2013
August 8th - summer log -
2013s-64 -
Digging a limestone face off track near molephone position for Wasdale Screes.
August 9th - summer log -
2013s-67 -
More digging down to 4.5m.
August 10th - summer log -
2013s-67 -
More digging to large rocks and clay.
August 11th - summer log -
2013s-68 -
Capping boulders.
August 12th - summer log -
2013s-69 -
Down another 0.5m. Hole opened up which draughts (on cool day).
Survey to 3906 + 3905
August 13th - summer log -
2013s-71 -
More digging - more draught.
August 15th - summer log -
2013s-73 -
More digging - more draught.
August 16th - summer log -
2013s-73;
2013s-74 -
More digging - Acrows bought and used.
August 17th - summer log -
2013s-79 -
Entrance tube: double-walled 6m x 600mm "bought" for 0€ @ BigMat in Ramales.
August 18th - summer log -
2013s-81 -
Entrance measured.
2m length will do 1st section of the shaft.
August 19th - summer log -
2013s-81;
2013s-82;
2013s-83;
2013s-85 -
Digging
August 20th - summer log -
2013s-84 -
Digging
August 22nd - summer log -
2013s-86 -
Digging and shoring.
August 23rd - summer log -
2013s-86 -
Covered over.
2014
February 20th - Jan-Feb log -
2014jf-04 -
Entrance found collapsed. Covered with branches.
April 8th - Easter log -
2014e-01 -
More collapse and dead animal in it.
April 10th - Easter log -
2014e-03 -
Digging out. Calf removed.
April 11th - Easter log -
2014e-03 -
Shoring and digging.
April 13th - Easter log -
2014e-08 -
Shoring and digging.
April 15th - Easter log -
2014e-17 -
Shoring and digging.
April 16th - Easter log -
2014e-23 -
Shoring and digging.
April 19th - Easter log -
2014e-33 -
Shoring and digging.
April 22nd - Easter log -
2014e-40 -
Shoring and digging.
April 24th - Easter log -
2014e-46 -
Shoring and digging.
April 30th - Easter log -
2014e-53 -
Shoring and digging. Draught started up.
May 2nd - Easter log -
2014e-53 -
Shoring and digging. Covered over.
July 22nd - summer log -
2014s-09 -
3hrs digging.
Opened up draughting hole in floor.
July 31st - summer log -
2014s-20;
2014s-21 -
Voice, smoke, hammering, molephone, radio connections with 2889 Cow Pot, Wasdale Screes area.
August 4th - summer log -
2014s-47 -
More digging. Down in draughting rift. 2 accounts.
August 5th - summer log -
2014s-47 -
More digging. Down in draughting rift.
August 6th - summer log -
2014s-38;
2014s-47 -
More digging. Down in draughting rift.
August 8th - summer log -
2014s-44;
2014s-45;
2014s-47 -
More digging.
Smoke test from 2889.
It appears that the dig is over the left hand boulder choke (NE side of rift)
August 11th - summer log -
2014s-53 -
More digging. Left has draught. R has wall.
August 14th - summer log -
2014s-57
August 15th - summer log -
2014s-58;
2014s-59;
2014s-61;
2014s-62 -
Digging through to 2889. CONNECTION. 2 accounts.
August 17th - summer log -
2014s-63;
2014s-65;
2014s-66 -
Shuttering.
August 18th - summer log -
2014s-63 -
Concreting
August 19th - summer log -
2014s-67
August 20th - summer log -
2014s-68 -
More concrete.
Top tube in and backfill + test out.
August 24th - summer log -
2014s-70
August 25th - summer log -
2014s-70
August 26th - summer log -
2014s-70
August 27th - summer log -
2014s-71
October 25th - autumn log -
2014a-01 -
Rebar steps in entrance.
October 29th - autumn log -
2014a-02 -
Last concrete around tube and lid.
November 3rd - autumn log -
2014a-02 -
Tidy up - more soil around top.
November 10th - autumn log -
2014a-02
November 11th - autumn log -
2014a-02
November 12th - autumn log -
2014a-02;
2014a-03 -
Trips in. See 2889.
2015
March 31st - Easter log -
2015e-07;
2015e-21 -
Excavated to open up crawl.
Lots of work needed in summer.
Another account (after 6/4/15) in log.
April 1st - Easter log -
2015e-07;
2015e-22;
2015e-37
April 3rd - Easter log -
2015e-13;
2015e-14;
2015e-16
April 5th - Easter log -
2015e-19;
2015e-24
April 7th - Easter log -
2015e-28
April 12th - Easter log -
2015e-32 -
Maybe sound connection @ stn 84? just below Wasdale Screes with the Langdales, site 3034.
April 14th - Easter log -
2015e-33
April 15th - Easter log -
2015e-34
July 30th - summer log -
2015s-10;
2015s-10 -
Inspection - all OK.
August 3rd - summer log -
2015s-21 -
Tube cut but crawl too tight.
August 5th - summer log -
2015s-26;
2015s-27;
2015s-28 -
Crawl now bigger; more stable.
(2889 dug out to surface at 4182 Cuba Libre)
Tube not installed in crawl.
August 13th - summer log -
2015s-47;
2015s-48
August 27th - summer log -
2015s-52 -
Crawl opened up to take tubes.
September 2nd - summer log -
2015s-52 -
Tubes fitted in crawl.
November 11th - autumn log -
2015a-09
2016
March 12th - Easter log -
2016e-03
March 16th - Easter log -
2016e-05
March 17th - Easter log -
2016e-07
March 19th - Easter log -
2016e-08
March 24th - Easter log -
2016e-16;
2016e-17
March 31st - Easter log -
2016e-35
July 24th - summer log -
2016s-15
July 25th - summer log -
2016s-09
July 27th - summer log -
2016s-17;
2016s-17 -
Goats at entrance knock stones from wall down hole.
Cover must be over the hole at all times.
July 28th - summer log -
2016s-21
July 30th - summer log -
2016s-23;
2016s-24
August 1st - summer log -
2016s-26
August 3rd - summer log -
2016s-29
August 4th - summer log -
2016s-33;
2016s-34
August 6th - summer log -
2016s-50
August 7th - summer log -
2016s-48
December 26th - Xmas - New Year log -
2016c-01
December 28th - Xmas - New Year log -
2016c-02
December 31st - Xmas - New Year log -
2016c-02
2017
April 10th - Easter log -
2017e-07;
2017e-08
2018
December 25th - Xmas - New Year log -
2018c-02
2019
August 1st - summer log -
2019s-14
August 17th - summer log -
2019s-45
August 18th - summer log -
2019s-50
August 19th - summer log -
2019s-50
August 21st - summer log -
2019s-52
2023
November 9th - autumn log -
2023a-22