MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#4669 Dron, Torca del
S Vega - 30T 0452097 4794840 Altitude: 452m - Length: 593m Depth: 167m
Website description for site 4669   |   Site in context, area map

Dated logbook entries with card index notes

2018

March 22nd - Easter log - 2018e-01 - Covered with branches.
March 24th - Easter log - 2018e-02 - Partly uncovered causing a collapse. This heard underground in 4668.
March 25th - Easter log - 2018e-02 - Descended p10 to chamber with slope down to 2 pitches. (1) -12m (2) -8m Needs more ladder.
March 26th - Easter log - 2018e-03
March 30th - Easter log - 2018e-09 - Down to base of entrance pitch. Streamway closes in but side passage in roof leads to top of estimated p40. Good draught.
April 1st - Easter log - 2018e-13; 2018e-14 - Pitch rigged. Rope too short. Estimated 85m. Passages seen on the way down.
April 3rd - Easter log - 2018e-19; 2018e-25; 2018e-26 - (1) Pitch dropped (80m est) to another pitch series that closes in. (p15 + p34m) (2) 15m up big pitch, rift leads off to the R. (Needs bolt to enter. L is possible climb up to horse-sized passage). TL=220m+est 80m for the pitch. d~150m
April 5th - Easter log - 2018e-44; 2018e-45 - Pushed side passages on big pitch. Higher level "Mr Humphries Floor" surveyed and pushed to a dig. Other leads / levels still to check. Batches 01, 02,03 total = 475m including unsurveyed p80 d=167m
July 29th - summer log - 2018s-12
August 27th - summer log - 2018s-62

2019

April 22nd - Easter log - 2019e-37; 2019e-38 - Way found under lintels. Large boulder removed. Passage @ head of main pitch investigated.
April 23rd - Easter log - 2019e-40 - Dropped p20 to another 4 second drop est. @ 80m. Not surveyed.
April 26th - Easter log - 2019e-48 - Grid installed over bottom end.
August 13th - summer log - 2019s-35; 2019s-36 - Photo trip - 5 people. Visits to various places not pushed. Old ropes left in situ.

2021

August 14th - summer log - 2021s-43; 2021s-44 - Traverse @ pitch head explored. Possible leads to do. Photo.

2022

August 7th - summer log - 2022s-26; 2022s-27 - Trip to dig @ end of draughting bedding. (Actually sediment-filled phreatic passage) About 10m dug. Still going.

2023

April 10th - Easter log - 2023e-33 - Down pitch in His + Hers > p8 - 10 after flowstone ramp p6 then 10m passage to p6 into a possible chamber.
April 11th - Easter log - 2023e-48 - Pushed and surveyed. Batch 23-01 L=94m From Survex log: TL = 593m d=168m

Published documents: print and digital