#4536 Sub-phone entrance
Riaño - 30T 0451666 4800704 Altitude: 171m
Website description for site 4536   |   Site in context, area map

Extra notes from card index
• For trips into Llanío, see 3234.
• L19S: Joined with Cueva de Riaño. See 3234.

Orphan card index date references to logbook pages
• [12/07/2021] Entrance cleared out.
• [27/03/2024]
• [11/08/2025]

Dated logbook entries with card index notes

2017

April 18th - Easter log - 2017e-29; 2017e-30; 2017e-31 - Sub-phone on road and in depression. Underground set packed up.
April 19th - Easter log - 2017e-35 - Molephone directly over the above site. Digging.
April 28th - Easter log - 2017e-42 - Digging. Tripod set up. Long drill appeared to go into "space".
July 23rd - summer log - 2017s-03 - Digging. Now 2.2m deep with small draughting hole at base.
July 25th - summer log - 2017s-05 - More digging. Draughting hole.
July 26th - summer log - 2017s-06 - More digging. Rock removed. Still too tight.
July 28th - summer log - 2017s-09 - Opened up. Very tight but Torben in to verify connection. Had to be pulled out.
July 30th - summer log - 2017s-12; 2017s-13 - More capping and snappers. Survey surface and down drop to station 3234-17-03.106 L of drop down is 6.55m 7m added to 3234. Length of this is 0m
July 31st - summer log - 2017s-15 - Shale bed makes digging difficult.
August 1st - summer log - 2017s-17
August 2nd - summer log - 2017s-21 - Jack hammer and generator ised to open up entrance. See 3234 for continuation.
August 4th - summer log - 2017s-26
August 16th - summer log - 2017s-46; 2017s-47 - Check dimensions etc for stabilising entrance. Diagrams of possibilities.
August 18th - summer log - 2017s-51 - More dimension checking after plastic tube bought.
August 19th - summer log - 2017s-52 - Enlarging hole to fit tube.
August 21st - summer log - 2017s-53 - Tube in.
August 23rd - summer log - 2017s-53 - Foaming / back-fill.
August 24th - summer log - 2017s-53 - Cover made; more collar preparations.
August 25th - summer log - 2017s-53 - Concrete collar installed.
August 29th - summer log - 2017s-56 - Completed. Steps in and soil around top.

2018

April 1st - Easter log - 2018e-15 - Drone video over entrance.

2019

August 16th - summer log - 2019s-44
August 22nd - summer log - 2019s-52

2021

July 11th - summer log - 2021s-02

2023

April 4th - Easter log - 2023e-08 - Entrance cleared.

2025

August 13th - summer log - 2025s-62
September 11th - summer log - 2025s-65; 2025s-66

2026

March 31st - Easter log - 2026e-10
July 26th - summer log - 2026s-06
August 2nd - summer log - 2026s-13; 2026s-14

Published documents: print and digital

• [KL] Corrin Juan et al, 2025 Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161 (area map + photos)
• [KP] Redder Torben and Korsgaard Louise, 2025 La Exploración de la cueva Llanío Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• p158 - La Exploración de la cueva Llanío. Boletín Cántabro de Espeleología, 18. p158