August 27th - summer log -
2018s-63 -
Strongly draughting hole by track.
August 30th - summer log -
2018s-64 -
Digging.
New GPS 0453004 4798309
September 2nd - summer log -
2018s-65 -
Digging
September 4th - summer log -
2018s-65 -
Shoring. Rift is choked.
More work needed. d=4m?
April 13th - Easter log -
2019e-27 -
More shoring required.
April 16th - Easter log -
2019e-27 -
Shoring installed.
Back wall failing.
April 17th - Easter log -
2019e-27 -
More shoring. Good draught.
April 20th - Easter log -
2019e-34 -
More digging. About 5m deep.
August 6th - summer log -
2019s-22 -
Pinning rocks with rebar.
August 27th - summer log -
2019s-59 -
More digging.