March 24th - Easter log -
2016e-16 -
Line through duck installed.
August 3rd - summer log -
2016s-40 -
Looking at depressions above this site.
Nothing found.
August 16th - summer log -
2016s-50;
2016s-51 -
Other sump dived. Sketch. Colin Hayward.
Original survey - sump position wrong. Survey redrawn.
February 5th - Jan-Feb log -
2018jf-09 -
OBA detectors placed in flood water from 4046 (Canastrillas); 3282 Santa Juliana; 3316 (resurgence N of Ruchana lower entrance). OBA put into sink about 8m away from site 4052 - sink 4658.
February 6th - Jan-Feb log -
2018jf-09 -
6/2/18 Detectors removed and replaced from sites 3282, 3316 and 4046.
Positive result from 3282.