MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#3283 Invisible Cave
San Antonio - 30T 0446518 4801556 Altitude: 56m
Website description for site 3283   |   Site in context, area map

Extra notes from card index
• Easter dive report from D Hibberts (in logbook)
• Sept. 13: Change GR after survey of caves 1 + 2 @ Aguanaz.

Orphan card index date references to logbook pages
• [04/08/2009] Explored "by mistake" after not finding Aguanaz. No passage found @ top of boulder slope aven. TL=291m d=12m
• [16/08/2010] Dive through to canal. -3 +3 immediately. C Camm.
• [17/04/2017] Sump 9 not passaged. Too difficulyt in unclean, murky conditions.
• [19/04/2017] Down to base of gravel + back up. (account in 19A logbook!) page 3.

Dated logbook entries with card index notes

2009

July 20th - summer log - 2009s-04 - Next to Aguanaz resurgence.
July 21st - summer log - 2009s-04; 2009s-05 - Surveyed cave. Length ? ~ 37.8m
July 25th - summer log - 2009s-13 - Failed to syphon pool.
July 26th - summer log - 2009s-13 - Failed to syphon pool with submersible pump.
July 27th - summer log - 2009s-18 - Pool drained using pump. Extended by ~140m to duck.
July 28th - summer log - 2009s-19 - Top entrance excavated.
July 29th - summer log - 2009s-21; 2009s-24 - Top entrance excavated. Two ducks through to aven + sump.
January 1st - summer log - 2009s-30
August 21st - summer log - 2009s-62 - Line through ducks. Sump looked at. Needs bottole. Trench dug back at aven.
October 15th - autumn log - 2009a-02 - Entrada Tres 3291 linked in. Length is on that site.

2010

August 15th - summer log - 2010s-61 - Carry some gear in.
August 18th - summer log - 2010s-65; 2010s-71 - Dived through sump + explored to next sumps. Line in on bolt far side. New sump is duck under to air bell then continues. 50m surveyed. Total length (including 3291) = 409+50 = 459m

2011

April 17th - Easter log - 2011e-08 - Gear left in. C Camm drysuit hood too tight.
April 19th - Easter log - 2011e-10 - Dived sump 2 Chris Camm with PP. 10m long; still open and going.

2012

April 7th - Easter log - 2012e-50
April 8th - Easter log - 2012e-29; 2012e-43; 2012e-50 - Sump 2 dived through to going passage and large aven. Dirty water.
April 9th - Easter log - 2012e-43; 2012e-50 - Batch 12-01 149.9m between sumps 2 + 3
April 10th - Easter log - 2012e-43 - Explored to sump 8. Surveyed to sump 6. Batch 12-02 95m TL=459+150+95 = 704m (length with site 3291)

2016

March 26th - Easter log - 2016e-20

2017

April 18th - Easter log - 2017e-30 - Sump 9 not passaged. Too difficulyt in unclean, murky conditions.

2025

August 17th - summer log - 2025s-56

2026

April 8th - Easter log - 2026e-42

Published documents: print and digital

• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p14,15 - Summary and photo.
• [FP] Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p10 - Summary.
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p12 - Summary. Length =704m