August 1st - summer log -
2008s-49;
2008s-50 -
Shakehole on left of track.
Tight entrance under boulder to a vertical drop to choked streamway.
L=15m d=12m
Draught at base.
January 1st - summer log -
2010s-74
August 4th - summer log -
2010s-35 -
Stone at base falls 20ft
August 4th - summer log -
2011s-36 -
Scaffolding installed. Explored into ~150m passage with draught emerging from slots at bases of deep climbs.
To be surveyed.