November 12th - autumn log -
2011a-18 -
Various gaps between boulders noted but nothing obvious.
March 26th - Easter log -
2013e-50 -
Shown cave in depression.
March 28th - Easter log -
2013e-40;
2013e-50 -
Digging led to pitch into chamber. Some surveying.
March 29th - Easter log -
2013e-40;
2013e-50 -
Civil War cave shelter. Passages off 8x3m chamber.
August 10th - summer log -
2013s-68 -
Dug @ end of high level passage @ 2 sites.
RH ends in boulder-filled passage.
LH dig needs capping to gain any further progress.
August 11th - summer log -
2013s-69 -
Surveying. All ways on choked.
RH wall above a dig started moving.
May warrant another visit.
Survey file: TL=106 d=21m
September 9th - summer log -
2013s-89
August 16th - summer log -
2014s-63 -
Digging / capping low crawl.
November 18th - autumn log -
2014a-06 -
Dug at end of high level passage.
4m drop ends in roof of 1st chamber
November 19th - autumn log -
2014a-07 -
Failed to find undescended pitch up slope in lower chamber. Under a boulder run-in?
September 17th - autumn log -
2015a-01;
2015a-02 -
Traverse over main chamber to small chamber 5x2m. Many loose boulders.
Lost pitch not found.
September 24th - autumn log -
2015a-02 -
Side passage dig inspected. Long term work.