March 22nd - Easter log -
2018e-01 -
Covered with branches.
March 24th - Easter log -
2018e-02 -
Partly uncovered causing a collapse.
This heard underground in 4668.
March 25th - Easter log -
2018e-02 -
Descended p10 to chamber with slope down to 2 pitches.
(1) -12m (2) -8m
Needs more ladder.
March 26th - Easter log -
2018e-03
March 30th - Easter log -
2018e-09 -
Down to base of entrance pitch. Streamway closes in but side passage in roof leads to top of estimated p40.
Good draught.
August 27th - summer log -
2018s-62
April 22nd - Easter log -
2019e-37;
2019e-38 -
Way found under lintels.
Large boulder removed.
Passage @ head of main pitch investigated.
April 23rd - Easter log -
2019e-40 -
Dropped p20 to another 4 second drop est. @ 80m. Not surveyed.
April 26th - Easter log -
2019e-48 -
Grid installed over bottom end.
August 13th - summer log -
2019s-35;
2019s-36 -
Photo trip - 5 people.
Visits to various places not pushed.
Old ropes left in situ.
August 14th - summer log -
2021s-43;
2021s-44 -
Traverse @ pitch head explored.
Possible leads to do. Photo.
August 7th - summer log -
2022s-26;
2022s-27 -
Trip to dig @ end of draughting bedding. (Actually sediment-filled phreatic passage)
About 10m dug. Still going.
April 10th - Easter log -
2023e-33 -
Down pitch in His + Hers > p8 - 10 after flowstone ramp
p6 then 10m passage to
p6 into a possible chamber.
April 11th - Easter log -
2023e-48 -
Pushed and surveyed. Batch 23-01 L=94m
From Survex log: TL = 593m d=168m