MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#3420 Hoyo Carabo, Torca de
Washing Machine Hole
Ideopuerta - 30T 0446570 4796405 Altitude: 314m - Length: 226m Depth: 70m
Website description for site 3420   |   Site in context, area map

Extra notes from card index
• [Used for #0523 in error]
• shaft given as ED50 SigPac 446681 4796616 = Eur79 0446672 4796614 ^312 Washing Machine Hole
• Washing Machine Cave
• Autumn 2012 (not in log.) Entrance crawl sumped. 2 small caves 7m above entrance on ledge unite after 5m.
• March 2013: Several days digging allowed P Parker to drop p48m to p4 to 15m horizontal + much smaller way on.
• Later: undescended p16 descended. After 15m of rift passage it enters the main p52 about 5m below the traverse to the pitch head.
• Jan 23rd 2018 - sketches of passages from A Ritchie via Phil Parker.

Orphan card index date references to logbook pages
• [15/04/2012] Survey in computer. Length = 134m d=24m More explored. Lead to look at.
• [16/08/2012] Digging out silt.
• [23/03/2013] Dig entrance crawl. Good look around passages beyond entrance pitch. Should be called Torca Hoyo Carabo
• [01/08/2013] Underground dam destroyed.

Dated logbook entries with card index notes

2010

April 14th - Easter log - 2010e-36

2011

January 1st - autumn log - 2011a-24
November 19th - autumn log - 2011a-22; 2011a-23 - Large entrance to climb down. Domestic rubbish. Choked keyhole passage. (2 entries) L=17 D=10

2012

April 5th - Easter log - 2012e-42 - Further digging along low sandy crawl.
April 6th - Easter log - 2012e-42 - Further digging along low sandy crawl.
April 8th - Easter log - 2012e-42 - About 170ft of passage down 18ft pitch. Mainly walking-size. Ends at blind hole in floor. ~80m? Survey to come.
April 9th - Easter log - 2012e-42 - About 170ft of passage down 18ft pitch. Mainly walking-size. Ends at blind hole in floor. ~80m? Survey to come.
August 10th - summer log - 2012s-65
August 19th - summer log - 2012s-77 - Digging out silt.
August 20th - summer log - 2012s-78 - Pits descended in floor beyond silt dig. (Alter caption on surface picture)
August 22nd - summer log - 2012s-81 - "3rd" pit is 50m deep? Survey. L=92m TL=92+134 = 226m Traverse line difficult to install due to soft rock.

2013

March 22nd - Easter log - 2013e-38
March 26th - Easter log - 2013e-50
March 30th - Easter log - 2013e-40
August 17th - summer log - 2013s-80 - Digging in entrance crawl blockage.

2014

April 21st - Easter log - 2014e-50 - Re-excavated of sand and boulders.
April 22nd - Easter log - 2014e-50 - Past end of very tight passage at the lowest point of the cave. Ends @ undescended p8 but access passage needs enlarging. Continue traverse @ head of p52 leads to a p11 into a well decorated area with no way on. At base of p4 below p52, flood debris noted 4 - 5m above the floor.
August 6th - summer log - 2014s-39
November 12th - autumn log - 2014a-08 - Crawl open - no different from April visit.
November 17th - autumn log - 2014a-08
November 18th - autumn log - 2014a-08 - Down p8 at base. SRT feet first. At base 30m aven + short length of large passage. On L rock bridge has jaw bone. Continues down small climbs to a U-shaped tight crawl. Seems to continue. On the big pitch - one of the Y-hang bolts has loosened.

2015

November 9th - autumn log - 2016e-49 - Not passable but draughting out.

2017

April 12th - Easter log - 2017e-08 - Dug out
April 17th - Easter log - 2017e-27 - 15m passage choked off the main pitch.

Published documents: print and digital

• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p12 - Summary p12; length 226m