Extra notes from card index
• L83: -back
• L02: 4 - 8/8/02 Number of trips. Mainly digging @ Cefrales end.
141.7m surveyed in SSA side passage.
49m surveyed in Western side.
22.9m surveyed in link passage
106.8m surveyed in Cefrales area.
L=320m TL=1368m
• Series of finds by the Danes 671m
TL=2027m
Orphan card index date references to logbook pages
• [30/12/1998] Survface survey to 457. See Cefrales (42) file. Entrance coords not altered because of this.
• [27/03/2002] Series of explorations (Danes included)
L=111.4 in shafts
• [17/04/2003] Pitches explored (not surveyd)
• [04/08/2009] Small extensions.
• [08/08/2009] 184m surveyed. TL=2211m
Dated logbook entries with card index notes
1983
April 11th - Easter log -
1983e-18;
1983e-19 -
Found and part explored. Draughts.
p24 Down to head of very tight pitch. D-23m?
April 12th - Easter log -
1983e-24;
1983e-25
January 1st - summer log -
1983s-76
1998
July 31st - summer log -
1998s-05;
1998s-06;
1998s-07 -
Relocated and re-explored.
August 2nd - summer log -
1998s-08;
1998s-08
2000
April 19th - Easter log -
2000e-07;
2000e-08 -
Slot at bottom needs long chisel or chemical persuasion.
Explored to top of 40m? pitchTL=24.2m d=14m
2001
January 1st - Whit log -
2001w-02;
2001w-04
June 1st - Whit log -
2001w-04 -
Excavated (Hilti) at tight section. Now wide open?
July 29th - summer log -
2001s-09;
2001s-09;
2001s-10 -
Explored part way down p2.
July 30th - summer log -
2001s-14;
2001s-15 -
Down p2 and into passage. Surveyed 333m
August 1st - summer log -
2001s-19;
2001s-20 -
Extensions. d=118m TL=520m
August 6th - summer log -
2001s-26;
2001s-27 -
Sherwood Forest extension surveyed. 190.4m
TL=711m d=118m
2002
March 30th - Easter log -
2002e-14;
2002e-15 -
Slip Sliding Away to nearly joining with Cefrales.
TL=256 + 711 = 967m
March 31st - Easter log -
2002e-14;
2002e-14
August 3rd - summer log -
2002s-10
2003
April 14th - Easter log -
2003e-02 -
Digging at Dofrades 'link'.
April 19th - Easter log -
2003e-11 -
Pitches explored (not surveyd)
July 29th - summer log -
2003s-10
2009
May 17th - summer log -
2009s-36
May 18th - summer log -
2009s-36
May 19th - Whit log -
2009w-01
May 20th - summer log -
2009s-36
May 25th - Whit log -
2009w-05
August 9th - summer log -
2009s-43
2013
March 31st - Easter log -
2013e-14;
2013e-26;
2013e-27;
2013e-32 -
Overnight trip.
Various small extensions made but could't be surveyed due to DistoX failure after 59m fall.
April 1st - Easter log -
2013e-26;
2013e-27;
2013e-32 -
Various small extensions made but could't be surveyed due to DistoX failure after 59m fall.
24hr radon count 1400Bq/m³
2014
May 10th - Easter log -
2014e-54
2015
August 10th - summer log -
2015s-43 -
From G Earth 0450778 4795109
Not checked in the field.
Published documents: print and digital
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p18 - Summary and photo
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p15 - Summary
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p13 - Summary
• [FM]
Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p22
• [FN]
Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p16 - Summary. Still not connected either with the SVS or Juan Lombrero.