MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#2964 Not Too Bad Pot
Ozana - 30T 0455263 4794458 Altitude: 495m - Length: 241m Depth: 195m
Website description for site 2964   |   Site in context, area map

Extra notes from card index
• Easter 09 - Survey to be drawn up.
• L11W: email - photos captions + additions to survey

Dated logbook entries with card index notes

2008

March 29th - Easter log - 2008e-67; 2008e-70 - (Eldon log) Ridge between the doline of 2963 and "the one behind". 18m shaft (disto). Stones with a lucky bounce carry on.
April 11th - Easter log - 2008e-85
August 22nd - summer log - 2008s-87 - Exploration. GPS is now above.
August 23rd - summer log - 2008s-87 - exploration
August 24th - summer log - 2008s-87 - exploration. survey TL=86m d=65m

2011

April 22nd - Easter log - 2011e-18 - Hole @ base snappered. Now needs small person.
April 24th - Easter log - 2011e-25 - Bolts placed for Y-hang but needs even smaller person, or more enlargement.
May 30th - Whit log - 2011w-02

2015

April 6th - Easter log - 2015e-22; 2015e-23; 2015e-41 - Extended downwards by enlarging pitch heads p12 + p9 (continues)
April 7th - Easter log - 2015e-26; 2015e-27 - Draughting. Surveyed 2964_15_01 36.6m new TL=86+36.6 = 122.6m d=65+30 = 95m Big pitch top reached - some enlargement.
April 8th - Easter log - 2015e-30 - Down most of the big pitch. TL=122.6+58 = 180.6m d=161m
April 9th - Easter log - 2015e-41
April 13th - Easter log - 2015e-32; 2015e-33; 2015e-41 - Next pitch dropped. 241m D=195m Beyond looks tight but possible.

2016

March 14th - Easter log - 2016e-04; 2016e-05 - Rigged down to last pitch. Quite wet. Solo trip: Simon Cornhill
March 20th - Easter log - 2016e-09 - "Not draughting" when looked at on a cold day.
March 22nd - Easter log - 2016e-13 - Constriction at base snappered. 4" wide LH bend stops progress.
March 27th - Easter log - 2016e-24 - More snappering. Water reached.
March 29th - Easter log - 2016e-29 - More snappering. Needs a draught to encourage further work. Derigged.

Published documents: print and digital

• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p19, 22