August 8th - summer log -
2013s-68 -
Prominent entrance with tree growing outside.
L=20m
Walking passage turns into a narrow rift.
August 10th - summer log -
2013s-68 -
Prominent entrance with tree growing outside.
L=20m
Walking passage turns into a narrow rift.
August 14th - summer log -
2013s-73 -
Extension bedding to surface noted and a steep slope down to parallel passage.
Needs a ladder.
August 15th - summer log -
2013s-80 -
Described. Part descends perhaps 15m.
Not pushed down tight rift.
August 16th - summer log -
2013s-80 -
Dig at base of pit.
August 17th - summer log -
2013s-83 -
Drill failure.
August 20th - summer log -
2013s-86 -
10m added to the length at stal blocking end.
Current end is smaller draughting hole.
Good dig.
August 22nd - summer log -
2013s-88 -
Detackle. Needs more work at the end.
April 24th - Easter log -
2014e-51 -
Muddy dig is too small.
August 6th - summer log -
2014s-39
August 7th - summer log -
2014s-42 -
Tight squeeze into final passage removed.
Capping draughting low passage leading onward from final passage.
August 8th - summer log -
2014s-42 -
Continue capping.
November 17th - autumn log -
2014a-08 -
Debris cleared. More digging but open rift passage closed down.
Higher level continuation stops.
Cave finsihed!
Surveyed out.