Extra notes from card index
• Batch 11-01 and 11-03 drawn up. Jess Eades.
• 3/12/23 Photos from Jon Pemberton
• 14/12/23 Video on YouTube.
Orphan card index date references to logbook pages
• [04/04/2010] Excavated hole by roadside. Exploration.
• [05/04/2010] Exploration and survey.
• [06/04/2010] Exploration and survey.
• [07/04/2010] Exploration and survey.
• [20/07/2010] Solo exploration (Barny)
• [23/07/2010] Surveying leads batches 13, 14, 15
Total length = 2388m
• [23/04/2011] Southern end extension to large chamber. Routes off close in.
Batch 11_03 173m
TL=3199 + 173m = 3372m
Dated logbook entries with card index notes
2010
January 1st - Easter log -
2010e-18;
2010e-19;
2010e-25;
2010e-26
July 21st - summer log -
2010s-04;
2010s-05 -
Survey upstream batch 10-09. Not connected in.
L=688m
July 22nd - summer log -
2010s-05;
2010s-06 -
Batch 10 connects 09 into cave.
10 TL = 245m
Also batches 11 + 12 surveyed.
TL 11 = 198m Muddy End
12 = 259m Downstream
July 29th - summer log -
2010s-20;
2010s-21 -
Route through upstream "sump" pushed
Other leads looked at and surveyed.
Batches 16, 17, 18
114.2+134.5+128.5 = 377.2m
TL=2768m
August 4th - summer log -
2010s-31 -
Batch 10_19 L=148m
TL=2916m
2011
January 11th - autumn log -
2010a-03
January 12th - autumn log -
2010a-04
April 20th - Easter log -
2011e-17 -
Poking in entrance passages.
April 21st - Easter log -
2011e-17;
2011e-18 -
(1) Dickon Trap. Pushed into small passage.
Too small Batch 11-02 L=72.4m
(2) Batch 11-01 at end through boulder choke. 210.4m surveyed. Big passage continues.
TL=2916+210.4+72.4 = 3199m
January 1st - summer log -
2011s-25
July 20th - summer log -
2011s-04 -
4 batches surveyed
11-04 -05 -06 -07 109.5m
TL=3372+110 = 3482m
July 25th - summer log -
2011s-15;
2011s-16 -
3 batches 11-08 -09 -10
TL=3482+118 = 3600m
July 27th - summer log -
2011s-18;
2011s-19;
2011s-20 -
Batches 11-11 145m
11-12 48m
11-13 42.1m
11-14 Resurvey - L not included
TL=3835m
2012
February 9th - Jan-Feb log -
2012jf-04;
2012jf-05
2013
July 23rd - summer log -
2013s-05 -
Already rigged. Dive kit to Octopus Garden Sump.
Sketch surveys of some side passages.
July 25th - summer log -
2013s-10 -
Tim Webber dive downstream 14m to cross rift. Dive line @ 14m in has a tag with "Encaramada" written on it.
Difficulty getting out.
Yellow River surveyed. Batch 13-01 Length 95m
TL=3835+95 = 3930m
July 31st - summer log -
2013s-23 -
Detackled
2014
April 13th - Easter log -
2014e-11;
2014e-12 -
"I Want It All" area loops surveyed + opposite "Tin Man"
L=3930 + 97 + 59 + 4086m
2023
November 5th - autumn log -
2023a-10;
2023a-10;
2023a-26;
2023a-26;
2023a-27;
2023a-27 -
First trip in for Eldon PC. Survey not correct after Absolution Aven.
November 6th - autumn log -
2023a-12;
2023a-12;
2023a-13;
2023a-13;
2023a-14;
2023a-14 -
Various extensions - more to do "Slitherin"
23-04 212.7m
November 8th - autumn log -
2023a-18;
2023a-18;
2023a-19;
2023a-19;
2023a-20;
2023a-20;
2023a-21;
2023a-21 -
Surveying 23-05 06 07
L=171.8 + 37.7 + 122.6
November 10th - autumn log -
2023a-23;
2023a-23;
2023a-24;
2023a-24;
2023a-25;
2023a-25 -
Survey Nosferatu 72.1m 23-09
All derigged
L=845m for autumn extensions.
TL=4086 + 845 = 4931m
2024
February 10th - Jan-Feb log -
2024jf-06
Published documents: print and digital
• [FP]
Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p8, p10, p11 - Photo p11