October 26th - autumn log -
2017a-04 -
Large shakehole. 5m Ø shaft used as a rubbish tip.
Explored to end of 52m rope.
Passage descends in rift 4m wide @ entrance, 1m wide @ base of rubbish heap.
3 pitches, about 10m long, leads to narrow canyon climb down to next short pitch.
(Site 26A)
October 28th - autumn log -
2017a-05 -
Descended to chamber Ø 2.5m 8m high.
Cave continues in very small tight crawl.
Water in crawl + chamber.
Draughting. Surveyed.
? L=60 d=20??
[Actually L=94m d=59m]