MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#4474 shaft
Moncobe - 30T 0445522 4797834 Altitude: 165m - Length: 548m Depth: 33m
Website description for site 4474   |   Site in context, area map

Dated logbook entries with card index notes

2016

August 2nd - summer log - 2016s-58 - Strongly draughting hole found at head of small rock gully.
August 3rd - summer log - 2016s-58 - Excavations. Looks promising.
August 4th - summer log - 2016s-58 - Very large boulders. p7 found unexplored. Bolts required.
August 5th - summer log - 2016s-58; 2016s-59 - Gardening. Pitch is tight part way down. Needs unblocking.
August 7th - summer log - 2016s-59
November 8th - autumn log - 2016a-06 - Pitch obstruction partly removed. Possible routes at base found.
November 10th - autumn log - 2016a-06 - 2 possible ways on.
November 11th - autumn log - 2016a-06
November 12th - autumn log - 2016a-07
November 13th - autumn log - 2016a-07 - Shown to Miguel of the Pistruellos group.
November 15th - autumn log - 2016a-07 - Draught chasing with joss sticks. Drop descended to possible leads. All need work.
November 29th - autumn log - 2016a-08 - GPS readings

2017

April 19th - Easter log - 2017e-37 - 3 possibilities all draughting into the known passage.
April 20th - Easter log - 2017e-38 - Surveyed. Draught checking.
April 21st - Easter log - 2017e-38 - (1) Narrow section to 12m passage temporarily ending @ flake with passage beyond. (2) Tight draughting rift pushed @ 45°. Way on is down with loose walls and rocks.
April 22nd - Easter log - 2017e-38 - (1) above cleared of flake into series of chambers / large passage with roof formations ending at a tight section. Draughting. New section surveyed.
September 29th - autumn log - 2017a-06 - Big passage with tight end capped into low, open area with draught coming down very narrow rift in roof.
September 30th - autumn log - 2017a-06 - Rift pusged @ top of p to lower levels. p8 reached ledge with blocks. Further work needed.
October 1st - autumn log - 2017a-06 - (i) Bedding plane is 29/9 area attacked but is sand and boulder material. (ii) Also worked at roof slot.
October 5th - autumn log - 2017a-06; 2017a-07 - Further digging in bedding plane to open space to the right. Meets passage @ right angles but both directions have boulders that can be capped.
October 11th - autumn log - 2017a-07 - (i) Progress made to shaft (undescended) and well decorated continuation beyond. Draughts. Photo taken. (ii) Slot in roof investigated for capping. Cave cleared.

2018

July 29th - summer log - 2018s-11 - Capped p top at end leads to p10 and 10-15m high gallery. Holes in floor not descended. Possible continuation at roof level needs aids. Good draught.
July 30th - summer log - 2018s-11 - Capped p top at end leads to p10 and 10-15m high gallery. Holes in floor not descended. Possible continuation at roof level needs aids. Good draught.
August 21st - summer log - 2018s-59 - Survey data received as Word doc table. L=197.8m d=20m
September 29th - autumn log - 2018a-15 - Down narrow rift and pitch to check all possibilities and survey big passage. (1) Back under rift crawl for 3 or 4m to draughting, low continuation, requires digging. (2) At other end of large passage, under climb down below ladder p, the low level way on becomes hopeless after 2m. No draught. (3) At base of ladder level, narrow rift entered but ended after a few metres at a vertical wall of debris. (4) Opening up some sections.
October 4th - autumn log - 2018a-16 - To section at RH corner of big passage. No open passage at top of steep sand slope. Below climb, route behind boulders goes to lower level and larger passage sloping down to narrow vertical section with draught. Partway down chamber is a draughting low way towards a possible enlargement. Also possible continuation seen up roof slot in main passage.
October 5th - autumn log - 2018a-16 - Returned to slot. Dug underneath leaving broken roof and a draughting space on the right.
October 8th - autumn log - 2018a-17 - (1) Continued dig under slot - progress made. (2) Low passage excavated with spade. Enlargement reached but after 4m fill sloped up to the roof. Awkward digging spot. Photos.
October 10th - autumn log - 2018a-17; 2018a-18 - Digging at slot. Spoil moved. Up slot into a few metres of low passage. Boulders. Lower routes close in. Called Bother Chamber
October 12th - autumn log - 2018a-18 - Surveying. Photos. Possible route on from chamber - now called "Bother Squared Chamber"

2019

April 13th - Easter log - 2019e-66 - Push end of big passage.
April 14th - Easter log - 2019e-67 - (i) New passage @ base of first pitch. (ii) Digging in sand following draught in low level passage below tight rift. (iii) At end: enlarging. Still good draught.
April 15th - Easter log - 2019e-16 - Should be called "Now't But Obstacles" Photos from PPa.
April 16th - Easter log - 2019e-67 - (i) To new passage @ base of 1st pitch.
April 17th - Easter log - 2019e-67 - Sandy dig and survey.
April 19th - Easter log - 2019e-67 - Push and survey far end of main passage. Chest height hole blocked. Sandy dig to enlargement. Surveyed.
April 20th - Easter log - 2019e-35; 2019e-35; 2019e-67; 2019e-67 - See entry on card 6.
April 25th - Easter log - 2019e-68 - Richard's "echo passage" dug but very awkward and small - then too small. Entrance p cleared of ladder and line.
June 16th - Whit log - 2019w-09 - (1) Push @ end but not able to continue from final chamber. (2) Calcite blockage removed in low passage leading out of the aven. Adjacent floor lowered. More work required in both locations.

Published documents: print and digital