MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#3234 Llanío, Cueva-Cubío del
Cold Store Cave
Riaño - 30T 0451519 4800779 Altitude: 165m - Depth: 77m
Website description for site 3234   |   Site in context, area map

Extra notes from card index
• Sub-phone in Fridge Door puts both possible connections very close.

Orphan card index date references to logbook pages
• [08/11/2009] 237m new passage with streamway - low and wet at both ends. TL=1525m
• [29/03/2010] Continue Autumn '09 explorations (TL=256.5 Total = 1782m) Comes very close to The Hub
• [30/03/2010] Extending new series - links to Pulse Racer. (lengths calculated from DistoX at end of explorations)
• [31/03/2010] Extending new series - links to Pulse Racer. (lengths calculated from DistoX at end of explorations)
• [01/04/2010] Extending new series - links to Pulse Racer. (lengths calculated from DistoX at end of explorations)
• [02/04/2010] Extending new series - links to Pulse Racer. (lengths calculated from DistoX at end of explorations)
• [03/04/2010] Extending new series - links to Pulse Racer. (lengths calculated from DistoX at end of explorations) Upstream / Horny Dog Series / High Pulse all in batch 3234-10-05 (10-01,02,03 redundant) 3234-10-04 survey of extension to east. 10-05 789m new (10-04 51m new) TL=1525 + 789m = 2314m (Total new at Easter)
• [09/08/2010] Batch 10-07 Passages below Bllod Sw + Tears pitch L=122.6 TL=2525m
• [14/08/2010] Batch 10-10 36.7m Batch 10-11 185m 222m TL=2921m
• [04/02/2012] 31/1/12 - 4/2/12 (1) Main explorations up The Aven into West Wing, then along East Wing to explore down Eels Shaft and along passage heading south. Batch 12-01 contains all this except W Wing. TL=163.8 Batch 12-02 West Wing TL=58.2 TL=3440+222m=3662m
• [30/07/2017] Subphone entrance opened up L=7. Site 4536 TL=5070+7m = 5077m
• [18/10/2019] Search in fields W of 3234. Nothing found. Met farmer "great guy"
• [19/10/2019] (1) Two squeezes enlarged @ entrance. Draughting passage between squeezes dug to where it becomes too tight. (2) End of traverse has eyehole on left dropping 4m - 5m to parallel passage. No footprints.
• [18/02/2023] Feb 2023: Sci. Project: Speleothem Phosphate Palaeothermometer started. Water collection. Peter Wynn et al.
• [19/02/2023] Feb 2023: Sci. Project: Speleothem Phosphate Palaeothermometer started. Water collection. Peter Wynn et al.

Dated logbook entries with card index notes

2009

April 15th - Easter log - 2009e-54 - Found
April 16th - Easter log - 2009e-55 - Batch 09-01 L=145.1m Photos
April 17th - Easter log - 2009e-55 - Another 100m? Explored but not surveyed. Photos.
August 1st - summer log - 2009s-33 - (1) Up scaling pole. Batch 09-02 L=49.6 (2) Into crawl + tube off stal chamber 09-03 L=13.5m REPLACE DATA (3) Easter surveyed + through to domes[?] + video + photos Batch 09-04 rifts 297.3m
August 2nd - summer log - 2009s-32; 2009s-33 - Dug out crawl to more passage. L=182 + 43 Batches 09-05 09-06 (TL=792) (temp.) Batches 07 + 08 43m + 95.5
August 3rd - summer log - 2009s-33 - West passage
August 4th - summer log - 2009s-33 - Addition to batch 09-08 45m
August 5th - summer log - 2009s-35
August 7th - summer log - 2009s-53 - Batch 09-04 resurveyed (09-09) with more, to give TL=1068m
August 9th - summer log - 2009s-44 - (1) Extra to batch 09-01 (2) Extra to batch 09-091 15.6m TL=1074m
August 11th - summer log - 2009s-53 - Explored beyond slot up (which was snappered) 125m surveyed DistoX TL=1199m
August 12th - summer log - 2009s-50
August 13th - summer log - 2009s-53 - (1) W pitch explored 09-11 (2) Mid pitch explored 09-12 (3) p20 in main passage 09-13 L=89.3m TL = 1288.3m Entrance altitude = 163m
October 25th - autumn log - 2009a-05 - Low sandy dig @ SE end. Enter 20m to a stal blockage. Not surveyed.
November 7th - autumn log - 2009a-07 - (Text) Base of p @ SE end has unexplored 3x3m passage.
November 9th - autumn log - 2009a-08

2010

April 4th - Easter log - 2010e-12; 2010e-13; 2010e-15
April 6th - Easter log - 2010e-21
January 1st - summer log - 2010s-42; 2010s-54
August 2nd - summer log - 2010s-28 - Investigating passage off 'Wide Open'
August 3rd - summer log - 2010s-27 - Dug out sand choke down rift at aven. Ends @ choked shaft. Batch 10-06 TL=88m L=2402m
August 11th - summer log - 2010s-43; 2010s-44; 2010s-55 - (1) Climb down then up @ end of Playing Card House Pushover. Past calcite flow to climbs around boulders and drops. Batch 10_08 109.2m TL=2634m Still wide open. (2) Down "15m pitch" below aven Remove old survey legs (-33.6) L=98.5 Add 64.9 to survey TL=2699m Batch 10_09
August 13th - summer log - 2010s-60
August 16th - summer log - 2010s-62; 2010s-64 - (1) Batch 10-12 14m TL=2935m (2) Aven partly climbed

2011

April 26th - Easter log - 2011e-27 - (1) Dug at sandy crawl at NE large passage W end. Needs spades. (2) Climbed up and pushed in ~80m of small passage at NE corner. ("Solution pockets") TL=81m
April 28th - Easter log - 2011e-40 - Dug at sandy dig into Jovens' Loop end. TL=3016m
August 9th - summer log - 2011s-39; 2011s-40; 2011s-41; 2011s-46 - Photos from Easter. Various bolt climbs, traverses + pits dropped @ NW corner. No surveying. Perhaps 100m total in bits?
October 13th - autumn log - 2011a-05 - Aven climb completed. Some passage explored.
October 14th - autumn log - 2011a-05 - Batch 11-02 TL=120.4 to p head.
October 15th - autumn log - 2011a-05 - Batch 11-03 replace 02 Total TL = 259.5m Down pitch and some exploration.
October 17th - autumn log - 2011a-05 - Batch 11-04 replaces 11-03. Total TL = 424.1m TL=424.1 + 3016 = 3440m

2012

January 31st - Jan-Feb log - 2012jf-07 - 31/1/12 - 4/2/12 (1) Main explorations up The Aven into West Wing, then along East Wing to explore down Eels Shaft and along passage heading south. Batch 12-01 contains all this except W Wing. TL=163.8 Batch 12-02 West Wing TL=58.2
January 1st - Jan-Feb log - 2012jf-06
February 1st - Jan-Feb log - 2012jf-07; 2012jf-07 - 31/1/12 - 4/2/12 (1) Main explorations up The Aven into West Wing, then along East Wing to explore down Eels Shaft and along passage heading south. Batch 12-01 contains all this except W Wing. TL=163.8 Batch 12-02 West Wing TL=58.2
February 2nd - Jan-Feb log - 2012jf-07 - 31/1/12 - 4/2/12 (1) Main explorations up The Aven into West Wing, then along East Wing to explore down Eels Shaft and along passage heading south. Batch 12-01 contains all this except W Wing. TL=163.8 Batch 12-02 West Wing TL=58.2
February 3rd - Jan-Feb log - 2012jf-07 - 31/1/12 - 4/2/12 (1) Main explorations up The Aven into West Wing, then along East Wing to explore down Eels Shaft and along passage heading south. Batch 12-01 contains all this except W Wing. TL=163.8 Batch 12-02 West Wing TL=58.2
February 9th - Jan-Feb log - 2012jf-04
August 6th - summer log - 2012s-35 - Continue draughting dig beyond 10-04.01. Can see about 6m along 20cm high passage.
November 15th - autumn log - 2012a-07 - Radon detector removed. In cave from 5/8/12

2013

March 26th - Easter log - 2013e-24; 2013e-25; 2013e-30 - Pushing SE corner (Bird's Wing)
March 29th - Easter log - 2013e-26; 2013e-30 - Survey extension L=169m TL=3662+169m = 3831m
April 2nd - Easter log - 2013e-28; 2013e-30; 2013e-33 - Misc. small extensions. See log.

2014

April 15th - Easter log - 2014e-17; 2014e-18 - Extension and comments A to G around Birds Wing Chamber + west. No surveying. DistoX and PDA malfunction.
April 18th - Easter log - 2014e-37 - Linked crawl @ High Hopes into Horny Dog Series. Radon count 15/4 --> 20/4 was 3612 Bq/m³
April 22nd - Easter log - 2014e-45 - Connection crawl finished. Duck lowered. Better trench could dry it.

2015

March 31st - Easter log - 2015e-05; 2015e-05; 2015e-07; 2015e-07 - Horny Dog section checked. A rift dropped to 4m meander + mud choke.
August 25th - summer log - 2015s-52 - Tourist trip to aven on main level. Small chamber entered on S side of 'The Hub' "Elli Matthew Chamber" X Previously entered.

2016

March 1st - Easter log - 2016e-38
March 2nd - Easter log - 2016e-38
March 27th - Easter log - 2016e-23 - Extension around Bird's Wing Chamber.
March 28th - Easter log - 2016e-23 - Extension around Bird's Wing Chamber. L=67.3 Batch 16-01
April 1st - Easter log - 2016e-37 - 1/4/16 --> 2/4/16 Overnight. (1) Dropped p6 into Mitre Passage. Possible continuation. Batch 16-01 extended. (2) Dig (sandy) (off H. Dog?) See log. (3) High and low level dig. See log
April 2nd - Easter log - 2016e-37 - 1/4/16 --> 2/4/16 Overnight. (1) Dropped p6 into Mitre Passage. Possible continuation. Batch 16-01 extended. (2) Dig (sandy) (off H. Dog?) See log. TL of 16-01 is 183m TL=3831 + 183 = 4014m (3) High and low level dig. See log Start @ 4014m

2017

April 14th - Easter log - 2017e-16 - Mitre Passage area. Surveyed about 100m. More details to come after next trip.
April 16th - Easter log - 2017e-39 - Pushing to chamber over SE end of Mitre Passage.
April 18th - Easter log - 2017e-29; 2017e-30; 2017e-31 - Molephoning at small area in SE. 2 accounts.
April 19th - Easter log - 2017e-35
April 21st - Easter log - 2017e-39 - Surveyed 'Mulu Manners' to smaller passages close to Riaño (about 100m away) All surveys combined into batch 17-03 length = 1056m Therefore traverse length = 4014 + 1056 = 5070m
May 6th - Easter log - 2017e-50 - Roof above station 97 (under road) is very flat.
August 1st - summer log - 2017s-17; 2017s-17; 2017s-18; 2017s-18 - Various leads looked at. See survey in log book. Nothing surveyed.
August 2nd - summer log - 2017s-21 - Entrance 4536 opened up. c-15m descended @ end of Mulu Manners. Surveyed batch 17-04 L=238m TL=5070 + 238 = 5308m
August 4th - summer log - 2017s-26 - Continue exploring 17-05 L=608m TL=5916m
August 8th - summer log - 2017s-36; 2017s-37 - More pushing batch 17-06 80m batch 17-07 64.4m 17-08 29.6m TL=174 + 5916 = 6090m +7m = 6097m

2018

January 28th - Jan-Feb log - 2018jf-01 - Investigating stal and drips for possible nitrate project. (High Hopes area)
January 29th - Jan-Feb log - 2018jf-01; 2018jf-01; 2018jf-03; 2018jf-03; 2018jf-07; 2018jf-07 - Drip samples collected + drip meters and beakers left for future collection.
January 30th - Jan-Feb log - 2018jf-04; 2018jf-06; 2018jf-07 - Extended South Passage into Bear Chamber (complex) + New Hope + Don't Stop Now. Batch 18-02 (167.5m)
January 31st - Jan-Feb log - 2018jf-04; 2018jf-05; 2018jf-07 - (a) Started rigging p25 but battery failed. (b) Entered Up + Running above c2. Batch 18-01c (55m) (c) Crawl @ N of Ali Chamber pushed but closes in to 20 x 60cm wide. (d) Squeezes N of Sandy Ch. (e) Draughting dig @ N of bend in Side Road started.
February 1st - Jan-Feb log - 2018jf-06; 2018jf-07; 2018jf-08 - (a) Shaft too wet to tackle up. (b) Passages S of Ski Slope (previously explored but not surveyed) Batch 18-03 (131.3m) © Bear Chamber pushed up into Crystal Mine ~100m long. Very well decorated. Batch 18-04 (110.1m)
February 3rd - Jan-Feb log - 2018jf-07; 2018jf-07 - (a) Hidden Crawl investigated. Batch 18-05 (49m) (b) Draughting tube in Upper Mitre level. Bolted up then p7 to known passage. (c) Opposite Shark a bolt climb leads to start of passage but filled with sand. (d) Side Road crawl enters chamber with rift. Closes in. Batch 18-06 (37m) Total surveyed 18-01abc --> 18-06 = 600.3m TL=600.3 + 6097 = 6697m
February 6th - Jan-Feb log - 2018jf-08 - Water noticed flowing in lower valley which is probably source of water that stopped exploration down p20.
February 7th - Jan-Feb log - 2018jf-08 - Drone over original entrance passages fields for photos and video for Peter Wynn.
February 14th - Jan-Feb log - 2018jf-12
February 15th - Jan-Feb log - 2018jf-12 - Measurements of nitrate concentration in water. (Log book)
March 4th - Jan-Feb log - 2018jf-15; 2018jf-16
March 27th - Easter log - 2018e-04; 2018e-05; 2018e-06; 2018e-07 - p25 dropped to blind base 28m surveyed @ E end. 18-07 Rope left at possible rift connection to Riaño. 2 accounts
March 31st - Easter log - 2018e-12 - Extensions around Monster Ramp. Batch 18-08 L=64m
April 1st - Easter log - 2018e-12; 2018e-13 - Napoleon Passage. Canyon explored off Bear Chamber to a p12 unexplored. Batch 18-09 L=170m TL=6697 + 28 + 64 + 170 = 6959m
April 3rd - Easter log - 2018e-24 - (1) Bits and pieces (2) p12 dropped. Goes to choked 3m Ø chamber About 10m into Napoleon, strongly draughting holes are too small (No survey).
April 4th - Easter log - 2018e-29 - Torben, Louise and family to Ali Chamber. Dig off Side Road to a 1 x 4m rift only 10cm wide at E end.
April 14th - Easter log - 2018e-63 - Pitfall traps + spot sampling. Beware of the bees.
April 17th - Easter log - 2018e-74
August 1st - summer log - 2018s-18

2019

January 19th - January log - 2019j-01 - Lancaster University N project sample collection started.
January 20th - January log - 2019j-01 - Lancaster University N project sample collection started. + photos + video
January 21st - January log - 2019j-01 - Lancaster University N project sample collection started.
April 9th - Easter log - 2019e-06 - (1) Dropped p20 into big rift ending very close to Riaño stream passage. Batch 19-01 L=76m (TL=6959+76 = 7035m)X
April 11th - Easter log - 2019e-15 - Overnight camp. Explorations around p24 E of New Hope. Batch 19-02 contains 19-01
April 12th - Easter log - 2019e-15 - Overnight camp. Explorations around p24 E of New Hope. Batch 19-02 contains 19-01
April 14th - Easter log - 2019e-15 - (1) Torben family trip to just before Ali Chamber. (2) Various holes checked out in new extension. Survey? Total of easter = 309m TL = 6959 + 309 = 7268m
April 18th - Easter log - 2019e-29 - Water samples collected.
April 20th - Easter log - 2019e-34 - Pitfall traps removed. Some photography.
May 10th - Easter log - 2019e-63 - Digging in side passage, 20m on right past The Hub. 3m of clay and stones removed. Passage narrows ahead. No draught.
May 17th - Whit log - 2019w-05
June 21st - Whit log - 2019w-10; 2019w-11 - Continue digging in "20m past" The Hub. Bee stings!
June 22nd - Whit log - 2019w-11 - Continue dig.
July 6th - Whit log - 2019w-06 - Torben's additions / corrections to Easter explorations.
July 29th - summer log - 2019s-07; 2019s-08 - Look for surface subphone point for possible connection to 0105.
July 30th - summer log - 2019s-09; 2019s-09; 2019s-10; 2019s-10; 2019s-12; 2019s-12 - (1) Surface subphone team talked to Riaño 105 team. (2) Riaño team did most digging from Torno Inlet to get through to 3234. (3) Torben in 3234 first person into 0105. TL of 4VS = 59367 + 7268 = 66635m Subphones used on surface + in each cave. TL is actually 66635 + 24m (19-03) = 66659m
July 31st - summer log - 2019s-13
August 8th - summer log - 2019s-28; 2019s-29 - First Llanío-Riaño through trip. En-route visited Ammonite Choke in Riaño. Pushed up well into Ammonite Choke with more to do. 48m surveyed in batch 0105-19-02 4VS length = 66659+48 = 66707m
August 10th - summer log - 2019s-29; 2019s-46 - Digging @ "20m from The Hub"
August 16th - summer log - 2019s-44 - Via 4536. Photo trip to Mulu Manners + beyond.
August 22nd - summer log - 2019s-52 - Photo trip
September 1st - summer log - 2019s-60 - Exchange detectors (Lancs Uni)

2020

July 30th - autumn log - 2020a-04 - Nutella 2 trip. Area around B Chamber checked out. Add A'B'C' to survey
August 10th - Spring-Summer log - 2020s-13 - Sticky mud analysed showing high levels of anthropogenic N. (Peter Wynn) See also further email conversation PW - JSC
October 20th - autumn log - 2020a-11 - Photos of beehives in field.

2021

September 21st - autumn log - 2021a-02 - p4 explored near entrance, then out to passage.
October 4th - autumn log - 2021a-04
October 16th - autumn log - 2021a-07 - (i) Pushing at end of S Passage. (ii) Entered hole on E of S Passage.
October 18th - autumn log - 2021a-08; 2021a-09 - Canny Passage explored + surveyed
October 20th - autumn log - 2021a-09 - Canny Passage explored + surveyed Batch 21-02 L=194m 4VS 67226 + 194 = 67420m
October 25th - autumn log - 2021a-10

2022

April 12th - Easter log - 2022e-16; 2022e-30 - Canny Passage extended through tight section. Sketch in log book. (No survey)
April 16th - Easter log - 2022e-31 - Climbed up tube. 8 bolts. Batch 22-01 L=31m 4VS TL=67420 + 31 = 67451m
April 19th - Easter log - 2022e-39; 2022e-39; 2022e-47; 2022e-47 - Digging in passage between Wide Open and The Hub.
April 20th - Easter log - 2022e-44 - Visit to start of High Pulse to check possible dig towards 1800 Fridge Door Cave. Looks larger after 2m. Good draught.
July 26th - summer log - 2022s-06 - (1) Traverse line checked at end of PCHP. Rusty but OK. (2) Dig after No Breast Feed Crawl. Far dig has no draught and not promising.
July 27th - summer log - 2022s-08 - Dig pushed but now abandoned. Pulse racer has holes in roof that should be investigated. All de-rigged.
August 13th - summer log - 2022s-49
August 15th - summer log - 2022s-50
October 15th - autumn log - 2022a-05 - 2m removed in dig beyond Hub. May be worth another dig.
October 16th - autumn log - 2022a-03; 2022a-03; 2022a-04; 2022a-04; 2022c-02; 2022c-02 - Dig at beyond Hub dig.
October 20th - autumn log - 2022a-06 - Digging@ High Pulse towards 1800. Broke into 2m passage to another dig.
October 21st - autumn log - 2022a-06 - No Breast Feed crawl opened up. Dug at end.
October 23rd - autumn log - 2022a-06 - More digging 3m gained. Passage veers to the R with strong draught.

2023

February 22nd - Jan-Feb log - 2023jf-04
March 23rd - Easter log - 2023e-01; 2023e-02 - Photo (AQ) of field covered over.
April 5th - Easter log - 2023e-11 - Dug through to Fridge Door 1800. Peter Eagan only one through. Stn 81 in FDC seen.
April 6th - Easter log - 2023e-15; 2023e-15; 2023e-15; 2023e-15 - (1) About 15 x 10 litres water containers removed for Peter Wynn's project. (2) Further digging out of 1800 connection + all through. Photos and video. Across top of 'Jaws' pitch chokes up. Survey. Previous 4VS = 70059 + 23m connection + 1248 (#1800) + Jaws 29m = 71359m
April 8th - Easter log - 2023e-27; 2023e-49 - (1) Pitch dropped @ end of Ariadne - becomes too small. (2) At Jaws of the Shark, climb down to small passage that is 4m long but could be extended with a hammer. (3) Sump 2 now has a traverse line. (4) Large void seen at boulder collapse. Photos in most locations.
July 22nd - summer log - 2023s-07; 2023s-08
August 3rd - summer log - 2023s-17

2024

March 23rd - Easter log - 2024e-28 - "3 trips" to look at cave structure.
March 27th - Easter log - 2024e-12; 2024e-13 - Tourist trip looking at flow directions.
April 10th - Easter log - 2024e-43 - Peter Wynn + Andi Smith + AQ checking dripwater chemistry.
April 11th - Easter log - 2024e-44 - Peter Wynn + Andi Smith + AQ checking dripwater chemistry.

2025

February 10th - Xmas- New Year log - 2024c-31
April 16th - Easter log - 2025e-21; 2025e-22 - Connection from 1800 Fridge Door at N extremity below Cross Roads Shaft. 1800.1800-25-02.18 = 3234_Llanio.3234_17oct.3234_17oct20117.8
August 13th - summer log - 2025s-44; 2025s-62; 2025s-63; 2025s-64 - New bolts @ the Shark + photos (2 entries)
September 11th - summer log - 2025s-65; 2025s-66 - Clarification of how to reach passage below Ali Chamber.

2026

March 31st - Easter log - 2026e-10 - In through SUb Phone. Dropped Shark pitch. Mitre Passage to Bird Chamber - rusty bolts and maillons.
July 24th - summer log - 2026s-03; 2026s-04 - Detackled up from Boob Tube (#5000) Equipment out: ropes: 22m+25m+36m 2 ladders+ splitter 13 hanger+maillon Rope for the c+3 east of 'No Breast Feed Crawl' left rigged.
July 26th - summer log - 2026s-06 - In through sub-phone #4536. Hidden Crawl enlarged but needs more work.
August 2nd - summer log - 2026s-13; 2026s-14 - 1: Hidden Crawl. Dig soon choked or routes were too small. 2: Note A - question mark on survey investigated possibly up to U. Mitre Passage. 3: Access to entrance is easier 15m down the road.

Published documents: print and digital

• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• p13,14 - Summary. May eventually connect with Riaño, Espada, Torno. p13,14 (photos)
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• p740 - Photo.
• p745 - History; description; survey; photos.
• [FP] Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p11 - Summary.
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p11 - Summary.
• [GH] Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• p43 - On postulated hydrology map (Asón systems)
• [HP] Wynn P M et al, 2021 Contemporary systematics of vadose zone nitrate capture by speleothem carbonate Chemical Geology, Vol 571, 20 June 2021 (120172) ScienceDirect (Elsevier)
P. Wynn et al Nitrogen paper published.
• [HU] Scaife Chris, 2022a Finding Big … Descent 285 April/May 2022 Wild Places Publishing, Abergavenny
• p17
• [KD] Davis Sam, 2024 Jim Davis in Ali Chamber, part of Matienzo's Four Valleys System Descent 298 June / July 2024 Stalactite Publishing, Kendal
• ifc - Inside front cover - Photo of Ali Chamber.
• [KL] Corrin Juan et al, 2025 Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161 (area map + photos)
• [KP] Redder Torben and Korsgaard Louise, 2025 La Exploración de la cueva Llanío Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• p158 - La Exploración de la cueva Llanío. Boletín Cántabro de Espeleología, 18. p158