Extra notes from card index
• L17C 4 days over Xmas + New Year. Enlarging.
Orphan card index date references to logbook pages
• [01/08/1986] 5m climb to 5m crawl to draughting rift 150mm.
Way on down open but does not draught.
See position on VIII-30 (copy)
Also 81:0 in file D=5
• [04/01/1996] Attempt at entry.
• [18/08/2017] Brief "survey" in log book.
Doesn't agree with previous survey? 4/6/17
Dated logbook entries with card index notes
1986
July 1st - summer log -
1986s-59
1991
August 3rd - summer log -
1991s-29
1993
August 2nd - summer log -
1993s-41
1996
April 1st - Easter log -
1996e-02
1997
August 2nd - summer log -
1997s-45
August 3rd - summer log -
1997s-17
2010
July 28th - summer log -
2010s-19 -
Extended to dig
July 30th - summer log -
2010s-22;
2010s-23;
2010s-27 -
Enlarged to draughting boulder choke.
August 1st - summer log -
2010s-25 -
Snappered. Ends in rift blocked with boulders
Still lots of draught. Needs work.
2012
April 9th - Easter log -
2012e-48 -
GPS. Photos. Smoke test.
2015
April 7th - Easter log -
2015e-27;
2015e-28
2017
July 30th - summer log -
2017s-16 -
Looks "cappable" to gain access to horizontal crawl.
August 1st - summer log -
2017s-19 -
Excavated. 5m long flat out crawl to small rift and another horiz. passage that needs capping.
August 4th - summer log -
2017s-25 -
Pushing. Survey.
L=25 D=11m
August 7th - summer log -
2017s-36 -
Capped. Pushed; digging. More caps needed.
August 13th - summer log -
2017s-48 -
More work.
August 15th - summer log -
2017s-48;
2017s-49 -
Enlarging previously traversed passage.
August 17th - summer log -
2017s-49;
2017s-50
November 30th - Xmas - New Year log -
2017c-04
December 28th - Xmas - New Year log -
2017c-01
2018
March 30th - Easter log -
2018e-08 -
Enlarging. Draughting in strongly
April 4th - Easter log -
2018e-42 -
Endoscope near entrance
April 5th - Easter log -
2018e-36
August 10th - summer log -
2018s-31 -
More capping
December 20th - Xmas - New Year log -
2018c-08 -
Digging
December 22nd - Xmas - New Year log -
2018c-08 -
Digging
2019
April 17th - Easter log -
2019e-28 -
Now a 4/5 person dig.
Strong draught out on a cool day.
2023
December 26th - Xmas - New Year log -
2023c-07 -
Flood debris throughout: floor , ledges high in roof. Cold draught in.
2024
January 10th - Jan-Feb log -
2024jf-01 -
Photo. Video.
Published documents: print and digital
• [FP]
Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p9 - Summary