MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0415 415
La Secada - 30T 0451200 4797512 Altitude: 255m - Length: 1137m Depth: 64m
Website description for site 0415   |   Site in context, area map

Extra notes from card index
• L82 - middle. Description.
• L84 1st page Pitches and sketch
• L=584m d=30m
• L98E Shaft in rift in final chamber descnded for 12m

Orphan card index date references to logbook pages
• [02/08/1981] Found?
• [11/08/1981] Found?
• [14/04/1993] Some new passage? (Helictite Passage)
• [27/07/1993] P at R of end chamber dropped to small amount of passage.
• [22/08/1994] Detackling trip.
• [12/08/1999] See log book for description of "150ft pitch"
• [06/04/2009] Surveying + some pushing
• [09/08/2014] Part resurvey + tourist trip
• [05/01/2015] Survey checkout. Probable resurvey in 2015

Dated logbook entries with card index notes

1982

January 1st - summer log - 1982s-78

1984

January 1st - summer log - 1984s-01; 1984s-02

1985

July 30th - summer log - 1985s-16 - Marked "415" orange tape
August 4th - summer log - 1985s-29; 1985s-30 - Grovel, Simon following draught to tight squeeze. Needs surveying.
August 5th - summer log - 1985s-39 - Liz, Lank, Grov, Juan. Extend to large chamber + passage ending in breakdown. L=350m. Leads stil to push
August 6th - summer log - 1985s-39 - High levels found + pitches.
August 7th - summer log - 1985s-39 - Further passage found + pitch partly descended.
August 8th - summer log - 1985s-41 - Pitches only partly descended.
August 9th - summer log - 1985s-47 - Pitch descended + rift passage entered. SKETCH
August 11th - summer log - 1985s-52; 1985s-53 - Pitches descended. List of pitches.
August 12th - summer log - 1985s-58 - Pitch descending. High level route surveyed.

1986

July 28th - summer log - 1986s-43 - Poking about. Shaft needs confirming that it is one from last year.
August 10th - summer log - 1986s-91 - Bolt in + traverse line.
August 11th - summer log - 1986s-93
August 15th - summer log - 1986s-A0 - Poking about.

1987

August 5th - summer log - 1987s-31 - Poking about.
August 7th - summer log - 1987s-40; 1987s-49 - Dig started by DCC + poking about.
August 8th - summer log - 1987s-54
August 9th - summer log - 1987s-43; 1987s-49; 1987s-50 - Pitch up tube partly descended. Account later as well - on 11/8/87
August 10th - summer log - 1987s-50 - Pitch not finished

1989

January 1st - summer log - 1989s-00
August 4th - summer log - 1989s-52; 1989s-53 - Descent of 150ft pitch to too tight 3" slot. Aven seen on left of phreatic tube.

1990

August 12th - summer log - 1990s-23 - Entrance filled with boulders - but easily dug out.

1993

January 1st - summer log - 1993s-08
July 23rd - summer log - 1993s-02; 1993s-02; 1993s-03; 1993s-03 - Helictite Passage opened up (79m) Cave length = 908m
July 29th - summer log - 1993s-17; 1993s-17; 1993s-40; 1993s-41 - Photo + video teams in.

1994

April 4th - Easter log - 1994e-21
April 14th - Easter log - 1993e-25; 1993e-26
August 8th - summer log - 1994s-37

1996

April 4th - Easter log - 1996e-19
August 4th - summer log - 1996s-18

1997

April 5th - Easter log - 1997e-10
April 7th - Easter log - 1997e-10

1998

January 1st - Xmas - New Year log - 1997c-05
April 7th - Easter log - 1998e-03
April 9th - Easter log - 1998e-11
April 13th - Easter log - 1998e-24
May 24th - Whit log - 1998w-01

1999

April 3rd - Easter log - 1999e-13
August 9th - summer log - 1999s-35 - tourist trip

2000

August 12th - summer log - 2000s-38

2001

April 10th - Easter log - 2001e-09; 2001e-15 - To top of "150ft" pitch
April 12th - Easter log - 2001e-15 - Part way down.
April 13th - Easter log - 2001e-15 - Bottom @ 4th pitch -69m altitude 196m Surveyed 93m TL=1001m d=69m
August 9th - summer log - 2001s-31 - GPS entrance + photo

2002

January 1st - Xmas - New Year log - 2001c-08

2004

August 7th - summer log - 2004s-29
August 13th - summer log - 2004s-33

2009

April 5th - Easter log - 2009e-09 - Recce and photos.
April 14th - Easter log - 2009e-39 - Pushing helictite passage to too tight. But appears to widen beyond.
August 6th - summer log - 2009s-37 - Digging out end of Helictite Passage. About 40m entered, well decorated. Photos. Continues. Stal needs smashing. Not surveyed.
August 9th - summer log - 2009s-42; 2009s-43 - Digging out end of Helictite Passage. About 40m entered, well decorated. Photos. Continues. Stal needs smashing. Not surveyed.
August 11th - summer log - 2009s-47; 2009s-48 - Surveyed Helictite extensions. L=28m L=1029m? (New found at Easter?) Jason survey?

2012

April 6th - Easter log - 2012e-25

2014

January 5th - Xmas - New Year log - 2014c-02
August 5th - summer log - 2014s-31

2015

August 1st - summer log - 2015s-19 - Resurvey from entrance up to junction toward pitches.
August 4th - summer log - 2015s-22 - Carry on resurvey 0415-2025-2
August 9th - summer log - 2015s-42 - Resurveying. Dropped 'wire pitch'. Batches 15-03 to 15-06

2016

February 24th - Jan-Feb log - 2016jf-01

2017

April 17th - Easter log - 2017e-28 - More work on the resurvey.
August 1st - summer log - 2017s-18 - More work: p4 checked out. u/g survey finished. Drawing up now.
August 7th - summer log - 2017s-33 - Photo trip and a bit of surveying.
August 10th - summer log - 2017s-38 - Total length 1137m
August 17th - summer log - 2017s-51

2024

August 12th - summer log - 2024s-76 - Checking "?" for final survey.

2025

February 10th - Xmas- New Year log - 2024c-31

Published documents: print and digital

• [G] Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions
• p39 - Account PL=50 d=10
• [N] Corrin J, 1986 Matienzo '85 Caves & Caving 32, May 1986
• p15 - Resumé. On area survey.
• [BB] Corrin J and Knights S, 1988 Matienzo 1987 Caves & Caving 41, Autumn 1988
1987 summary
• [DE] Neill Alasdair and Jackson Keith, 1993 Matienzo '93 Plymouth Caving Group Newsletter and Journal, No. 119, Winter 93- 94
• p6 - trip
• [BZ] Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
• p25 - Summary
• p27 - On section.
• [CU] Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p67 - Summary
• [EP] Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p17 - Summary
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p38 - Mention in Spanish summary article
• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p14 - photos
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• p523 - History; line survey; photos
• p15 - 400m from NVS and 200m from west end of Bollón.
• [KL] Corrin Juan et al, 2025 Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161 (area map + photos)