1988
August 10th - summer log -
1988s-67 -
Explored; surveyd; photographed.
1989
January 1st - summer log -
1989s-00
August 6th - summer log -
1989s-71 -
Push at end. Needs full diving gear.
Side passage surveyed.
TL=872m
1995
May 27th - Whit log -
1995w-02
May 28th - Whit log -
1995w-03;
1995w-13 -
Dived by R. Skorupka. Sump 35m long, 5m deep.
Surfaced in large passage still going.
July 28th - summer log -
1995s-19 -
Gear taken to sump.
July 29th - summer log -
1995s-19 -
Dived through and 496m surveyed to sump 2.
TL=872 +496 = 1368m
August 5th - summer log -
1995s-63 -
Dived through sump 2
August 7th - summer log -
1995s-63 -
Surveyed extension
1368 + 323 = 1691m
August 8th - summer log -
1995s-65;
1995s-66 -
Oxbows explored.
1997
March 30th - Easter log -
1997e-08
2001
April 13th - Easter log -
2001e-37 -
Inlet on left after sump 2 explored up to large chamber with stream entering from the roof.
April 16th - Easter log -
2001e-38 -
Sump 3 dived to air bell and down through hole but not pushed.
Smaller bottles needed?
August 7th - summer log -
2001s-32
2005
August 23rd - summer log -
2005s-38 -
Facts and figures from the water board
October 23rd - autumn log -
2005a-01 -
Visited entrances. Photos.
2006
January 1st - Easter log -
2006e-58
April 9th - Easter log -
2006e-03;
2006e-59 -
(-4) Detectors for OB in.
April 10th - Easter log -
2006e-05
April 11th - Easter log -
2006e-06;
2006e-59 -
(-2) neg
April 13th - Easter log -
2006e-23;
2006e-59 -
(0) neg
April 16th - Easter log -
2006e-26;
2006e-59 -
(3) neg
April 18th - Easter log -
2006e-59 -
(5) neg
April 20th - Easter log -
2006e-44;
2006e-60 -
(7) positive result
April 22nd - Easter log -
2006e-55;
2006e-60 -
(9) positive result
January 1st - summer log -
2006s-16
2007
October 18th - autumn log -
2007a-17
2008
September 6th - summer log -
2008s-94 -
Visit to check GPS. GR altered.
November 16th - autumn log -
2008a-23 -
Entrance photo in flood.
2009
January 1st - Easter log -
2009e-64
May 21st - Whit log -
2009w-07 -
Alternate route down to stream found.
July 16th - summer log -
2009s-03 -
Above cavers entrance, 8m scaling pole to 4m of small passage.
(Small entrance noticed at pipe resurgence.)
July 27th - summer log -
2009s-16
July 28th - summer log -
2009s-19
August 5th - summer log -
2009s-40 -
Passage on R explored. 82.3m Batch agua1
TL=1691+82 = 1773m
2010
March 30th - Easter log -
2010e-07 -
Acquaintance trip.
March 31st - Easter log -
2010e-12 -
Extended through boulders beyond W aven. Small sandy passage. L=153m
TL=2046+153=2199m
Height = 43m
2011
July 22nd - summer log -
2011s-09 -
Dowsing to trace upstream route.
July 23rd - summer log -
2011s-10 -
Dowsing to trace upstream route.
January 1st - autumn log -
2011a-04
2012
February 9th - Jan-Feb log -
2012jf-04;
2012jf-05
2013
August 5th - summer log -
2013s-46 -
Mistaken entry @ 2nd entrance.
August 8th - summer log -
2013s-65 -
Explored to sump 1. Line repaired.
All side passages are undercuts or end in blind airbells.
August 9th - summer log -
2013s-66 -
Surveyed cave 1 + 2 up to boulder choke. Photos. L=182m
TL=2199 = 182 = 2381m
August 17th - summer log -
2013s-79 -
New trackleading down past middle entrance. Photos.
August 25th - summer log -
2013s-88
2014
July 29th - summer log -
2014s-15 -
Look at upstream sump in lower cave. No dive.
August 5th - summer log -
2014s-31 -
Swim to sump and back + general look around.
2016
March 21st - Easter log -
2016e-10 -
Detector placed for Duck Pond water trace.
March 22nd - Easter log -
2016e-11 -
Removed -ve
*See later
March 25th - Easter log -
2016e-57 -
*Duck Pond (1976 test) Detector in.
March 28th - Easter log -
2016e-58 -
Negative
March 29th - Easter log -
2016e-58 -
1600 Negative
April 2nd - Easter log -
2016e-58 -
POSITIVE @ upper and lower Aguanaz
April 4th - Easter log -
2016e-59
April 5th - Easter log -
2016e-44 -
Detector placed for Hoyón test.
April 6th - Easter log -
2016e-45 -
Detector -ve Left for Hoyón test
April 10th - Easter log -
2016e-53 -
Detector -ve. New one put in. Water very muddy
April 13th - Easter log -
2016e-55 -
Detector -ve.
October 23rd - autumn log -
2016a-03 -
OBA detector placed in stream for dye test from Pistruellos group site (Moncobe?)
October 25th - autumn log -
2016a-03 -
detector checked
October 27th - autumn log -
2016a-03 -
detector checked
October 29th - autumn log -
2016a-03 -
detector checked
2017
April 20th - Easter log -
2017e-39 -
Through sump 1 to inlet explored upstream.
April 22nd - Easter log -
2017e-39 -
Continued in inlet up to choke with possible large passage above.
April 23rd - Easter log -
2017e-39;
2017e-48 -
Surveyed new bit. 770m Batch 17-01
TL=770m+2416 = 3186m
April 29th - Easter log -
2017e-51
May 1st - Easter log -
2017e-42 -
Detector +ve from El Cubillón 2538 on 23/4/17
(Detectors from 0551 + 0767 negative)
May 4th - Easter log -
2017e-50 -
As 1/5/17.
713 detector positive (photo)
May 6th - Easter log -
2017e-50
August 12th - summer log -
2017s-46 -
Surface prep.
August 13th - summer log -
2017s-46 -
Confirmation of final upstream sump description - Jim Lister.
2018
April 1st - Easter log -
2018e-15 -
Control detector placed before possible test from Alisas.
April 4th - Easter log -
2018e-30 -
Negaitve
April 7th - Easter log -
2018e-51;
2018e-53 -
Through sump @ end of Sarah Jean Passage. Broke through choke but no easy way on.
Route under choke is in polluted water.
72.8m surveyed batch 18-01
TL=72.8+3186 = 3259m
April 10th - Easter log -
2018e-56;
2018e-56;
2018e-71;
2018e-71 -
OBA detector in (2 accounts)
April 11th - Easter log -
2018e-58 -
Checking water levels. Up 7 - 8m or more.
April 12th - Easter log -
2018e-58 -
Detector removed (negative) + replaced.
April 13th - Easter log -
2018e-58;
2018e-72 -
Detector POSITIVE from site 1969
OBA came through in 2 -3 days. 2 accounts
April 17th - Easter log -
2018e-68;
2018e-74 -
To sump 3B + passed to walking passage.
Detector still positive from 1969
April 19th - Easter log -
2018e-69 -
Some of the new finds surveyed.
Batch 18-02: 16.6m
Batch 18-03: 73.4m
TL=90+3259 = 3349m
(Sketch in log book of end of 18-03)
April 21st - Easter log -
2018e-70
April 25th - Easter log -
2018e-81
May 18th - Easter log -
2018e-82;
2018e-83
May 22nd - Easter log -
2018e-80
July 27th - summer log -
2018s-08;
2018s-14;
2018s-15;
2018s-16 -
Dived end of SJ Passage into passage with streamway.
Batch 18-04 L=172m
TL=3349+172 = 3521m
2 accounts of the same trip.
August 5th - summer log -
2018s-26;
2018s-27;
2018s-40 -
(1) "Tight sump" @ end of main passage dived. Choke continues.
(2) Eastern Inlet Passage slot capped (marked 30m to tight rift)
Modest chamber entered then another with a climb 5-6m with water entering.
Mark Smith fell off this with some face injury. No survey.
August 8th - summer log -
2018s-29 -
Equipment in Eastern Inlet removed. Surveyed by J.L. L=80.5m
TL=3521+81 = 3602m Batch 18-06
August 13th - summer log -
2018s-36;
2018s-37 -
JL dive through sump 5B to large aven and passage. Very high. Not surveyed.
Aven called Gwynt O'r Hefoedd (GH Avenj for short)
August 14th - summer log -
2018s-39 -
Entrance constriction removed.
Photos and video @ top entrance.
August 20th - summer log -
2018s-57 -
Aerial video + pano photos over the current supposed end of Sarah Jean Passage.
End of summer surveyed TL=3602m
October 29th - autumn log -
2018a-12;
2018a-13;
2018a-14 -
Reply to pollution alert. No response necessary.
December 25th - Xmas - New Year log -
2018c-05 -
1st pitch made safer / easier.
2019
April 5th - Easter log -
2019e-59
May 3rd - Easter log -
2019e-59;
2019e-64 -
Sump 5b dived. GH Aven inspected. Explore to "75" junction and RH inlet.
May 5th - Easter log -
2019e-64;
2019e-65 -
LH passage from "75" followed up brittle cascade to a choke. Needs capping.
May 7th - Easter log -
2019e-65 -
Choke area around SJ sump 3 cleared of boulders and stabilised.
May 8th - Easter log -
2019e-65 -
JL solo trip to secure choke area.
May 9th - Easter log -
2019e-55
May 10th - Easter log -
2019e-65 -
GH Aven climb up 17m
May 12th - Easter log -
2019e-65 -
LH passage before "75" explored to sump 6B.
August 2nd - summer log -
2019s-14 -
To sump 5B. Damp caps didn't work to cap choke.
August 4th - summer log -
2019s-17 -
Capping in SJ to avoid loose climb
Can now pass @ stream level
Capped Hippodrome. More work needed. Jim Lister solo.
August 6th - summer log -
2019s-23;
2019s-24 -
Through Hippodrome. Surveyed and ~ 100m unsurveyed.
August 8th - summer log -
2019s-30 -
Surveyed beyond Hippodrome
Batch 19-05 L=178.
Lots of cow slurry seen + video'd on way out. Coming from Western Inlet + possibly farm above.
August 10th - summer log -
2019s-31;
2019s-32
August 13th - summer log -
2019s-34
August 23rd - summer log -
2019s-54;
2019s-55;
2019s-56 -
Diario Montañés article. Farmer being investigated.
August 26th - summer log -
2019s-58 -
Solo dives. Kit out from GH Aven
September 19th - summer log -
2019s-62 -
Guardia shown the entrance.
2022
April 1st - Easter log -
2022e-01 -
"Good path to top entrance"
August 5th - summer log -
2022s-22 -
Photos of entrance. V. dry. Old structures gone.
October 29th - autumn log -
2022a-07 -
360° photos around entrances in drought.
2023
July 31st - summer log -
2023s-15 -
Ladder fixed @ climb into main streamway.
August 1st - summer log -
2023s-27
August 2nd - summer log -
2023s-17;
2023s-28 -
Line broken through sump 1.
Repaired but broke again.
August 3rd - summer log -
2023s-24;
2023s-32;
2023s-33 -
Batch 23-01 L=38m Most leads finished.
Effluent seen - survey in log book
GH Aven now best lead
L=4776m
2024
January 10th - Jan-Feb log -
2024jf-01 -
Photos video
July 2nd - summer log -
2024s-01 -
Gear for diving into sump 1
July 3rd - summer log -
2024s-01;
2024s-02 -
No go in main stream.
New inlet investigated.
July 5th - summer log -
2024s-02;
2024s-03 -
Inlet partly explored. Surveyed.
Batch 24-01 L=356m
TL=4776 + 356 = 5132m
July 7th - summer log -
2024s-03;
2024s-04 -
Side inlet surveyed.
Batch 24-02 (contains -01)
L of 24-02 is 462.3
TL=4776 + 462.3 = 5238m
July 9th - summer log -
2024s-04;
2024s-05 -
Capping at aven and inlet.
July 11th - summer log -
2024s-05;
2024s-06 -
Inlet enlarged to pit and stream coming in.
July 15th - summer log -
2024s-08 -
Some surveying. Aven bolted towards 2 stream passages.
More bolts required.
July 16th - summer log -
2024s-08;
2024s-09;
2024s-10;
2024s-11 -
Aven climbed. Loose boulder choke. Photos. Survey.
Batch 24-03 contain 02 and 03.
TL=4776+523.3 = 5299.3m
July 18th - summer log -
2024s-11;
2024s-12 -
Equipment removed. Photos of sump 1.
Thoughts about exploration.
December 10th - Xmas- New Year log -
2024c-01
2025
April 15th - Easter log -
2025e-61
July 20th - summer log -
2025s-03 -
Gear to entrance
July 21st - summer log -
2025s-03 -
Gear to sump 1
July 22nd - summer log -
2025s-04 -
Gear to sump 2a
July 24th - summer log -
2025s-04;
2025s-05;
2025s-06;
2025s-07 -
Sump 1 = 60m confirmed.
July 26th - summer log -
2025s-08;
2025s-09 -
More gear to cave.
July 28th - summer log -
2025s-13 -
Scaffolding to start of sump 1
July 29th - summer log -
2025s-16 -
Scaffolding to "Sarah Jean".
July 30th - summer log -
2025s-17 -
Scaffolding to choke between sump 2A and 3A.
Choke stabilised.
August 1st - summer log -
2025s-21 -
More work on choke.
Bolting kit to start of sump 5.
August 3rd - summer log -
2025s-24;
2025s-25 -
GH Aven ascended to +35m to a ledge. Top still not visible
August 5th - summer log -
2025s-27 -
Small aven climbed 11m to a boulder choke.
Kit removed back to sump 2a
August 12th - summer log -
2025s-41 -
(1) Area above boulder choke between sumps 2a and 2b surveyed.
(2) Equipment dived out to SJ Passage.
August 14th - summer log -
2025s-46 -
(1) Kit carried out to sump 1.
(2) Survey side passages downstream of sump 2a and main streamway.
August 15th - summer log -
2025s-48;
2025s-49 -
Only batch 4 can be used. Length of other (1,2,3) used.
TL = 5299 + 288 = 5587 (See log book)
August 16th - summer log -
2025s-50 -
All kit at base of entrance pitch.
August 17th - summer log -
2025s-56;
2025s-57 -
Kit extracted. Photos.
2026
March 29th - Easter log -
2026e-05
April 5th - Easter log -
2026e-22 -
Jim Lister into Sarah Jean to checkout survey hardware/app. Admin issues (new folder rqd for new survey) but survey on phone + comp generally seems OK. (Batch 26-01a)
April 8th - Easter log -
2026e-42;
2026e-43 -
Large chamber entered off main stream. Avens climbed with more to do.
April 9th - Easter log -
2026e-43 -
More aven climbing. Extension surveyed 133.5m.
April 11th - Easter log -
2026e-48 -
Tried to (re)survey inlets to SJ passage but "anomalies with the survey equipment were found".
TL=5587 + 134m = 5721m
April 20th - Easter log -
2026e-49