sump 3 50m
sump 2 50m in "side" passage
TL=25726 + 100 = 25826m
August 11th - summer log -
1998s-28;
1998s-30 -
Catalans not in Matienzo
(1) Rope climb series off Toc Gallery explored and surveyed
TL=25826+162 = 25988m
(2) Same trip. Further investigation around New York Gallery.
August 22nd - summer log -
1998s-38 -
Catalans looking at climb in maze area.
August 24th - summer log -
1998s-38 -
Resistance Gallery - 15m climb into inlet passage at point A on VT100 survey.
66mk explored.
TL=25988+66 = 26054m
1999
August 11th - summer log -
1999s-34 -
Passage and pitches explored off 600ptas Passage.
Survey data with Ali
(Length = 193m surveyed but already in length.
2000
April 18th - Easter log -
2000e-05 -
(1) Carry to upstream sump.
(2) Pushed side passage of 600ptas passage. No go.
(3) Possible wrong passage station joined in near entrance.
April 19th - Easter log -
2000e-06 -
Martin Holroyd dived in upstream sump.
100m found (Northern branch)
Cave TL = 26054+ 100 = 26164m
April 21st - Easter log -
2000e-14;
2000e-16 -
Another dive by MH. L=130m
TL= 26154 + 130 = 26284m
2001
April 14th - Easter log -
2001e-24;
2001e-25;
2001e-26;
2001e-27 -
Dive upstream M Holroyd L=200m
TL=26484m
Overdue "rescue"
April 17th - Easter log -
2001e-45 -
(1) Boulder choke (300m E of Swirl Chamber) looked at. Long term dig.
(2) "Climb on Big Junction" series near Swirl Chamber. L=192.1
TL=26676m
January 1st - Whit log -
2001w-04
May 31st - Whit log -
2001w-03 -
Photo trip.
August 17th - summer log -
2001s-41;
2001s-42 -
Extensions @ Who Knows Where Chamber.
Other bits surveyed but done before and not drawn up.
2002
February 26th - February log -
2002f-01
March 2nd - February log -
2002f-05
March 4th - February log -
2002f-03
March 29th - Easter log -
2002e-10;
2002e-13;
2002e-22;
2002e-23;
2002e-24 -
(1) 22 sherpas carry Martin Holtroyd gear to downstream sump. Through to sump 5 with ~500m of above water passage.
(2) Resurvey Ali's passage start and surrounding passage. Junction is shown at wrong station. (3) "Refound"? the way in to lower level passages. Passages here need surveying.
TL=26676 + 643.5 =27320m
March 31st - Easter log -
2002e-19;
2002e-24;
2002e-25 -
Breakthrough Chamber extension 95.7m
TL=27415m
April 2nd - Easter log -
2002e-25;
2002e-26;
2002e-26;
2002e-27 -
(1)Shit Inlet at base of DD pitch L=25.3
Total = 27440m
(2) Secret Series L = 215.7m
TL=27656 d=176m (234m alt.)
April 5th - Easter log -
2002e-32
January 1st - summer log -
2002s-35
August 11th - summer log -
2002s-29 -
Who Knows Area extension (+William's Easter)
L=148+91
TL=27717+238+148+91 = 28194m
August 12th - summer log -
2002s-30
August 15th - summer log -
2002s-28;
2002s-29 -
(1) Alberts Grand Passage 113m surveyed.TL=28307m
(2) More in Who Knows Series. Tying up loose ends.
10m p still to descend.
L=97 TL=28404m
August 17th - summer log -
2002s-31 -
(1)Skyhook Passage explored L=180
TL=28584m
(2) Catalans 21.4m TL=28605
(Note: Pitch down to known passage surveyed by Catalans but notes with them.)
August 19th - summer log -
2002s-32 -
Secret Area 48m surveyed
TL=28653m
August 21st - summer log -
2002s-33 -
Extensions around entrance passage 335m
TL=28988m
October 10th - autumn log -
2002a-05
October 20th - autumn log -
2002a-01
November 9th - February log -
2003f-04
November 18th - autumn log -
2002a-04
December 28th - Xmas - New Year log -
2002c-02 -
Video trip into Swirl Chamber and around.
2003
January 1st - Xmas - New Year log -
2002c-05
April 16th - Easter log -
2003e-07;
2003e-09 -
Bits surveyed. 154.5m
TL=29143m
April 17th - Easter log -
2003e-09;
2003e-10 -
Extensions around the p from upper series 121m
TL=29264m
April 18th - Easter log -
2003e-10 -
Extensions around 3rd p 187m
TL=29451m
July 30th - summer log -
2003s-10
August 1st - summer log -
2003s-13 -
Extensions down end of Chunnel and at start. 97.4m + 26.2m
TL=30217.6m
August 5th - summer log -
2003s-19;
2003s-19 -
(1) Photo trip top to bottom entrance.
(2) Tie in November Passage + Catalan's climb 35.9
(3) Survey off Pita Passage 32.9m
August 8th - summer log -
2003s-21;
2003s-21 -
(1) Various extensions - passage opposite Hole in the Wall
L=221.1 TL=30633.1
(2) Continue bolting around pitch.
August 10th - summer log -
2003s-27;
2003s-27 -
(1) Ladder Bypass 41.5m
TL=30674.6
(2) Maze and Shatter Passage L=230.3m
(TL=30904.9 - 122)
August 11th - summer log -
2003s-28;
2003s-28 -
(1) Catalans Climb 80m
(2) Vallina 2 - Near 1st Abyss 187.5
(3) Catalans gave up on bolt around pitch
TL= (31172.4 - 122) = 31050.4m
August 13th - summer log -
2003s-30 -
Maze Area survey 8.5m new
TL=31058.9m
August 14th - summer log -
2003s-35 -
Catalans trip
August 15th - summer log -
2003s-39;
2003s-40;
2003s-43 -
(1) Top to bottom through trip.
(2) Martin Holroyd 110m downstream dive.
TL=31168.9m
August 16th - summer log -
2003s-44 -
Bolt around "Phil's Pitch" at end of Alberts Passage. Into crawl, passage, then much bigger to pitch.
No survey yet.
August 19th - summer log -
2003s-49 -
Photos in November Passage (Pedro's Rift)
January 1st - autumn log -
2003a-05
November 9th - autumn log -
2003a-04;
2003a-06;
2003a-06
December 31st - Xmas - New Year log -
2003c-03 -
Through trip. Left cave detackled.
2004
April 4th - Easter log -
2004e-02 -
tourist trip
April 6th - Easter log -
2004e-06 -
L'Emperat extensions and survey. 378.5
Length = 31168.9 + 378.5 = 31547.4m
April 7th - Easter log -
2004e-13 -
tourist trip
April 9th - Easter log -
2004e-20;
2004e-20 -
Tits Up Passage off Shatter Passage * See later
L=76.2m TL=31623.6m
April 10th - Easter log -
2004e-30 -
Shatter Passage L=60.5 (Centipede)
TL=31684.1m
April 13th - Easter log -
2004e-31;
2004e-36 -
(1) Maze area surveyed L=141.2
(2) Bolt climb at end of FN passage?
TL=31684.1 +423.6 = 32107.7m
January 1st - Whit log -
2004w-05
January 1st - summer log -
2004s-16;
2004s-18
July 27th - summer log -
2004s-19
July 28th - summer log -
2004s-15;
2004s-19 -
Flintstone extension. Batch 173 L=168.7
TL=32413.7m
July 29th - summer log -
2004s-15 -
Traverse line installed
Cañon continues about 50m to pitch / traverse.
July 31st - summer log -
2004s-20 -
Cañon descended - now needs traverse. L=91
TL=32504.7m
January 1st - summer log -
2004s-35
August 11th - summer log -
2004s-36 -
Galería de Germán 203.7m surveyed.
TL=32512 (from Ali)
August 12th - summer log -
2004s-37 -
tourist trip - top to bottom
August 15th - summer log -
2004s-39 -
Bits near Swirl Chamber (63m)
TL=32575m
August 16th - summer log -
2004s-36
October 25th - autumn log -
2004a-06 -
Push at end of Galería de Germán L=207.5m Batch 179
October 26th - autumn log -
2004a-10
October 27th - autumn log -
2004a-07 -
Off Swirl Chamber Batch 180 L171.6
TL=32954m
October 30th - autumn log -
2004a-11
December 30th - Xmas - New Year log -
2004c-07
2005
January 1st - Easter log -
2005e-01
January 1st - summer log -
2005s-42
August 14th - summer log -
2005s-29;
2005s-31;
2005s-33
2006
April 11th - Easter log -
2006e-33 -
Birds World upper levels explored L 317.8m Batch 182
TL=318 + 32954 = 33272m
April 17th - Easter log -
2006e-33 -
Birds World upper levels explored Batches 183 + 184
TL=341+33272 = 33613m
April 18th - Easter log -
2006e-35
July 30th - summer log -
2006s-06 -
Checking details in Rio Rioja. Nothing new.
August 2nd - summer log -
2006s-16 -
Man Trap explored + partly surveyed. 66.4m (Not tied into main survey.)
TL=33613+66.4 = 33679.4m
August 8th - summer log -
2006s-35 -
Survey of Catalan Passages (Man Trap)
759.3 in total. Batches 186, 187, 188
(Already included in length) Ali to adjust length.
August 10th - summer log -
2006s-34;
2006s-35 -
Vallina 2 trip
(1) Tocadome 75m+ Disto
(2) Kingsdale Passage extended; continues.
Batches 189, 190 L=119.2
TL=33798.6m
NEW, ADJUSTED LENGTH of VALLINA is 31050m
2007
January 1st - February log -
2007f-03
January 1st - summer log -
2007s-62;
2007s-63
August 1st - summer log -
2007s-10 -
Brid's World entered via bold step. Rigged.
August 14th - summer log -
2007s-57 -
Corner Crawl and Maze surveyed.
L=110.2m Batches 191 + 192
TL 31201 (newly calculated)
2008
January 1st - Easter log -
2008e-00
March 22nd - Easter log -
2008e-21 -
Surveyed passage new Clapham Bypass. Batch 193. 96m surveyed.
TL=31297m
March 23rd - Easter log -
2008e-46 -
Heavy driving snow - aborted trip.
March 24th - Easter log -
2008e-46;
2008e-47 -
Bolted aven - then left for trip on 25/3/08
March 25th - Easter log -
2008e-39;
2008e-47 -
Smelly Hat Aven that connects to Danish aven climb.
Batch 194 26m; 195 resurvey on 24/3/08 42.1m
196 207m = 275m
TL=31572m
August 11th - summer log -
2008s-71;
2008s-72;
2008s-73 -
Batch 197 82m surveyed
TL=31654m
August 14th - summer log -
2008s-78 -
To passage off Elephant's Passage - Needs ladder.
2009
April 13th - Easter log -
2009e-42
August 1st - summer log -
2009s-28 -
Aven in Rio Rioja looked at. Crawlpushed - still a dig.
2011
July 25th - summer log -
2011s-16
August 10th - summer log -
2011s-45;
2011s-49;
2011s-50 -
Choke to east of Swirl Chamber investigated. Much to do.
October 9th - autumn log -
2011a-03
2012
February 9th - Jan-Feb log -
2012jf-03;
2012jf-04
April 7th - Easter log -
2012e-37
August 1st - summer log -
2012s-27 -
tourist trip to Swirl Chamber.
undescended pitch needs checking on RH side before choke.
August 2nd - summer log -
2012s-30 -
Small extension off passage to Swirl Chamber
Batch 198
TL=40+31654 = 31694m
August 6th - summer log -
2012s-36;
2012s-37;
2013s-02 -
Batch 200. 48m surveyed (up Novadone Disto)
TL=31694+48 = 31742m
Other pieces looked. Muddy Waters duck passed.
End of Rio Blanco - narrow rift.
November 16th - autumn log -
2012a-09
November 30th - Easter log -
2013e-02
2013
February 28th - Easter log -
2013e-15
March 27th - Easter log -
2013e-21;
2013e-35 -
Choke at end Bathtub Passage investigated. Some progress made? (2 accounts)
March 31st - Easter log -
2013e-16 -
route familiarisation trip.
March 31st - Easter log -
2013e-23
April 1st - Easter log -
2013e-36 -
tourist trip
July 29th - summer log -
2013s-17 -
tophotosurist trip
August 5th - summer log -
2013s-46;
2013s-47 -
Aven and pitch dropped in the passage running north of 'Bathtub Pass.'
2015
February 12th - Jan-Feb log -
2015jf-02;
2015jf-03
April 2nd - Easter log -
2015e-10 -
(1) OBA into sump downstream.
(2) Resurvey with LRUD from Big Jn to Double Dutch pitch.
Also look at choke at end of main passage.
April 3rd - Easter log -
2015e-15;
2015e-18 -
Tourist trip. Top to bottom entrance. (2 log book accounts)
April 8th - Easter log -
2015e-29
August 4th - summer log -
2015s-23 -
tourist trip
August 9th - summer log -
2015s-41;
2015s-42 -
Snappered bouldery connection trhough to Vallina II.
Found passage off 1st sump bypass in Rio Rioja. Sketch
October 13th - autumn log -
2015a-04;
2015a-07 -
RS diving gear in to top of DD pitch.
Bolts and rope installed on climb up from FN Passage and down slope on other side.
October 14th - autumn log -
2015a-07
October 15th - autumn log -
2015a-04;
2015a-07 -
Surveyed 217m in new passage above the sump bypass in downstream Rio Rioja.
Rift passage formed on joints/faults. Continues…
October 16th - autumn log -
2015a-07
October 17th - autumn log -
2015a-05;
2015a-07 -
Three teams
(1) Rupert dive gear to sump 1.
(2) Pushed and surveyed passage found 15/10.
272m surveyed.
(3) Other nearby series
227m surveyed. Open leads.
TL=31742+217+499 = 32458m
October 18th - autumn log -
2015a-07
October 19th - autumn log -
2015a-07
October 20th - autumn log -
2015a-07
October 21st - autumn log -
2015a-07
2016
March 28th - Easter log -
2016e-26 -
Batch 16-01 143m new. Upstream at base of pitch to Rio Rioja extended.
March 30th - Easter log -
2016e-30;
2016e-30;
2016e-30;
2016e-31;
2016e-31;
2016e-31;
2016e-33;
2016e-33;
2016e-33 -
Surface survey from both entrances to possible visible points.
March 31st - Easter log -
2016e-33;
2016e-36 -
Checked "fixed locations" on track above top entrance and resurveyed top entrance chamber.
Tpp ent @ 0450017 4792407 ^412
April 2nd - Easter log -
2016e-42;
2016e-42;
2016e-44;
2016e-44 -
Over traverse. Passage has draught 4 - 5m wide 0.5m high. Ends at dig. Branch ends over stream between sumps 5+6.
April 8th - Easter log -
2016e-56 -
Survey probs.
April 13th - Easter log -
2016e-55;
2016e-56 -
(1) Account of passage above stream (partial)
(2) Vallina survey as separate files.
June 30th - summer log -
2016s-10;
2016s-11
July 2nd - summer log -
2016s-11
July 13th - summer log -
2016s-03 -
Gear carry and familiarisation.
July 16th - summer log -
2016s-06 -
Dive equipment in and familiarisation
July 17th - summer log -
2016s-02;
2016s-05;
2016s-11 -
Tyrolean rigged across Canyon
July 19th - summer log -
2016s-06 -
Equipment to base of 30m for upstream dive. Pitch rope changed.
July 20th - summer log -
2016s-07 -
More kit in. Dive called off.
July 21st - summer log -
2016s-07 -
Dive upstream in known passage.
July 23rd - summer log -
2016s-08 -
Bottle carrying in. J Lister dived beyond Martin Holroyd limit.
70m of line laid over stable gravel slopes. Ends 570m from start of sump 2 in 7x4m passage continuing down for 12m to another arch with black void beyond.
July 24th - summer log -
2016s-08 -
Bag and bottle transporting - JL
July 25th - summer log -
2016s-12 -
Equipment carried in RS. Tidy line in sump 5.
July 27th - summer log -
2016s-16;
2016s-16 -
(1) Downstream - cylinder out.
(2) 3 cylinders out from the Canyon.
July 28th - summer log -
2016s-22 -
Downstream. Lines tidy. Streamway "massive".
July 30th - summer log -
2016s-23 -
Bottle in for downstream.
August 1st - summer log -
2016s-25 -
Downstream. Water up 2 - 3". Didn't dive.
August 2nd - summer log -
2016s-27;
2016s-28;
2016s-28 -
(1) Dive and carry sump 5 to 6.
(2) Resurvey 5 to 6
(3) Ladder down into stream.
(4) Push high level above sumps.
Batch 0733-16-06 L=144m
August 4th - summer log -
2016s-33 -
Looking at sump bypass.
August 6th - summer log -
2016s-36 -
Transporting equipment through high leve.l
August 7th - summer log -
2016s-38 -
Survey? Batch "16-7" + "16-8"
Not con computer?
August 12th - summer log -
2016s-46;
2016s-47 -
Rioja Reserva - checking out possible bolt climbs. All look good. Best is above the end choke where water wells up under wall
~10m bolt route.
Other routes spotted at confluence.
Looked at Rioja Reserva.Also sumps bypass passage.
September 7th - summer log -
2016s-59 -
Ron's cave phone tried out in and over the top entrance.
October 17th - autumn log -
2016a-01 -
Sump 1 area + chamber above surveyed but not tied into a survey point.
16-09 99.3m
October 19th - autumn log -
2016a-01 -
16-10 + 16-11 ? L=36.6+22.49
October 21st - autumn log -
2016a-01 -
Down to Martin Holroyd inlet.
Batch 16-12 l=231.3m
TL=33329+390 = 33719m
October 24th - autumn log -
2016a-01
2017
April 10th - Easter log -
2017e-11 -
Rupert Skorupka working in sump 6.
April 11th - Easter log -
2017e-09;
2017e-09;
2017e-11;
2017e-11 -
Bolting 10m above the stream
Lots of SWCC cavers in the system.
April 12th - Easter log -
2017e-12 -
Rupert Skorupka working in sump 6.
April 13th - Easter log -
2017e-12 -
Rupert Skorupka working in sump 6. Vis. becomes bad.
SWCC in system (Without permit)
April 14th - Easter log -
2017e-12;
2017e-13;
2017e-14;
2017e-21
April 15th - Easter log -
2017e-25 -
Note (text) from RS re line condition in sump 6 as MH's survey line may be wrong.
+ another account in the log book
June 7th - summer log -
2017s-01 -
(1) Notes re diving callout
(2) Notes re survey + dive survey including M Holroyd survey.
July 15th - summer log -
2017s-02 -
Side passage investigation. "Galería Jesús Lecue" entered. 30m explored.
July 20th - summer log -
2017s-02 -
Continue exploration. Survey and photo. Ends at 2 pitches need exploring.
Galería Jesús Lecue batch 17-01 L=85.9m
TL=33719+86=33805m
Also small passage open up which immediately choked. (See log book X)
July 24th - summer log -
2017s-04 -
Rupert Skorupka dives accounts
4-5th Aug Gear into upstream sumps
6th West sump chokes
7/8/17 Sump 3 passed
August 4th - summer log -
2017s-44
August 5th - summer log -
2017s-44
August 6th - summer log -
2017s-44
August 7th - summer log -
2017s-33;
2017s-44;
2017s-45 -
Aven climbed @ end of Rio Rioja Reserva. Has already been bolted. Closes in.
August 8th - summer log -
2017s-37;
2017s-45 -
Jim Lister and Mark Smithdive through sumps 3, 4, 5 to reach and survey 403m.
Batch 17-02 "ending" in large chambers.
Rises up about 100m above sump level.
TL=33805+403 = 34208m
*Note 180m leg on Survex is a guess. Needs survey and including in length
August 10th - summer log -
2017s-45
August 11th - summer log -
2017s-40;
2017s-45 -
Small extensions. Batches 17-03+17-04 L=26m
TL=26+34208=34234m
August 27th - summer log -
2017s-54 -
SubPhone test under Smelly Hat Aven.
On surface near Torca Rotura, rain stopped any fixes after weak voice connection.
September 30th - autumn log -
2017a-01
2018
January 31st - Jan-Feb log -
2018jf-02
February 27th - Jan-Feb log -
2018jf-14
April 5th - Easter log -
2018e-38;
2018e-39;
2018e-40 -
Galería de Cisterna. Pitches explored.
April 7th - Easter log -
2018e-48;
2018e-49 -
Batch 18-01 L=167.7m
TL=168+34234 = 34402m
April 19th - Easter log -
2018e-78;
2018e-79
April 20th - Easter log -
2018e-78;
2018e-79
April 21st - Easter log -
2018e-78;
2018e-79
April 22nd - Easter log -
2018e-78;
2018e-79
April 23rd - Easter log -
2018e-78;
2018e-79
April 24th - Easter log -
2018e-78;
2018e-79
April 25th - Easter log -
2018e-78;
2018e-79
April 26th - Easter log -
2018e-78;
2018e-79
April 27th - Easter log -
2018e-78;
2018e-79
April 28th - Easter log -
2018e-78;
2018e-79
April 29th - Easter log -
2018e-78;
2018e-79
July 28th - summer log -
2018s-09;
2018s-10;
2018s-11 -
Brid's Wprld area checking out possible leads.
July 29th - summer log -
2018s-16 -
Dive kit taken in to upstream sump
July 30th - summer log -
2018s-12;
2018s-12;
2018s-16;
2018s-16;
2018s-17;
2018s-17 -
Another Bird's World area beyond the Man Trap. Extension L=49m Batch 18-02
TL=34402+49=34451m
2 accounts
August 2nd - summer log -
2018s-20 -
Through sumps 6,7,8 to start of sump 9
Batch 18-09 52.4m; 18-10 81m; 18-11 24.3m 18-12 37.4m
L=195.1m
TL=34837+195.1 = 35032m
August 3rd - summer log -
2018s-21
October 29th - autumn log -
2018a-09;
2018a-10
November 13th - autumn log -
2018a-10 -
Aerial photos and panoramas over Vallina.
2019
March 31st - Easter log -
2019e-17 -
Dive equipment in.
April 2nd - Easter log -
2019e-17 -
Dive equipment in. Sumps clear
April 4th - Easter log -
2019e-17 -
Diving not to be done as there was rian and snow. Changed to climbing.
April 5th - Easter log -
2019e-17 -
Rupert climbing from base of DD.
April 6th - Easter log -
2019e-17 -
More dive equipment in.
April 7th - Easter log -
2019e-17 -
Climb petered out.
April 9th - Easter log -
2019e-17 -
Traversed to possible passage.
April 16th - Easter log -
2019e-19 -
"Poke around dangerous chamber"
Check out Swirl Chamber + Zona Blanca
April 23rd - Easter log -
2019e-42 -
Zona Blanca area ? Bird's World investigation.
Surveyed 73m Batch 19-01
TL = 35032+73 = 35105m
May 30th - Whit log -
2019w-01 -
Rio Rioja up. Another look at chamber above DD pitch. Rupert.
May 31st - Whit log -
2019w-01 -
Chamber joins down to DD pitch. Derigged this area.
June 1st - Whit log -
2019w-01 -
Some re-rigging up into Jochen's Aven. "Promising passage noted".
June 2nd - Whit log -
2019w-01 -
Far end of Dogs Dinner part 2.
Started bolt around 80m pitch
June 3rd - Whit log -
2019w-01;
2019w-02 -
At end of traverse passage closes in.
June 4th - Whit log -
2019w-02 -
Started down big 80m pitch. Big. Good stal. To be continued.
June 30th - summer log -
2019s-16
July 27th - summer log -
2019s-05;
2019s-06 -
Zarco's Aven surveyed to part way down "80m pitch"<HR>
L=97m Batch 19-02
TL=35105=97 = 35212m
August 5th - summer log -
2019s-20;
2019s-21 -
Zarco's pitch survey finished. Pushed down into too tight about 4m above main water level.
Survey batch contains data from 27/7/19
TL=35105+196 = 35301m
August 20th - summer log -
2019s-49 -
(1) Tourist trip to Swirl Chamber
(2) Also investigate p8 in Gal.J.Lecue
p9 into big passage?
August 21st - summer log -
2019s-51;
2019s-61 -
Carry for drysuit + gear (RS) + PP + PS
August 22nd - summer log -
2019s-61
August 23rd - summer log -
2019s-61
August 24th - summer log -
2019s-61
August 25th - summer log -
2019s-61
August 26th - summer log -
2019s-61
August 27th - summer log -
2019s-61
August 28th - summer log -
2019s-61
August 29th - summer log -
2019s-61
2020
October 21st - autumn log -
2020a-11
October 24th - autumn log -
2020a-13
2021
June 10th - Spring log -
2021w-06 -
Plans for the summer showed by the Tortosa cavers.
June 26th - summer log -
2021s-01 -
More downstream dive preparation.
August 2nd - summer log -
2021s-19;
2021s-20 -
Diving report after theft of SRT equipment.
August 13th - summer log -
2021s-43
September 11th - summer log -
2021s-52
October 15th - autumn log -
2021a-05 -
Expl. around Zona Blanca. Survey batch 21-01
October 24th - autumn log -
2021a-10 -
Pitch in GJLecue. Drops 18m in 2 stages to tall rift with 2 tiny streams. Surveyed batch 21-02. Photos. L=45m
TL=45+35417 = 35462m
November 8th - autumn log -
2021a-15
November 9th - Xmas - New Year log -
2021c-01 -
Plans to surface prospect in December.
November 11th - autumn log -
2021a-16
December 29th - Xmas - New Year log -
2021c-05;
2021c-06 -
Exploration surveys from December
2022
January 9th - Jan-Feb log -
2022jf-07
February 1st - Jan-Feb log -
2022jf-06;
2022jf-07
April 5th - Easter log -
2022e-04;
2022e-05;
2022e-06 -
Galerí Blanca report + biological finds
April 14th - Easter log -
2022e-25;
2022e-26 -
Checking out the Zona Blanca region.Survey with Torben 103m
22-01 22-02
April 17th - Easter log -
2022e-33 -
Zona Blanca. Torben survey? 71m
New length = 174m
Entrance photos Guy S.
August 1st - summer log -
2022s-12 -
Vallina Project. Meander del Norte (earlier exploration)
Batch 0733-22-05 L=101m
TL=36663m
October 16th - autumn log -
2022a-08
2023
February 17th - Jan-Feb log -
2023jf-03 -
(1) Check out Rotura connection. Some pitches dropped.
(2) Bath Tub Passage choke looked at by Catalan team.
New extensions off Pita Passage.
February 19th - Jan-Feb log -
2023jf-04
April 7th - Easter log -
2023e-20;
2023e-21 -
Top > bottom through trip. Some leads looked at.
Re-write of description and a through trip summary is required.
April 8th - Easter log -
2023e-23;
2023e-28;
2023e-30;
2023e-31 -
(1) Cylinders in for upstream push.
(2) Bolted up at "high level continues" ~ 200m of passage entered. Not surveyed.
April 10th - Easter log -
2023e-32;
2023e-34;
2023e-39 -
(1) Zona Blanca. Short sectionof walking passage to 10m aven.
(2) Gypsum Paradise entered halfway along Galería Vallina (Sunday Stomps)
Bat droppings and gypsum.
L=40m Batch 23-02
Drawn survey 11 pages on from text.
April 11th - Easter log -
2023e-40;
2023e-41;
2023e-42;
2023e-43;
2023e-45 -
Down pitches in high level extension.
Survey batch 23-03 192m
June 11th - summer log -
2023s-01 -
emails with Vicente re survey.
June 13th - summer log -
2023s-02;
2023s-03 -
emails with Vicente re survey + explorastion
August 10th - summer log -
2023s-42 -
Pitch back into known passage. Rock dropped to be later found "half way to exit". No survey.
August 12th - summer log -
2023s-53;
2023s-54 -
Exploring pits. Ran out of rope. Where? No survey
2024
February 10th - Jan-Feb log -
2024jf-06
February 16th - Jan-Feb log -
2024jf-07 -
Exploratrion journal for 2023 received from Vicente. About 1.5km explored? Also videos + photo of Novadome and Tocadome (via WhatsApp)
February 18th - Easter log -
2024e-01 -
Marc Martinez will be Catalan expeditions coordinator.
March 8th - Easter log -
2024e-04;
2024e-05 -
Novadome survey received. More detail required to tie in.
March 15th - Easter log -
2024e-07 -
Details and sketches received.
Batch 24-01 Novadome l=470m
March 20th - Easter log -
2024e-08;
2024e-09 -
Batch 24-02 Crystal River L=244m
Batch 24-03 Abyss L=189m
TL = 38361m
March 28th - Easter log -
2024e-15;
2024e-16 -
Try to link Shatter and Dangerous Chambers. Failed. (accounts)
March 31st - Easter log -
2024e-27;
2024e-39 -
(1) Tourist trip
(2) Batches 24-04 L=33m; 24-05 L=56m
around Dangerous Chamber and passage N of Clapham Bypass.
TL=38450m
See later account page 43.
April 7th - Easter log -
2024e-39 -
Photo trip to Swirl Chamber.
July 12th - summer log -
2024s-06 -
Carry equipment to streamway for Rupert.
July 31st - summer log -
2024s-23 -
From the Catalans: Extended Bath Tub Passage into chamber with small- debris roof.
August 3rd - summer log -
2024s-32;
2024s-33 -
Bolting up W of Ha! Aven
August 6th - summer log -
2024s-41;
2024s-42;
2024s-43;
2024s-44;
2024s-45;
2024s-46 -
Bolting up W of Ha! Aven
August 7th - summer log -
2024s-41;
2024s-41;
2024s-42;
2024s-42;
2024s-43;
2024s-43;
2024s-44;
2024s-44;
2024s-45;
2024s-45;
2024s-46;
2024s-46;
2024s-47;
2024s-47;
2024s-48;
2024s-48 -
Bolting up W of Ha! Aven. Into about 30m sandy crawl which can be excavated into continuation.
Large chamber can be seen on opposite side of pitch head.
August 9th - summer log -
2024s-64
August 10th - summer log -
2024s-67 -
Up aven explore crawl @ top past "Fauna's Cake"
August 12th - summer log -
2024s-67 -
Survey. Issues. Batch 24-06 24-07 Far Left Passage
August 17th - summer log -
2024s-75 -
Media downloaded
October 25th - autumn log -
2024a-26 -
Trip to bring out last of Rupert's dive gear. It had been washed away in a previous flood.
December 5th - Xmas- New Year log -
2024c-01
2025
April 7th - Easter log -
2025e-02 -
Trip to Swirl Chamber.
45 minutes out.
April 9th - Easter log -
2025e-03;
2025e-04 -
(1) At Canyon various loops looked at.
(2) Boulder choke. Where?
(3) Man Trap. Didn't get in - gear required.
April 12th - Easter log -
2025e-07 -
Leads around Man Trap. Survey additions - see log book.
Batch 0733-25-01 L=28.5m
April 26th - Easter log -
2025e-60 -
Jim and Mark dive upstream
Lam Chamber L=48m 25-02
Side Passage L=98m 25-03
April 27th - Easter log -
2025e-60
April 28th - Easter log -
2025e-60 -
Look at sump below tyrolean. Too tight and knobbly.
38591+175 = 38766m
July 21st - summer log -
2025s-03;
2025s-04 -
(1) Diving downstream now stopped by RS.
(2) Jochen's Aven climbed to where it closes in.
(3) 3 good leads at top of Zarco's
Need to check why Jochen's Aven is floating on survey.
July 27th - summer log -
2025s-11 -
Bug spotting trip to upstream from DD.
July 29th - summer log -
2025s-58 -
No log book record.
August 11th - summer log -
2025s-39 -
Top entrance to high level extension.
Sophie pitch may have a way on.
August 13th - summer log -
2025s-45 -
(1) Bolted across Sophie Pitch to mud choke.
(2) Emily Pitch dropped to ledge and crawl. p10 dropped at end?
August 16th - summer log -
2025s-51 -
2 batches around the Canyon Sump area. Photos in Canyon Sump Passage.
25-04 L=42.2 25-05 L=51.1
TL=38766 +93m = 38859m
August 17th - summer log -
2025s-57 -
Exploration in Emily pitch. Sketch and descrip-tion. No survey.
New p30 down to Dragon level.
October 5th - autumn log -
2025a-02 -
Rasa data -> Survex length =1342 TL = 38859+1342 = 40201m
October 12th - autumn log -
2025a-03;
2025a-04 -
(1) Checking out areas near The Dragn and Who Knows Chamber. (Possible connection with Emily Pitch area.)
(2) Shatter Passage extension.
Batch 25-06 L=14m
TL=14+ 40201 = 40215m
October 14th - autumn log -
2025a-04;
2025a-05 -
Investigation around the Maze, Shopping Trip..
Who Knows Chamber looked at.
Resurvey started but not complete and not on the survey (25-07)
October 16th - autumn log -
2025a-05;
2025a-06 -
(1) Bolt climb started in Maze area but rusty bolts seen.
(2) Corkscrew climb (N of Hole in the Wall) at top traverse to new passage surveyed. Batch 25-08 L=44m
TL=40215+44 = 40259m
Further traverse in opposite direction needs protection. (3) Fossils found while climbing in Maze area. (Hidden away, but retrievable if required.
October 17th - autumn log -
2025a-06 -
360° photos of entrance and just inside.
December 23rd - Xmas - New Year log -
2025c-06 -
PDFs RASA survey #5135 from David via PS.
2026
March 28th - Easter log -
2026e-05 -
Birds World area beyond Man Trap. Wet; water sinks in wet weather.
March 29th - Easter log -
2026e-07 -
Explore and photo high level passage SW of Smelly Hat Aven.
March 31st - Easter log -
2026e-10 -
Biology sampling down DD pitch. Pseudoniphargus found.
April 2nd - Easter log -
2026e-11;
2026e-11;
2026e-12;
2026e-12;
2026e-13;
2026e-13;
2026e-13;
2026e-13 -
Resistance Gallery area investigated. With going leads. (Pitches and streamway) Photos.
April 5th - Easter log -
2026e-22 -
Bolted around head of Corkscrew Climb to 30m rift passage. Another section here surveyed.
Batches 26-01 and 26-02 L=47.2m
Total length 40259 + 47 = 40306m
(photos)
April 6th - Easter log -
2026e-32;
2026e-33;
2026e-34 -
Uranium Mine exploration?
Pushing in Resistance Gallery area. 12m aven on the north side of the chamber bolted. Pitch found but also old bolts. (Photos)
April 7th - Easter log -
2026e-34;
2026e-35;
2026e-36;
2026e-37;
2026e-38 -
Pushing in Resistance Gallery area. Bolted over pitch. 4 leads to look at. Survey?
AI enhanced sketches. (Photos)
April 9th - Easter log -
2026e-43;
2026e-44 -
Exploration batches 0733-26-03, -04, -05
L = 193m
TL = 193 + 40306 = 40499m
April 20th - Easter log -
2026e-49
July 21st - summer log -
2026s-02 -
1: Climbs in the 6-ways chamber area, at top of Zarcos Pitch. One good lead in poor rock better with 2 people? 2: Swirl Chamber, a steep climb up to an aven visible in the ceiling. Continues in poor rock.
July 30th - summer log -
2026s-11 -
Carry in gear to FN Junction. Survey near Man Trap needs clarifying.
August 2nd - summer log -
2026s-23 -
11m rope on p8 Man Trap (2 accounts?)
August 3rd - summer log -
2026s-23 -
Opened up pitch at base of 'Chanel Chute' near Man Trap.
August 5th - summer log -
2026s-23;
2026s-24 -
Survey disto failed. Lidar scan of area.
I Hate My Boyfriend pitch at Chanel Chute.
Lidar scan of base of Man Trap.
August 6th - summer log -
2026s-23;
2026s-23;
2026s-24;
2026s-24 -
Worked at possible connection G in Galería de la Cisterna.
August 8th - summer log -
2026s-43;
2026s-43;
2026s-70;
2026s-70 -
(1) New Catalan passage off New York Gallery. The passage, up to 40m wide, ends at a pitch with large passage continuing. Torca de la Vera Negra (Cabaña, #0036) is at the same level so that is being pushed.
(2) Catalan account of exploration. "850m"
August 9th - summer log -
2026s-33;
2026s-34 -
Capping around G spot (on survey)
August 12th - summer log -
2026s-51 -
Solo capping at "G-spot".
August 13th - summer log -
2026s-49;
2026s-49;
2026s-59;
2026s-59 -
Resistance Gallery area (from Easter). Not yet completed the bolt climb.
August 19th - summer log -
2026s-68 -
Some kit removed from G-spot dig.
August 24th - summer log -
2026s-68 -
List of Catalan Vallina files. Lengths not definitive
September 1st - summer log -
2026s-71 -
(1) Some duplicate legs in the 830m. Actual new = 716m + latest batch = 1247m total.
(2) Map showing the furthest surveyed extent of the new passage.
September 2nd - summer log -
2026s-72 -
"Definitive" lengths for summer 2026 explorations:
TL = 42945m