August 7th - summer log -
2011s-37 -
20m to second entrance then 15m to calcite choke.
Roof could be removed.
August 8th - summer log -
2011s-39
August 9th - summer log -
2011s-43 -
Tom H. through tight squeeze to hole in false floor.
Surveyed to boss L=32.8m
August 10th - summer log -
2011s-52 -
Boss snappered but only Tom H. through.
Photos taken beyond.
August 14th - summer log -
2011s-55 -
Snappered to allow others through.
Hole in floor takes all draught.
Needs enlarging.
August 17th - summer log -
2011s-62 -
Excavated hole in floor. No progress. Prospects poor. Survey completed.
TL=81.8m (2nd batch = 49m)