MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#3215 dig
Camposdelante - 30T 0446717 4798062 Altitude: 131m - Length: 122m Depth: 7m
Website description for site 3215   |   Site in context, area map

Extra notes from card index
• L09E: (no date) Cold store. Need to underpin boulders to continue digging. Draughts. Above sink @ site 1976.
• Move 1976 to end of surface survey. Sketch in log book. L=11m d=8m

Orphan card index date references to logbook pages
• [05/08/2009] Dug

Dated logbook entries with card index notes

2009

January 1st - Easter log - 2009e-64
April 8th - Easter log - 2009e-16
July 23rd - summer log - 2009s-10 - Dug

2011

January 1st - Easter log - 2011e-42
August 14th - summer log - 2011s-53 - Some more excavating. Sketch + survey notes in log book. L=20.5 d=7.2m
January 1st - autumn log - 2011a-24
November 14th - autumn log - 2011a-19; 2011a-23 - Excavated sandy dig to 3-way junction. Now room to excavate RH branch (250°) following draught. (2 entries)
January 1st - Xmas - New Year log - 2011c-02; 2011c-02
December 27th - Xmas - New Year log - 2011c-02 - Snappering.
December 28th - Xmas - New Year log - 2011c-02 - Removing rocks.
December 29th - Xmas - New Year log - 2011c-03 - Removing rocks. Needs small caver.

2012

January 16th - Xmas - New Year log - 2011c-06
March 31st - Easter log - 2012e-08 - Further digging.
November 8th - autumn log - 2012a-03

2013

August 22nd - summer log - 2013s-86 - Digging. 1m progress in very low passage.
August 24th - summer log - 2013s-86 - Digging. Meets an upward boulder choke. DIG FINISHED in that passage. Length of finished passage on 250° is 8m.
August 25th - summer log - 2013s-87 - Digging entered chamber with more work required. ENTRANCE UNSTABLE Estimated length = 28m

2014

April 11th - Easter log - 2014e-10 - Unstable side of entrance shaft reinforced.
April 12th - Easter log - 2014e-10 - Dug through into chamber 10 x 6 x 5m high. Ways on everywhere in a large boulder choke.
April 18th - Easter log - 2014e-32 - Started detailed survey.
April 24th - Easter log - 2014e-47 - Shoring in entrance shaft mostly replaced. Shoring incomplete at base. TL=122m Survex data not suitable? d=?
August 7th - summer log - 2014s-47 - Main source of draught still not found.
August 10th - summer log - 2014s-51 - No success on following draught. No more trips planned.

Published documents: print and digital