Extra notes from card index
• 31/3/15 (Not in log) Batch 15_01 surveyed to W of chamber. L=81.9m
Includes 25m dummy leg.
TL=626m
• Easter 2017. Exploration and (re)survey of side passage.
Orphan card index date references to logbook pages
• [19/11/2014] Downstream pushed for 110m in SE direction.
Formations + side chamber.
Probably diggable at the end.
Surveyed L=544m d=201m
• [30/01/2018] Ammonite found by Phil Goodwin.
Photos.
Dated logbook entries with card index notes
2013
March 23rd - Easter log -
2013e-38 -
5x2.5m entrance into 10m across chamber with hole on far side.
March 24th - Easter log -
2013e-39 -
Exploration down hole to more climbs + pitches.
Survey started.
March 27th - Easter log -
2013e-39 -
(i) Dig at base of first chamber.
(ii) At end: 7m bolted traverse to large 15m Ø shaft.
25m deep in 3 stages.
Small draughting hole seen but serious capping and shoring now required.
TL=124m+11m=135m X
TL=153 (including a couple of guesstimates) d=36
August 18th - summer log -
2013s-81 -
Digging draughting slot in final chamber.
More work required.
2014
August 8th - summer log -
2014s-47 -
Capping down side of blocked shaft.
Measured as a p17.
August 12th - summer log -
2014s-55 -
70m pitch found @ base of p17
August 14th - summer log -
2014s-57 -
p80 with reblay 8m down to jammed boulders with continuing p30.
Good echo.
August 16th - summer log -
2014s-64 -
p55 descended at base of p75-80
Large chamber with pitch ways off.
(See plastic wallet from PG)
November 16th - autumn log -
2014a-05;
2014a-06 -
To "bottom". Shaft ~125 ±10 altimeter.
Up slope vadose trench tackle.
Pitches of 8, 7 and 5 with a c-5.
Ends too tight at base but could be route at higher level in the 40m high trench. Since summer the silt floor to the chamber has gone, revealing entrance to downstream passage.
November 20th - autumn log -
2014a-06;
2014a-07
2016
August 10th - summer log -
2016s-44 -
New bolts and rope. Old rope removed.
Rigging diagram in logbook.
2017
August 2nd - summer log -
2017s-24 -
Derigged.
TL=651m
2018
January 18th - Jan-Feb log -
2018jf-13
Published documents: print and digital