Extra notes from card index
• [Used for #0523 in error]
• shaft given as
ED50 SigPac 446681 4796616 = Eur79 0446672 4796614 ^312
Washing Machine Hole
• Washing Machine Cave
• Autumn 2012 (not in log.) Entrance crawl sumped.
2 small caves 7m above entrance on ledge unite after 5m.
• March 2013: Several days digging allowed P Parker to drop p48m to p4 to 15m horizontal + much smaller way on.
• Later: undescended p16 descended. After 15m of rift passage it enters the main p52 about 5m below the traverse to the pitch head.
• Jan 23rd 2018 - sketches of passages from A Ritchie via Phil Parker.
Orphan card index date references to logbook pages
• [15/04/2012] Survey in computer. Length = 134m d=24m
More explored. Lead to look at.
• [16/08/2012] Digging out silt.
• [23/03/2013] Dig entrance crawl. Good look around passages beyond entrance pitch.
Should be called Torca Hoyo Carabo
• [01/08/2013] Underground dam destroyed.
Dated logbook entries with card index notes
2010
April 14th - Easter log -
2010e-36
2011
January 1st - autumn log -
2011a-24
November 19th - autumn log -
2011a-22;
2011a-23 -
Large entrance to climb down. Domestic rubbish.
Choked keyhole passage. (2 entries)
L=17 D=10
2012
April 5th - Easter log -
2012e-42 -
Further digging along low sandy crawl.
April 6th - Easter log -
2012e-42 -
Further digging along low sandy crawl.
April 8th - Easter log -
2012e-42 -
About 170ft of passage down 18ft pitch. Mainly walking-size.
Ends at blind hole in floor. ~80m?
Survey to come.
April 9th - Easter log -
2012e-42 -
About 170ft of passage down 18ft pitch. Mainly walking-size.
Ends at blind hole in floor. ~80m?
Survey to come.
August 10th - summer log -
2012s-65
August 19th - summer log -
2012s-77 -
Digging out silt.
August 20th - summer log -
2012s-78 -
Pits descended in floor beyond silt dig.
(Alter caption on surface picture)
August 22nd - summer log -
2012s-81 -
"3rd" pit is 50m deep? Survey.
L=92m TL=92+134 = 226m
Traverse line difficult to install due to soft rock.
2013
March 22nd - Easter log -
2013e-38
March 26th - Easter log -
2013e-50
March 30th - Easter log -
2013e-40
August 17th - summer log -
2013s-80 -
Digging in entrance crawl blockage.
2014
April 21st - Easter log -
2014e-50 -
Re-excavated of sand and boulders.
April 22nd - Easter log -
2014e-50 -
Past end of very tight passage at the lowest point of the cave.
Ends @ undescended p8 but access passage needs enlarging.
Continue traverse @ head of p52 leads to a p11 into a well decorated area with no way on. At base of p4 below p52, flood debris noted 4 - 5m above the floor.
August 6th - summer log -
2014s-39
November 12th - autumn log -
2014a-08 -
Crawl open - no different from April visit.
November 17th - autumn log -
2014a-08
November 18th - autumn log -
2014a-08 -
Down p8 at base. SRT feet first.
At base 30m aven + short length of large passage. On L rock bridge has jaw bone.
Continues down small climbs to a U-shaped tight crawl. Seems to continue.
On the big pitch - one of the Y-hang bolts has loosened.
2015
November 9th - autumn log -
2016e-49 -
Not passable but draughting out.
2017
April 12th - Easter log -
2017e-08 -
Dug out
April 17th - Easter log -
2017e-27 -
15m passage choked off the main pitch.
Published documents: print and digital
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p12 - Summary p12; length 226m