Extra notes from card index
• At 5/8/14 Batches 1 to 30 total 3986m but there is probably some duplication
• See 4042
• El registro arqueológico del valle de Miera. J. Ruiz Cobo, E. Muñoz Fernández (Directores). Bar International Series 2542. 2013 Archaeopress Oxford.
Orphan card index date references to logbook pages
• [10/08/2014] Surface survey around Rio cueva entrances.
Entrance at 0443552 4805709 ^55
Dated logbook entries with card index notes
2014
April 29th - Easter log -
2014e-52 -
Guess position from coords in Cuevas de Cantabria volume 1.
L=3113m d=35?
May 15th - Easter log -
2014e-54 -
GPS of near entrance is 443547 4805708
Calc. top of pitch (at notch) is
443546 4805707 [X crossed out]
Pete and Juan survey Galería del Yeso
New survey TL = 767m
May 31st - Easter log -
2014e-56
July 17th - summer log -
2014s-02 -
1: End of Yeso opened up to about 10m. Low passage closes in ~10m not surveyed.
2: Hole near end goes to stream. Up and downstream appear low. Batch14-02 29.4m 3: Few metres back towards entrance, hole on left goes to carbide 'STOP'. Excavated through to small continuation. Batch 14-03 32.9m.
4: Flat out crawl on left excavated and drop into stream. Batch 14-04 30.7m
5: Holes investigated at Stal Arrow chamber. Needs surveying.
TL = 767 + 93 = 860m
July 20th - summer log -
2014s-07 -
1: Western Loop explored with possibilities off. Batch 14-09 L=272.0m
2: Climb into Western Loop part way along Yeso Passage. Batch 14-08 L=33.7m
3: Love Heart Passage Batch 14-05 37.4m
4: Batch 14-06 L=6.6m
5: Batch 14-07 L=47.3m
TL=397+860 = 1257m
July 24th - summer log -
2014s-09;
2014s-10 -
1: Surveyed high level chambers offMabe Passage. Batch 14-15 L=301m
2: Radon @ base of entrance pitch 460 Bq/m³ day equivalent.
3: Oxbows surveyed. 14-10 19.8 14-11 20.7 4: Downstream + upstream surveyed from holes down in G. del Yeso.
14-12 125.6
14-13 165.2
5: Yellow Mac Passage 14-14 20.2
TL = 652.5 + 1257 = 1909.5m
July 27th - summer log -
2014s-11;
2014s-12;
2014s-13 -
(1) Pushing upstream. 30m aven found. Batch 16 L=225.8m. Continues.
TL=1909.5 +225.8 = 2135.3m
(2) Traverses. Old shaft entrance seen. Covered. Batch 17
TL=2135.3 + 141.3 = 2276.6m
Adjust: 2274.4m
July 28th - summer log -
2014s-15 -
Surveyed downstream from entrance pitch. Lots to do.
Batch 18 TL=421m
Adjusted = 2681.4m
August 1st - summer log -
2014s-24 -
More surveying 175m in Laboratory Passage Streamway.
August 2nd - summer log -
2014s-40 -
Explored downstream.
Emerged @ bottom entrance. Passage surveyed.
August 3rd - summer log -
2014s-26;
2014s-27;
2014s-30 -
(1) Survey in streamway at leach-infested duck. 114m mainly in streamway.
(2) Surveying downstream from S end of cave.
Upstream through low duck to climb up into new main fossil route with p down to water. 175m surveyed.
(3) Traverse bolted.
August 4th - summer log -
2014s-30 -
Surveying.
August 22nd - summer log -
2014s-68 -
Attempt to reach archaeology entrance through STOP Passage. Tight squeeze in Tembleque only allows one through. Stop Passage surveyed 78m.
October 23rd - autumn log -
2014a-01 -
Surveyed beyond end of Laboratorio 14-32
Also higher passage 14-33 45.4m
Two oxbows surveyed 14-34 52.5m
October 28th - autumn log -
2014a-02 -
Addition to 14-34 (incl above)
Bold Step Passage 14-35 + 14-36 91m
Higher level passage not surveyed. (25m)
TL = 4682m
2015
July 29th - summer log -
2015s-09 -
Downstream survey
Batch 15-01 98.0m
Batch 15-02 63.8m
TL=4682 + 161.8m = 4843.8m
August 2nd - summer log -
2015s-21;
2015s-22 -
Upstream push into high level.
Open leads.
Batch 15-03 178.5m
TL=4843.8 + 178.5 = 5022.3m
August 4th - summer log -
2015s-23;
2015s-23;
2015s-24;
2015s-24;
2015s-28;
2015s-28;
2015s-29;
2015s-29 -
Push upstream extension.
Batches 15-04 15-05 15-06
L=102.44 + 5022.3 = 5124.7m
Published documents: print and digital
• [GK] Ruiz Cobo J and Muñoz Fernández E, 2013
El registro arqueológico del valle de Miera BAR International Series 2542 Archaeopress, Oxford
• p56 - Old survey of Riocueva 4042 4043
• p56 - Resumé Recueva 4042 4043.