Extra notes from card index
• Easter dive report from D Hibberts (in logbook)
• Sept. 13: Change GR after survey of caves 1 + 2 @ Aguanaz.
Orphan card index date references to logbook pages
• [04/08/2009] Explored "by mistake" after not finding Aguanaz. No passage found @ top of boulder slope aven.
TL=291m d=12m
• [16/08/2010] Dive through to canal. -3 +3 immediately. C Camm.
• [17/04/2017] Sump 9 not passaged. Too difficulyt in unclean, murky conditions.
• [19/04/2017] Down to base of gravel + back up.
(account in 19A logbook!) page 3.
Dated logbook entries with card index notes
2009
July 20th - summer log -
2009s-04 -
Next to Aguanaz resurgence.
July 21st - summer log -
2009s-04;
2009s-05 -
Surveyed cave. Length ? ~ 37.8m
July 25th - summer log -
2009s-13 -
Failed to syphon pool.
July 26th - summer log -
2009s-13 -
Failed to syphon pool with submersible pump.
July 27th - summer log -
2009s-18 -
Pool drained using pump.
Extended by ~140m to duck.
July 28th - summer log -
2009s-19 -
Top entrance excavated.
July 29th - summer log -
2009s-21;
2009s-24 -
Top entrance excavated. Two ducks through to aven + sump.
January 1st - summer log -
2009s-30
August 21st - summer log -
2009s-62 -
Line through ducks. Sump looked at. Needs bottole.
Trench dug back at aven.
October 15th - autumn log -
2009a-02 -
Entrada Tres 3291 linked in.
Length is on that site.
2010
August 15th - summer log -
2010s-61 -
Carry some gear in.
August 18th - summer log -
2010s-65;
2010s-71 -
Dived through sump + explored to next sumps. Line in on bolt far side.
New sump is duck under to air bell then continues. 50m surveyed.
Total length (including 3291) = 409+50 = 459m
2011
April 17th - Easter log -
2011e-08 -
Gear left in. C Camm drysuit hood too tight.
April 19th - Easter log -
2011e-10 -
Dived sump 2 Chris Camm with PP.
10m long; still open and going.
2012
April 7th - Easter log -
2012e-50
April 8th - Easter log -
2012e-29;
2012e-43;
2012e-50 -
Sump 2 dived through to going passage and large aven.
Dirty water.
April 9th - Easter log -
2012e-43;
2012e-50 -
Batch 12-01 149.9m between sumps 2 + 3
April 10th - Easter log -
2012e-43 -
Explored to sump 8. Surveyed to sump 6.
Batch 12-02 95m
TL=459+150+95 = 704m (length with site 3291)
2016
March 26th - Easter log -
2016e-20
2017
April 18th - Easter log -
2017e-30 -
Sump 9 not passaged. Too difficulyt in unclean, murky conditions.
2025
August 17th - summer log -
2025s-56
2026
April 8th - Easter log -
2026e-42
Published documents: print and digital
• [FN]
Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p14,15 - Summary and photo.
• [FP]
Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p10 - Summary.
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p12 - Summary. Length =704m