Extra notes from card index
• L12E: 2 - 7/4/12
Dived through sump 2. Steep incline at -14.6
Orphan card index date references to logbook pages
• [02/04/2010] Found.
• [03/04/2010] Explored to sump. Joined to site 978 + almost to site 979.
TL=400m Batch 10-01 (Surface survey to bridge).
Bridge @ 30T 0449824 4801115 ^88
Easiest entrance to system is through site 978.
Length includes 978 line (21.4m) d=11m
• [24/07/2011] Dowsed upstream
• [04/08/2011] Further explored for ~450m by Simon Cornhill.
• [05/08/2011] S.C. and Dan Hibbert through. 181.6m surveyed. High level seen.
• [06/08/2011] Surveyed new passage batch 11-04 566.1
Surveyed new passage batch 11-05 71.5
TL = 1280.2m
Dated logbook entries with card index notes
2010
July 25th - summer log -
2010s-10;
2010s-11 -
Tourist trip. Check out sump. Video. Photo.
("Pitch" is a climb down to streamway.) Alter survey.
August 2nd - summer log -
2010s-25 -
Some digging out of stream downstream of sump. Sump investigated.
August 3rd - summer log -
2010s-27 -
Sump investigated with bottoles. 5m in. Continues.
August 9th - summer log -
2010s-37;
2010s-38 -
Dived by Simon Cornhill.
About 36m sump to canal then walking.
L=61m TL=461m
2011
April 18th - Easter log -
2011e-09;
2011e-17 -
Aven above sump climbed. Closes in.
"Small passage on left on the way in - the last one before you get to the sump" pushed for 50m or so to a dig.
Good draught at this point.
August 7th - summer log -
2011s-37;
2011s-37
2012
February 9th - Jan-Feb log -
2012jf-05
January 1st - Easter log -
2012e-29
April 2nd - Easter log -
2012e-35 -
Sandy crawl pushed to place which was too low on L and required digging to the R.
Needs surveying.
Published documents: print and digital
• [FP]
Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• pp9-10 - Summary.
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p12 - Summary.