MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0373 Bosque, Cueva del
N Vega - 30T 0449238 4795981 Altitude: 402m - Length: 1022m Depth: 204m
Website description for site 0373   |   Site in context, area map

Extra notes from card index
• Easter 2017: Photos from Pete S
• Accounts near end of summer log.

Orphan card index date references to logbook pages
• [02/08/2007] Extended and surveyed. Possibilities @ base. TL=148.5 D=28m (Not all of '82 explorations repeated)

Dated logbook entries with card index notes

1982

July 17th - summer log - 1982s-02 - Explored. SKETCH
January 1st - summer log - 1982s-66

2007

January 1st - summer log - 2007s-15; 2007s-62; 2007s-63

2009

August 5th - summer log - 2009s-61 - Explored and extended. More leads to do.
August 16th - summer log - 2009s-56; 2009s-61 - More surveyed. Surveyed in summer 116.5 TL=265m

2017

August 13th - summer log - 2017s-47 - Hole in floor of New Forest. Some boulders removed.
August 15th - summer log - 2017s-47 - Descended into chamber ~6x10m. Possible dig in boulders.
December 26th - Xmas - New Year log - 2017c-01; 2017c-02 - Survey. Hole opened up. p4 into passage (Boxing Day Surprise) to inlet chamber. Then a massive shaft 5 - 6secs. Out for tackle. Rigged pitch (Squirrel's Pitch) p75m 10m diameter. Rift base followed for c125m to a squeeze and p10m
December 28th - Xmas - New Year log - 2017c-03 - Quick look to see if heavy rain had affected hole. It hadn't.
December 29th - Xmas - New Year log - 2017c-03 - p10 (Helmet Trapper) to streamway and p50. Flatout crawl to streamway Rio Dado. Downstream to aven and sump.
December 30th - Xmas - New Year log - 2017c-01; 2017c-03 - Upstream to sump + draughting hole. Total length in 17_01 = 640.3m Therefore TL=640+265 = 905=906m d=204m

2018

April 7th - Easter log - 2018e-48 - Upstream sump lowered to create duck. 3m to another sump.
April 9th - Easter log - 2018e-54; 2018e-55 - (1) Explored through 6m sump for about 30m to collapse chamber. (2) Smoke set off to show all draught goes into initial upstream choke. "No hoper" (3) Explored downstream inlet. Gnarly and tight. TL=116m TL=116+906 = 1022m (+30m unsurveyed) Detackled
September 1st - summer log - 2018s-64 - Aerial panorama over the area.

Published documents: print and digital

• [G] Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions
• p34 - Account. PL~80 D=30m
• p35 - Account. PL=20
• [FF] Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p20 - Summary