Dated logbook entries with card index notes
1982
August 21st - summer log -
1982s-50;
1982s-51 -
Exploration with description and sketch after Portienzo explored on 11/8/82.
1990
August 15th - summer log -
1990s-34
2001
April 18th - Easter log -
2001e-47 -
Pot (previously excavated by ?) found just inside the entrance on right. Warm inside. Needs re-exploring + surveying.
April 20th - Easter log -
2001e-47 -
Pot recovered. Other pieces found.
May 27th - Whit log -
2001w-01;
2001w-02 -
Explored, surveyed. Still to push: hole over top of p1; holes down to the right of p1; crawl in stal chamber; crawl where water goes at base of p2.
L=99m d=-22m
June 2nd - Whit log -
2001w-05 -
Bolt in floor-less tube and scramble over to tube above p1. Chokes up after 15m.
August 3rd - summer log -
2001s-21 -
Over p1 into passage heading W over holes.
August 4th - summer log -
2001s-23
August 5th - summer log -
2001s-23 -
To top of descending p. Surveyed 86m
TL=184.8m
August 6th - summer log -
2001s-27
August 9th - summer log -
2001s-33 -
Down Ledge Pot and dig out.
Surveyed 71m TL=255.9m d=-32m
August 10th - summer log -
2001s-34;
2001s-35 -
Lots of photos. Down to big ledge with 40-50m? below.
August 12th - summer log -
2001s-37 -
Hoe Down pitch bottomed. Tight meanders @ bottom but possibilities exist on the way down.
TL=350.7m d=120.4m
August 14th - summer log -
2001s-39 -
Pushed bits Hoe Down which rejoined main p.
Base meanders pushed to top of 40m p to be dropped.
August 15th - summer log -
2001s-40 -
Tackle list in log book. Add in 1679 length 71m and connecting aven / pit ~10m
351 + 81 =TL=432m d=120.4
2002
January 1st - Xmas - New Year log -
2001c-08
March 26th - Easter log -
2002e-04 -
Snail Inlet pushed above Hoe Down.
TL=83+432 = 515m
March 27th - Easter log -
2002e-08 -
Down meanders and drop pitch.
TL=85+515 = 600m d=-148m
March 31st - Easter log -
2002e-14
2004
August 14th - summer log -
2004s-41
October 29th - autumn log -
2004a-08
2025
July 30th - summer log -
2025s-18 -
Re-exploration. Rebolted. Entrance full of brambles.
August 1st - summer log -
2025s-67 -
No leads at base. No capping leads.
August 3rd - summer log -
2025s-67 -
Traverse over top of final pitch - too tight.
Cave derigged.
Published documents: print and digital
• [G]
Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions • p38 - Account. PL=50 D=30m
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p19 - Summary and photos (4)
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p15 - Summary. Survey.
• [ER]
Ruiz Cobo Jesús and Smith Peter, 2003 La Cueva de Cofresnedo en el Valle de Matienzo Actuaciones Arqueológicas 1996 - 2001 • p40 - Mention
• p41 - Photo vase.• p157 - Drawing of vase.
• [FH] Ruiz Cobo Jesús et al, 2008
Entre La Marina y La Montaña Arqueología del Medio Asón (Cantabria, España) BAR International Series 1799
• p132 - mention
• p141 - in table of pottery• p146 - drawing of reconstructed pot.• p209 - Summary of arch.• p231 - Survey
• [GX]
Ruiz Cobo Jesús, 2016b La prospección arqueológica del medio Asón: municipios de Ampuero, Rasines y flanco occidental de Ruesga Actuaciones Arqueológicas en Cantabria. 2004 - 2011. Editor Gustavo Sanz Palomera. Gobierno de Cantabria. Consejería de Educación, Cultura y Deporte, 2016
• pp316-320 - Mention in table and summary of finds documented in 2004