April 20th - Easter log -
2019e-35 -
Descended into phreatic chamber with 2 ways on.
Surveyed TL = 30m d = 4m
April 22nd - Easter log -
2019e-36 -
Passed calcite blockage. 6m to choke.
Other dig. Needs summer weather to investigate draught.
L = 36m? d=4m
October 14th - autumn log -
2021a-06 -
Digging. No point in continuing.