MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0713 Aguanaz, Fuente (top entrance)
San Antonio - 30T 0446482 4801430 Altitude: 78m - Length: 5721m Depth: 43m
Website description for site 0713   |   Site in context, area map

Extra notes from card index
• Water at altitude 60m TL=698 PL684 D=21
• About here, KIller solo dived to end of F Aguanaz and may have progressed @ boulder choke. See end of Easter log.
• L09E (no date) Photos of cavers entrance
• Guessed GR for resurgence is 446615 4801760 ~^55 from map + Google Earth
• Found positive at La Riega by PS at a later date.
• Letter writtenj + reply received from Environment (In log book)
• Dec 18 - Jan 19 Info re filming dives.
• L19E: Series of dives by Jim Lister + Mark Smith 19-01 722m 19-03 236m = 958m TL=3602+958 = 4560m
• Pete contacted authorities.
• End of summer TL=178 + 4560 = 4738m

Orphan card index date references to logbook pages
• [09/08/2001] Sump 3 dived to "quite tight close down" 5m from previous limit. Runnng water can be heard from rockfall above.
• [27/04/2006] (14) positive result Detectors removed.
• [20/07/2009] (1) Wet cave at entrance partly explored. Heading on 150°mag (2) Middle entrance explored upstream
• [10/08/2009] Inlet off old aven surveyed to hi level chamber / passage + pitch beyond. L=273[?] TL=2046m (Various parts duplicated + splays accounted for.)
• [24/07/2011] Dowsing to trace upstream route.
• [23/08/2013] New 13-01 file length now 217m TL=2416m
• [21/11/2013] Video of river in moderate flood @ San Antonio
• [30/03/2016] Negative
• [27/04/2017] Detector -ve
• [31/03/2026] Water level checked. Highest this week - so no diving.
• [03/11/2026] Updated survey received.

Dated logbook entries with card index notes

1988

August 10th - summer log - 1988s-67 - Explored; surveyd; photographed.

1989

January 1st - summer log - 1989s-00
August 6th - summer log - 1989s-71 - Push at end. Needs full diving gear. Side passage surveyed. TL=872m

1995

May 27th - Whit log - 1995w-02
May 28th - Whit log - 1995w-03; 1995w-13 - Dived by R. Skorupka. Sump 35m long, 5m deep. Surfaced in large passage still going.
July 28th - summer log - 1995s-19 - Gear taken to sump.
July 29th - summer log - 1995s-19 - Dived through and 496m surveyed to sump 2. TL=872 +496 = 1368m
August 5th - summer log - 1995s-63 - Dived through sump 2
August 7th - summer log - 1995s-63 - Surveyed extension 1368 + 323 = 1691m
August 8th - summer log - 1995s-65; 1995s-66 - Oxbows explored.

1997

March 30th - Easter log - 1997e-08

2001

April 13th - Easter log - 2001e-37 - Inlet on left after sump 2 explored up to large chamber with stream entering from the roof.
April 16th - Easter log - 2001e-38 - Sump 3 dived to air bell and down through hole but not pushed. Smaller bottles needed?
August 7th - summer log - 2001s-32

2005

August 23rd - summer log - 2005s-38 - Facts and figures from the water board
October 23rd - autumn log - 2005a-01 - Visited entrances. Photos.

2006

January 1st - Easter log - 2006e-58
April 9th - Easter log - 2006e-03; 2006e-59 - (-4) Detectors for OB in.
April 10th - Easter log - 2006e-05
April 11th - Easter log - 2006e-06; 2006e-59 - (-2) neg
April 13th - Easter log - 2006e-23; 2006e-59 - (0) neg
April 16th - Easter log - 2006e-26; 2006e-59 - (3) neg
April 18th - Easter log - 2006e-59 - (5) neg
April 20th - Easter log - 2006e-44; 2006e-60 - (7) positive result
April 22nd - Easter log - 2006e-55; 2006e-60 - (9) positive result
January 1st - summer log - 2006s-16

2007

October 18th - autumn log - 2007a-17

2008

September 6th - summer log - 2008s-94 - Visit to check GPS. GR altered.
November 16th - autumn log - 2008a-23 - Entrance photo in flood.

2009

January 1st - Easter log - 2009e-64
May 21st - Whit log - 2009w-07 - Alternate route down to stream found.
July 16th - summer log - 2009s-03 - Above cavers entrance, 8m scaling pole to 4m of small passage. (Small entrance noticed at pipe resurgence.)
July 27th - summer log - 2009s-16
July 28th - summer log - 2009s-19
August 5th - summer log - 2009s-40 - Passage on R explored. 82.3m Batch agua1 TL=1691+82 = 1773m

2010

March 30th - Easter log - 2010e-07 - Acquaintance trip.
March 31st - Easter log - 2010e-12 - Extended through boulders beyond W aven. Small sandy passage. L=153m TL=2046+153=2199m Height = 43m

2011

July 22nd - summer log - 2011s-09 - Dowsing to trace upstream route.
July 23rd - summer log - 2011s-10 - Dowsing to trace upstream route.
January 1st - autumn log - 2011a-04

2012

February 9th - Jan-Feb log - 2012jf-04; 2012jf-05

2013

August 5th - summer log - 2013s-46 - Mistaken entry @ 2nd entrance.
August 8th - summer log - 2013s-65 - Explored to sump 1. Line repaired. All side passages are undercuts or end in blind airbells.
August 9th - summer log - 2013s-66 - Surveyed cave 1 + 2 up to boulder choke. Photos. L=182m TL=2199 = 182 = 2381m
August 17th - summer log - 2013s-79 - New trackleading down past middle entrance. Photos.
August 25th - summer log - 2013s-88

2014

July 29th - summer log - 2014s-15 - Look at upstream sump in lower cave. No dive.
August 5th - summer log - 2014s-31 - Swim to sump and back + general look around.

2016

March 21st - Easter log - 2016e-10 - Detector placed for Duck Pond water trace.
March 22nd - Easter log - 2016e-11 - Removed -ve *See later
March 25th - Easter log - 2016e-57 - *Duck Pond (1976 test) Detector in.
March 28th - Easter log - 2016e-58 - Negative
March 29th - Easter log - 2016e-58 - 1600 Negative
April 2nd - Easter log - 2016e-58 - POSITIVE @ upper and lower Aguanaz
April 4th - Easter log - 2016e-59
April 5th - Easter log - 2016e-44 - Detector placed for Hoyón test.
April 6th - Easter log - 2016e-45 - Detector -ve Left for Hoyón test
April 10th - Easter log - 2016e-53 - Detector -ve. New one put in. Water very muddy
April 13th - Easter log - 2016e-55 - Detector -ve.
October 23rd - autumn log - 2016a-03 - OBA detector placed in stream for dye test from Pistruellos group site (Moncobe?)
October 25th - autumn log - 2016a-03 - detector checked
October 27th - autumn log - 2016a-03 - detector checked
October 29th - autumn log - 2016a-03 - detector checked

2017

April 20th - Easter log - 2017e-39 - Through sump 1 to inlet explored upstream.
April 22nd - Easter log - 2017e-39 - Continued in inlet up to choke with possible large passage above.
April 23rd - Easter log - 2017e-39; 2017e-48 - Surveyed new bit. 770m Batch 17-01 TL=770m+2416 = 3186m
April 29th - Easter log - 2017e-51
May 1st - Easter log - 2017e-42 - Detector +ve from El Cubillón 2538 on 23/4/17 (Detectors from 0551 + 0767 negative)
May 4th - Easter log - 2017e-50 - As 1/5/17. 713 detector positive (photo)
May 6th - Easter log - 2017e-50
August 12th - summer log - 2017s-46 - Surface prep.
August 13th - summer log - 2017s-46 - Confirmation of final upstream sump description - Jim Lister.

2018

April 1st - Easter log - 2018e-15 - Control detector placed before possible test from Alisas.
April 4th - Easter log - 2018e-30 - Negaitve
April 7th - Easter log - 2018e-51; 2018e-53 - Through sump @ end of Sarah Jean Passage. Broke through choke but no easy way on. Route under choke is in polluted water. 72.8m surveyed batch 18-01 TL=72.8+3186 = 3259m
April 10th - Easter log - 2018e-56; 2018e-56; 2018e-71; 2018e-71 - OBA detector in (2 accounts)
April 11th - Easter log - 2018e-58 - Checking water levels. Up 7 - 8m or more.
April 12th - Easter log - 2018e-58 - Detector removed (negative) + replaced.
April 13th - Easter log - 2018e-58; 2018e-72 - Detector POSITIVE from site 1969 OBA came through in 2 -3 days. 2 accounts
April 17th - Easter log - 2018e-68; 2018e-74 - To sump 3B + passed to walking passage. Detector still positive from 1969
April 19th - Easter log - 2018e-69 - Some of the new finds surveyed. Batch 18-02: 16.6m Batch 18-03: 73.4m TL=90+3259 = 3349m (Sketch in log book of end of 18-03)
April 21st - Easter log - 2018e-70
April 25th - Easter log - 2018e-81
May 18th - Easter log - 2018e-82; 2018e-83
May 22nd - Easter log - 2018e-80
July 27th - summer log - 2018s-08; 2018s-14; 2018s-15; 2018s-16 - Dived end of SJ Passage into passage with streamway. Batch 18-04 L=172m TL=3349+172 = 3521m 2 accounts of the same trip.
August 5th - summer log - 2018s-26; 2018s-27; 2018s-40 - (1) "Tight sump" @ end of main passage dived. Choke continues. (2) Eastern Inlet Passage slot capped (marked 30m to tight rift) Modest chamber entered then another with a climb 5-6m with water entering. Mark Smith fell off this with some face injury. No survey.
August 8th - summer log - 2018s-29 - Equipment in Eastern Inlet removed. Surveyed by J.L. L=80.5m TL=3521+81 = 3602m Batch 18-06
August 13th - summer log - 2018s-36; 2018s-37 - JL dive through sump 5B to large aven and passage. Very high. Not surveyed. Aven called Gwynt O'r Hefoedd (GH Avenj for short)
August 14th - summer log - 2018s-39 - Entrance constriction removed. Photos and video @ top entrance.
August 20th - summer log - 2018s-57 - Aerial video + pano photos over the current supposed end of Sarah Jean Passage. End of summer surveyed TL=3602m
October 29th - autumn log - 2018a-12; 2018a-13; 2018a-14 - Reply to pollution alert. No response necessary.
December 25th - Xmas - New Year log - 2018c-05 - 1st pitch made safer / easier.

2019

April 5th - Easter log - 2019e-59
May 3rd - Easter log - 2019e-59; 2019e-64 - Sump 5b dived. GH Aven inspected. Explore to "75" junction and RH inlet.
May 5th - Easter log - 2019e-64; 2019e-65 - LH passage from "75" followed up brittle cascade to a choke. Needs capping.
May 7th - Easter log - 2019e-65 - Choke area around SJ sump 3 cleared of boulders and stabilised.
May 8th - Easter log - 2019e-65 - JL solo trip to secure choke area.
May 9th - Easter log - 2019e-55
May 10th - Easter log - 2019e-65 - GH Aven climb up 17m
May 12th - Easter log - 2019e-65 - LH passage before "75" explored to sump 6B.
August 2nd - summer log - 2019s-14 - To sump 5B. Damp caps didn't work to cap choke.
August 4th - summer log - 2019s-17 - Capping in SJ to avoid loose climb Can now pass @ stream level Capped Hippodrome. More work needed. Jim Lister solo.
August 6th - summer log - 2019s-23; 2019s-24 - Through Hippodrome. Surveyed and ~ 100m unsurveyed.
August 8th - summer log - 2019s-30 - Surveyed beyond Hippodrome Batch 19-05 L=178. Lots of cow slurry seen + video'd on way out. Coming from Western Inlet + possibly farm above.
August 10th - summer log - 2019s-31; 2019s-32
August 13th - summer log - 2019s-34
August 23rd - summer log - 2019s-54; 2019s-55; 2019s-56 - Diario Montañés article. Farmer being investigated.
August 26th - summer log - 2019s-58 - Solo dives. Kit out from GH Aven
September 19th - summer log - 2019s-62 - Guardia shown the entrance.

2022

April 1st - Easter log - 2022e-01 - "Good path to top entrance"
August 5th - summer log - 2022s-22 - Photos of entrance. V. dry. Old structures gone.
October 29th - autumn log - 2022a-07 - 360° photos around entrances in drought.

2023

July 31st - summer log - 2023s-15 - Ladder fixed @ climb into main streamway.
August 1st - summer log - 2023s-27
August 2nd - summer log - 2023s-17; 2023s-28 - Line broken through sump 1. Repaired but broke again.
August 3rd - summer log - 2023s-24; 2023s-32; 2023s-33 - Batch 23-01 L=38m Most leads finished. Effluent seen - survey in log book GH Aven now best lead L=4776m

2024

January 10th - Jan-Feb log - 2024jf-01 - Photos video
July 2nd - summer log - 2024s-01 - Gear for diving into sump 1
July 3rd - summer log - 2024s-01; 2024s-02 - No go in main stream. New inlet investigated.
July 5th - summer log - 2024s-02; 2024s-03 - Inlet partly explored. Surveyed. Batch 24-01 L=356m TL=4776 + 356 = 5132m
July 7th - summer log - 2024s-03; 2024s-04 - Side inlet surveyed. Batch 24-02 (contains -01) L of 24-02 is 462.3 TL=4776 + 462.3 = 5238m
July 9th - summer log - 2024s-04; 2024s-05 - Capping at aven and inlet.
July 11th - summer log - 2024s-05; 2024s-06 - Inlet enlarged to pit and stream coming in.
July 15th - summer log - 2024s-08 - Some surveying. Aven bolted towards 2 stream passages. More bolts required.
July 16th - summer log - 2024s-08; 2024s-09; 2024s-10; 2024s-11 - Aven climbed. Loose boulder choke. Photos. Survey. Batch 24-03 contain 02 and 03. TL=4776+523.3 = 5299.3m
July 18th - summer log - 2024s-11; 2024s-12 - Equipment removed. Photos of sump 1. Thoughts about exploration.
December 10th - Xmas- New Year log - 2024c-01

2025

April 15th - Easter log - 2025e-61
July 20th - summer log - 2025s-03 - Gear to entrance
July 21st - summer log - 2025s-03 - Gear to sump 1
July 22nd - summer log - 2025s-04 - Gear to sump 2a
July 24th - summer log - 2025s-04; 2025s-05; 2025s-06; 2025s-07 - Sump 1 = 60m confirmed.
July 26th - summer log - 2025s-08; 2025s-09 - More gear to cave.
July 28th - summer log - 2025s-13 - Scaffolding to start of sump 1
July 29th - summer log - 2025s-16 - Scaffolding to "Sarah Jean".
July 30th - summer log - 2025s-17 - Scaffolding to choke between sump 2A and 3A. Choke stabilised.
August 1st - summer log - 2025s-21 - More work on choke. Bolting kit to start of sump 5.
August 3rd - summer log - 2025s-24; 2025s-25 - GH Aven ascended to +35m to a ledge. Top still not visible
August 5th - summer log - 2025s-27 - Small aven climbed 11m to a boulder choke. Kit removed back to sump 2a
August 12th - summer log - 2025s-41 - (1) Area above boulder choke between sumps 2a and 2b surveyed. (2) Equipment dived out to SJ Passage.
August 14th - summer log - 2025s-46 - (1) Kit carried out to sump 1. (2) Survey side passages downstream of sump 2a and main streamway.
August 15th - summer log - 2025s-48; 2025s-49 - Only batch 4 can be used. Length of other (1,2,3) used. TL = 5299 + 288 = 5587 (See log book)
August 16th - summer log - 2025s-50 - All kit at base of entrance pitch.
August 17th - summer log - 2025s-56; 2025s-57 - Kit extracted. Photos.

2026

March 29th - Easter log - 2026e-05
April 5th - Easter log - 2026e-22 - Jim Lister into Sarah Jean to checkout survey hardware/app. Admin issues (new folder rqd for new survey) but survey on phone + comp generally seems OK. (Batch 26-01a)
April 8th - Easter log - 2026e-42; 2026e-43 - Large chamber entered off main stream. Avens climbed with more to do.
April 9th - Easter log - 2026e-43 - More aven climbing. Extension surveyed 133.5m.
April 11th - Easter log - 2026e-48 - Tried to (re)survey inlets to SJ passage but "anomalies with the survey equipment were found". TL=5587 + 134m = 5721m
April 20th - Easter log - 2026e-49

Published documents: print and digital

• [DA] Cawthorne R, 1987 Matienzo '87 Plymouth Caving Group Newsletter and Journal, No. 101, Sept. '87
• p24 - First entered?? [DA or DC or DF?]
• [BC] Davis J and Corrin J, 1989 Matienzo 1988 Caves & Caving 44, Summer 1989
Summary of 1988. More passage to go at
• [BJ] Corrin J, 1990 Matienzo '89 Caves & Caving 49, Autumn 1990
Summary of '89
• [BP] Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
survey on area map
• [CS] Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
survey on area map
• [CX] Corrin Juan, 1995a Matienzo '95 Caves & Caving, Issue 70, Winter '95
• p25 - Survey and sentence.
• [FJ] Corrin Juan, 1996 Matienzo '95 Boletín Cántabro de Espeleología no. 12
• p75 - Mention
• p78 - Survey
• [DS] García José León, 1997 Cantabria Subterránea. Catálogo de las Grandes Cavidades
• pp259-260 - Summary & exploration history to 1996
• [DV] Corrin Juan, 1997c El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p713 - Future hopes.
• [EP] Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p17 - Summary
• [ES] Corrin Juan, 2003c Las Cuevas de Matienzo. Exploración y documentación. La Cueva de Cofresnedo en el Valle de Matienzo Ruiz Cobo Jesús and Smith Peter (directores)
• p31 - Summary - possible link to NVS.
• [EY] Corrin Juan, 2006a Expedition Report: Matienzo, Spain 2005 Speleology Issue 7, August 2006 BCRA
• p23 - Average flow = 951 litres per second
• [EZ] Corrin Juan, 2007 Expedition Report: Matienzo, Spain 2006 Speleology Issue 9, April 2007 BCRA
• p16
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p32,33,36,38,39 - in summary article in Spanish
• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p21,23
• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p12,14 - Summary
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• p279 - History; description; survey
• [FP] Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p10 - Summary
• [GK] Ruiz Cobo J and Muñoz Fernández E, 2013 El registro arqueológico del valle de Miera BAR International Series 2542 Archaeopress, Oxford
• p56 - Resumé Cueva Aguanaz.
• [GH] Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• pp42-51 - Possible link to Asón systems
• p43 - on map