Extra notes from card index
• Survey received 10/8/18
Orphan card index date references to logbook pages
• [30/12/2017] Xmas 2017: 30/12/17 Corrected data and survey.
Dated logbook entries with card index notes
2017
October 18th - autumn log -
2017a-02 -
Walk-in rift cave. Explored ~60m with pitches.
Stopped by awkward traverse.
October 21st - autumn log -
2017a-03 -
Some surveying. Not easy with difficult traversing in the roof.
10 pitches descended all blind.
Work at a cross rift continues.
October 25th - autumn log -
2017a-04 -
RHS of T-junction. Over 2nd pitch to a tight section.
LH arm is similar.
Thin person required. RH arm draughts well.
L=266.7m d=25m
2018
April 11th - Easter log -
2018e-71 -
Bolted from inlet @ present mid-point for 20m.
Crossed pitch @ unknown depth.
Traverse ends at block in passage.
Way on could be easier.
April 16th - Easter log -
2018e-74 -
Pitch crossed descended, 10m deep.
Water seen; too tight in both directions.
Passage at top too tight in SRT kit.
Way on may be down at or near the main junction.
Digging at main junction into visible chamber in floor. Ran out of battery.
April 17th - Easter log -
2018e-74 -
Derigged back to descent after first traverse.
Dig through to chamber + another seen through crack.
Flowing stream and good draught.
April 20th - Easter log -
2018e-76 -
Chamber entered via p3. Water flows across.
Postulated no deep, large cave system to find.
Derigged. Aggressive environment towards Al hangers.
Published documents: print and digital