Extra notes from card index
• Photos from Easter visits.
Orphan card index date references to logbook pages
• [31/03/2018] More capping required.
Dated logbook entries with card index notes
2018
March 30th - Easter log -
2018e-17 -
(Ref 30b)
9m deep shaft to strongl;y draughting rift at N end.
S end also draughts and needs capping.
April 1st - Easter log -
2018e-17 -
More capping.
p9 explored to another 4 - 5m drop which also needs capping.
Boulder squashed ladder rung.
April 3rd - Easter log -
2018e-32 -
More capping. "No progress".
April 4th - Easter log -
2018e-32
July 17th - summer log -
2018s-06 -
Capped flake in p4 that divides pitch.
July 19th - summer log -
2018s-06 -
More work at pitch.
July 21st - summer log -
2018s-07 -
Heavy rain the previous day had washed out entrance and moved boulders and capping gear.
Down p4 to next p5.
July 23rd - summer log -
2018s-07 -
Capped very narrow and awkward p5.
Horrible conditions.
July 24th - summer log -
2018s-07 -
Down p5 to find chamber where water drains away.
Crawl above p3 may continue.
August 21st - summer log -
2018s-59 -
Survey data received as Word doc table.
L=56.3 d=35m
September 28th - autumn log -
2018a-15 -
End of passage at head of 4th pitch examined.
Lots of work required.
October 3rd - autumn log -
2018a-16 -
Crawl below 3rd pitch to boulder choke @ T-junction. Dug.
At end of crawl, floor slopes to roof.
Draught seems to go down slot in floor.
Survey.
Cave cleared.
Published documents: print and digital