MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#4732 Decepción, Torca la (bottom entrance)
La Secada - 30T 0453011 4798395 Altitude: 232m
Website description for site 4732   |   Site in context, area map

Extra notes from card index
• 4VS 70059m @ 31/8/22
• Jan 2023: Minor survey corrections.
• L24E: Ropes measured for Small + Grand Slam. SS: 60m rope; maillons x 6 1 krab + sling. GS: 51m rope; maillons x 4
• [Card missing?]
• See 0107 for El Gordo etc trips.

Orphan card index date references to logbook pages
• [12/04/2018] Another entrance into 0252.
• [29/12/2023] Bags dropped off for tomorrow's trip.
• [01/01/2024] Tackle left for tomorrow's trip.
• [04/01/2024] Ropes picked up.
• [07/12/2025] Entrance located and photo.
• [07/11/2026] Therion surveys (pdfs) of Decepción (4732), and Decepción with Armageddon / Trident ends of Hoyuca (#0107) from Simon Cornhill.

Dated logbook entries with card index notes

2018

April 13th - Easter log - 2018e-60
April 14th - Easter log - 2018e-60 - Dug open to access dig in 0252. Good draught.
April 16th - Easter log - 2018e-65 - More digging. ~40m explored. Sketch in logbook.
April 17th - Easter log - 2018e-66
April 21st - Easter log - 2018e-69 - Surveyed. See 0252 for length.
April 27th - Easter log - 2018e-78
August 27th - summer log - 2018s-63 - Short pitch bypassed. Digging at end See 0252.
November 24th - autumn log - 2018a-18
November 25th - autumn log - 2018a-19

2019

April 13th - Easter log - 2019e-27
April 28th - Easter log - 2019e-46

2020

February 22nd - Jan-Feb log - 2020jf-08 - Digging to boulders.
February 24th - Jan-Feb log - 2020jf-08 - More digging.
February 25th - Jan-Feb log - 2020jf-08 - Into rift + 15m passage. Rift down needs capping.
July 24th - Spring-Summer log - 2020s-11 - Work detailed
July 29th - Spring-Summer log - 2020s-07 - Top of rift opened to possible p30. Draughting.
July 30th - Spring-Summer log - 2020s-11 - Work detailed
August 4th - Spring-Summer log - 2020s-09
August 6th - Spring-Summer log - 2020s-11 - Work detailed
August 7th - Spring-Summer log - 2020s-10 - Down p8 to a possible p30. Rift opened up. Left for Eatser 2021

2021

August 3rd - summer log - 2021s-17 - Down p30 to passage ends at wet low section. Good draught.
August 10th - summer log - 2021s-32 - Complete survey including samll series above head of pitch. New = 111+23 = 134m TL=82 + 134 = 216m d=52m (from 0252 entrance) Torca la Decepción

2022

August 8th - summer log - 2022s-30 - Dug out duck/crawl into hand + knees passage - still going.
August 10th - summer log - 2022s-31; 2022s-32 - Pushed through to pitch ~35m. Strong draught. Surveyed 83m TL=216 + 83 =299m
August 12th - summer log - 2022s-33 - (1) 360° photos + video (2) ~ 600m surveyed down pitch at end of crawl. Account after 15/8/22
August 13th - summer log - 2022s-37; 2022s-38 - Extending cave. Probably links to Hoyuca at E Armageddon. TL=1298m d=110m (New=1082m)
August 15th - summer log - 2022s-40; 2022s-41 - Passage description and names on annotated survey.
August 16th - summer log - 2022s-46; 2022s-47 - From Hoyuca 0107, Ganda Panda: Connection into Disappointment Pot after plugs and feathers of boulder. Emerged in Matienzo.
August 20th - summer log - 2022s-47; 2022s-48 - Various additions: Climb up from station 12 to a 34m drippy aven. Upstream Vienna Coup to 3 way junction. Surveyed 395m TL=1706.
August 22nd - summer log - 2022s-61 - Continue upstream from base of Grand Slam + surveying.
August 23rd - summer log - 2022s-62 - (1) Continuing upstream survey from Station 179. (2) Survey from 265 upstream. (3) Explored down into SBI in Hoyuca. Surveyed to Rocky Horror.
August 29th - summer log - 2022s-67 - Names to keep. TL including *DUPLICATE of 0107-22-01 and link with Armageddon 2335m 4VS = 69786m (but see 0081)
September 8th - summer log - 2022s-71

2023

April 4th - Easter log - 2023e-16; 2023e-17 - All p re-rigged but some bolts need replacement. (i) Griffin's Club climb needs gear. (ii) Inlet noted near start of Vienna Coup. (iii) Connected Griffins to Hideous Hog. Batch 0252-23-02 ( iv) Inlet Passage Batch 0252-23-01 01 length = 17.8 02 length = 61m
April 6th - Easter log - 2023e-17; 2023e-18 - Re-rigged with SS bolts.
April 10th - Easter log - 2023e-51; 2023e-52 - Inspecting bolts. hangers. To Duckhams + Rocky Horror. Inspection of Rocky Horror.
April 12th - Easter log - 2023e-52; 2023e-53 - Another Rocky Horror search. Up into Trident. One inlet surveyed. Batch 0107-23-01 L=60m
April 14th - Easter log - 2023e-55; 2023e-56; 2023e-57; 2023e-60; 2023e-61; 2023e-62 - Three Shrimp Bone Inlet passages surveyed. 0107-23-02 Tantrum Passage L=66m 0107-23-03 WOA Passage L=16m 0107-23-04 Shrimp Phone Inlet L=92m Rigging guide in logbook p57.
July 23rd - summer log - 2023s-09 - Rigged and trip into Rocky Horror.
July 25th - summer log - 2023s-10; 2023s-11 - (i) Resurvey from Rocky Horror stn 381 to Duckham's Sump + into Rocky Horror. (ii) Down Trident centre passage. Re-exploring (Some photos?)
July 27th - summer log - 2023s-12 - Continue resurvey up to Trdient Camp and just beyond.
July 29th - summer log - 2023s-18; 2023s-19 - Into Trident. See 0107.
July 31st - summer log - 2023s-15; 2023s-15 - (i)Bolt climb up rift before deep pool in Vienna Coup. Large chamber 11m up with possibility higher. (ii) Looked at possible leads towards Armageddon. (iii) New passage found off station 41.
August 1st - summer log - 2023s-16 - Surveyed. Batch 0252-23-03 TL=142m
August 2nd - summer log - 2023s-59; 2023s-60
August 5th - summer log - 2023s-24; 2023s-25; 2023s-30 - (i) Trip to Astradome from Decepción. Way back marked with green arrows and a few cairns. (ii)Resurvey Judgement Pitch to Duckhams (also on 0107 card) TL 4VS = 72682 72973m
August 11th - summer log - 2023s-60
December 14th - Xmas - New Year log - 2023c-02 - Digging out crawl in wet weather.
December 16th - Xmas - New Year log - 2023c-04 - to Trident.
December 18th - Xmas - New Year log - 2023c-04 - to Trident. See 0107
December 21st - Xmas - New Year log - 2023c-05 - to Trident. See 0107
December 24th - Xmas - New Year log - 2023c-06 - to Trident. See 0107
December 27th - Xmas - New Year log - 2023c-07 - to Trident. See 0107 15 hour trip. Draughts out in day, out at night.
December 30th - Xmas - New Year log - 2023c-09 - Visit to Trident. See 0107.

2024

January 2nd - Xmas - New Year log - 2023c-09 - Trip to Paisley Passage area. Grand Slam + Small Slam pitches detackled.
February 17th - Jan-Feb log - 2024jf-09
February 21st - Easter log - 2024e-02
March 31st - Easter log - 2024e-24; 2024e-24; 2024e-26; 2024e-26 - Hole on Small Slam investigated. No prospects.
April 6th - Easter log - 2024e-39 - Y-hang at top of first pitch rigged.
October 19th - autumn log - 2024a-12 - Rigging pitches. Decent route through the woods after new electric fences.
October 20th - autumn log - 2024a-19 - Used for trip to SBI.
October 22nd - autumn log - 2024a-25 - Bat seen in the entrance. Inlet at top of Small Slam investigated.
October 23rd - autumn log - 2024a-25 - 102m surveyed. Batches 24-01, 02, 03, 04 TL $VS = 76480m
October 26th - autumn log - 2024a-27
October 28th - autumn log - 2024a-28 - Check first pitch after wet spell.
October 29th - autumn log - 2024a-28 - Into Rocky Horror area, Hoyuca.
October 31st - autumn log - 2024a-29
November 1st - autumn log - 2024a-30
November 2nd - autumn log - 2024a-30; 2024a-31 - Into SBI.
December 19th - Xmas- New Year log - 2024c-01; 2024c-02 - Very wet. Some rearrange of pitches. Superduck flowing.
December 21st - Xmas- New Year log - 2024c-04; 2024c-05; 2024c-06
December 24th - Xmas- New Year log - 2024c-15
December 26th - Xmas- New Year log - 2024c-15; 2024c-16
December 28th - Xmas- New Year log - 2024c-17
December 31st - Xmas- New Year log - 2024c-22

2025

January 3rd - Xmas- New Year log - 2024c-24
January 5th - Xmas- New Year log - 2024c-26; 2024c-27
January 7th - Xmas- New Year log - 2024c-28
January 9th - Xmas- New Year log - 2024c-29
April 16th - Easter log - 2025e-23 - Photos on trip to Trident.
August 7th - summer log - 2025s-30 - Missing hanger replaced
August 14th - summer log - 2025s-46 - First pitch derigged.
October 25th - autumn log - 2025a-07 - Gear in.
October 26th - autumn log - 2025a-07 - Gear in. Super Duck very dry.
October 27th - autumn log - 2025a-08
October 29th - autumn log - 2025a-08
November 6th - autumn log - 2025a-10 - Equipment removed.
December 6th - Xmas - New Year log - 2025c-01 - Tackle in.
December 9th - Xmas - New Year log - 2025c-01
December 12th - Xmas - New Year log - 2025c-03
December 15th - Xmas - New Year log - 2025c-04
December 17th - Xmas - New Year log - 2025c-05 - Tackle in.
December 18th - Xmas - New Year log - 2025c-05
December 21st - Xmas - New Year log - 2025c-06
December 24th - Xmas - New Year log - 2025c-07
December 27th - Xmas - New Year log - 2025c-07
December 30th - Xmas - New Year log - 2025c-08
December 31st - Xmas - New Year log - 2025c-09 - Detackled.

2026

May 30th - Whit log - 2026w-06 - Rigging the Slams.
May 31st - Whit log - 2026w-06; 2026w-07 - BTM - Aven Alley 28m aven climbed; too tight higher up. Water trickles in. Too tight tube** investigated. Took an hour to retrieve caver. **'Rallador de Maíz' landed in a small blind 4m aven with tiny inlet.
June 1st - Whit log - 2026w-07 - Aven Alley - avens labelled 1, 3, 2 1: Yesterday's 2: At the end of AAlley - choked with boulders & calcite. 3: 17m up, still going.
June 2nd - Whit log - 2026w-08 - No 3 aven: Chokes with boulders at the top. Possibility from ledge part way up. Pottery found
June 3rd - Whit log - 2026w-09 - (i) No 4 aven up 30m to a large ledge. Left for pushing next time. (ii) All leads in lower levels became too tight.
June 4th - Whit log - 2026w-10 - De-rig. Survey bouldery section above Rectifying The Count. Survey at Bermuda Bowl up the incredibly greasy and steep moon milk rift heading NE. Ended in a climb up to calcited grotto and an ascending boulder choke. Surveyed 325m in total so the 4VS length = 80031m.
June 6th - Whit log - 2026w-10 - Photo of pottery at Aven 3. Altitudes cited.
June 11th - Whit log - 2026w-11 - Table of lengths for each batch 01 to 09 surveyed
July 21st - summer log - 2026s-10 - Prospecting above Aven Alley.
July 23rd - summer log - 2026s-03 - Photos of the streamway and route finding through the Armageddon chokes. Pitches left rigged.
July 27th - summer log - 2026s-06
August 2nd - summer log - 2026s-12; 2026s-12 - Planned solo trip (Decepción to Giant Panda) ended with a 7m fall in Armageddon. Self 'rescue' then driven to Ramales and Valdecilla. Broken ribs, punctured lung and face bone.

Published documents: print and digital

• [HU] Scaife Chris, 2022a Finding Big … Descent 285 April/May 2022 Wild Places Publishing, Abergavenny
• p16
• [KL] Corrin Juan et al, 2025 Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - KL 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161 (area map + photos)
• [KR] Papard Phil et al, 2025 La Exploración de Torca la Decepción Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp160-161 - KR La Exploración de Torca la Decepción Boletín Cántabro de Espeleología, 18. pp 160 - 161