April 10th - Easter log -
1985e-13 -
L=8m D=3m Choke. Draughts.
August 4th - summer log -
1994s-28 -
Revisited. Needs digging.
August 6th - summer log -
1994s-30
August 5th - summer log -
2012s-32
August 5th - summer log -
2025s-27 -
Good draught.
August 10th - summer log -
2025s-37 -
Strongly draughting rift near top needs enlarging.
August 12th - summer log -
2025s-41 -
Enlarging rift near top of drop.
August 13th - summer log -
2025s-45 -
Enlarging rift near top of drop.
Down to head of unexplored p11
August 14th - summer log -
2025s-48 -
Head of pitch collapsed. Needs scaffolding / planks to safely dig out.
TL=20 d=14m
October 10th - autumn log -
2025a-03 -
Inspected. Easiest to shore from inside.
October 15th - autumn log -
2025a-05 -
Felis Silvestria seen @ entrance.
Cave surveyed. Batch 0525 has svg files. L=19.2
Some stabilising carried out.
d=4 surveyed + p11 = 15m