Extra notes from card index
• November 2025: Survex file to hand
L=108m d=38m
• Jan 2016 Survey from Phil Goodwin.
• September 2017: Inkscape survey from Phil Goodwin.
Dated logbook entries with card index notes
2014
August 4th - summer log -
2014s-37 -
Grey 150mm pipe runs into large depression.
Descent between boulders by pipe.
Possible continuation.
Very good draught.
November 21st - autumn log -
2014a-07 -
Start dig @ entrance. Got to top of large shaft.
November 22nd - autumn log -
2014a-07 -
p17 to 30m of walking and scrambling to large breakdown chamber.
At end: p8 to large boulder blockage. Good draught.
Surveyed @ Easter 2015?
2015
September 25th - autumn log -
2015a-03 -
Surveyed.
Descended pitch - choked at base.
L=111m
2016
October 29th - autumn log -
2016a-03 -
Intended capping site was washed out. Tight climb down a short rift.
Left, climb down into small chamber.
another climb down into large chamber in boulders and a slope down to another chamber. At base a narrow trench in sandy rock but need a thin person to progress.
Good draught.
Estimate L=30m d=20m of extension.
2017
April 16th - Easter log -
2017e-45 -
Excavated into chamber 3 x 4 x 5m high.
Way on choked. Surveyed.
Flood debris 2m up in final chamber.
April 27th - Easter log -
2017e-42 -
New length of file = 140m
New this Easter = 32m
Published documents: print and digital