November 2nd - autumn log -
2012a-01 -
Strongly draughting cave in left bank.
November 4th - autumn log -
2012a-02 -
Found another cave 10m downstream.
All 3 sites draught (inwards) very well.
August 21st - summer log -
2013s-86 -
Found draughting out.
Smoke test to Cubillón aborted.