1982
January 1st - summer log -
1982s-78
1984
January 1st - summer log -
1984s-01;
1984s-02
1985
July 30th - summer log -
1985s-16 -
Marked "415" orange tape
August 4th - summer log -
1985s-29;
1985s-30 -
Grovel, Simon following draught to tight squeeze. Needs surveying.
August 5th - summer log -
1985s-39 -
Liz, Lank, Grov, Juan. Extend to large chamber + passage ending in breakdown. L=350m. Leads stil to push
August 6th - summer log -
1985s-39 -
High levels found + pitches.
August 7th - summer log -
1985s-39 -
Further passage found + pitch partly descended.
August 8th - summer log -
1985s-41 -
Pitches only partly descended.
August 9th - summer log -
1985s-47 -
Pitch descended + rift passage entered. SKETCH
August 11th - summer log -
1985s-52;
1985s-53 -
Pitches descended. List of pitches.
August 12th - summer log -
1985s-58 -
Pitch descending. High level route surveyed.
1986
July 28th - summer log -
1986s-43 -
Poking about. Shaft needs confirming that it is one from last year.
August 10th - summer log -
1986s-91 -
Bolt in + traverse line.
August 11th - summer log -
1986s-93
August 15th - summer log -
1986s-A0 -
Poking about.
1987
August 5th - summer log -
1987s-31 -
Poking about.
August 7th - summer log -
1987s-40;
1987s-49 -
Dig started by DCC + poking about.
August 8th - summer log -
1987s-54
August 9th - summer log -
1987s-43;
1987s-49;
1987s-50 -
Pitch up tube partly descended.
Account later as well - on 11/8/87
August 10th - summer log -
1987s-50 -
Pitch not finished
1989
January 1st - summer log -
1989s-00
August 4th - summer log -
1989s-52;
1989s-53 -
Descent of 150ft pitch to too tight 3" slot. Aven seen on left of phreatic tube.
1990
August 12th - summer log -
1990s-23 -
Entrance filled with boulders - but easily dug out.
1993
January 1st - summer log -
1993s-08
July 23rd - summer log -
1993s-02;
1993s-02;
1993s-03;
1993s-03 -
Helictite Passage opened up (79m)
Cave length = 908m
July 29th - summer log -
1993s-17;
1993s-17;
1993s-40;
1993s-41 -
Photo + video teams in.
1994
April 4th - Easter log -
1994e-21
April 14th - Easter log -
1993e-25;
1993e-26
August 8th - summer log -
1994s-37
1996
April 4th - Easter log -
1996e-19
August 4th - summer log -
1996s-18
1997
April 5th - Easter log -
1997e-10
April 7th - Easter log -
1997e-10
1998
January 1st - Xmas - New Year log -
1997c-05
April 7th - Easter log -
1998e-03
April 9th - Easter log -
1998e-11
April 13th - Easter log -
1998e-24
May 24th - Whit log -
1998w-01
1999
April 3rd - Easter log -
1999e-13
August 9th - summer log -
1999s-35 -
tourist trip
2000
August 12th - summer log -
2000s-38
2001
April 10th - Easter log -
2001e-09;
2001e-15 -
To top of "150ft" pitch
April 12th - Easter log -
2001e-15 -
Part way down.
April 13th - Easter log -
2001e-15 -
Bottom @ 4th pitch -69m altitude 196m Surveyed 93m
TL=1001m d=69m
August 9th - summer log -
2001s-31 -
GPS entrance + photo
2002
January 1st - Xmas - New Year log -
2001c-08
2004
August 7th - summer log -
2004s-29
August 13th - summer log -
2004s-33
2009
April 5th - Easter log -
2009e-09 -
Recce and photos.
April 14th - Easter log -
2009e-39 -
Pushing helictite passage to too tight. But appears to widen beyond.
August 6th - summer log -
2009s-37 -
Digging out end of Helictite Passage. About 40m entered, well decorated. Photos. Continues. Stal needs smashing. Not surveyed.
August 9th - summer log -
2009s-42;
2009s-43 -
Digging out end of Helictite Passage. About 40m entered, well decorated. Photos. Continues. Stal needs smashing. Not surveyed.
August 11th - summer log -
2009s-47;
2009s-48 -
Surveyed Helictite extensions. L=28m L=1029m? (New found at Easter?)
Jason survey?
2012
April 6th - Easter log -
2012e-25
2014
January 5th - Xmas - New Year log -
2014c-02
August 5th - summer log -
2014s-31
2015
August 1st - summer log -
2015s-19 -
Resurvey from entrance up to junction toward pitches.
August 4th - summer log -
2015s-22 -
Carry on resurvey 0415-2025-2
August 9th - summer log -
2015s-42 -
Resurveying. Dropped 'wire pitch'.
Batches 15-03 to 15-06
2016
February 24th - Jan-Feb log -
2016jf-01
2017
April 17th - Easter log -
2017e-28 -
More work on the resurvey.
August 1st - summer log -
2017s-18 -
More work: p4 checked out.
u/g survey finished. Drawing up now.
August 7th - summer log -
2017s-33 -
Photo trip and a bit of surveying.
August 10th - summer log -
2017s-38 -
Total length 1137m
August 17th - summer log -
2017s-51
2024
August 12th - summer log -
2024s-76 -
Checking "?" for final survey.
2025
February 10th - Xmas- New Year log -
2024c-31
• [KL] Corrin Juan et al, 2025
Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161
(area map + photos)