March 26th - Easter log -
2008e-49 -
Lintled entrance to man-made fridge leads to small tube with continuation.
'Required dig and small caver'
August 1st - summer log -
2008s-41;
2008s-42;
2008s-43;
2008s-44
March 30th - Easter log -
2013e-36
March 31st - Easter log -
2013e-36;
2013e-43
August 1st - summer log -
2013s-29;
2013s-30 -
Extended into maze and large passage.
Survey done - length included in next batch.
August 2nd - summer log -
2013s-36 -
More exploration and survey. Maze.
TL=320m Side passages still to survey.
August 6th - summer log -
2013s-48;
2013s-49;
2013s-49 -
More exploration and survey.
TL=466m
August 7th - summer log -
2013s-53 -
Ditto. TL = 675m
August 8th - summer log -
2013s-65;
2013s-65 -
Exploration. No survey.
Into new higher level.
August 12th - summer log -
2013s-69 -
Higher level surveyed. TL=910 (on DistoX). NMew =235m
August 13th - summer log -
2013s-70 -
New 195m TL = 1105m
August 18th - summer log -
2013s-83 -
Down pitch new = 90m TL=1195m
August 20th - summer log -
2013s-85 -
Explore and survey.
August 21st - summer log -
2013s-85 -
Explore and survey. TL = 1399m
Note new GR. Vert range = 25m
February 18th - Jan-Feb log -
2014jf-01;
2014jf-02 -
(1) Some surveying @ Zorro's Revenge.
(2) A couple of small extensions.
(3) Bedhead Rest - enlarged to the Crocodile Slide - handline.
Maya Teleta.
p15 seen. Loose area.
February 19th - Jan-Feb log -
2014jf-03 -
Maya Teleta survey.
Down Choss Pit - 3 short pitches - 25m rope.
Extension at base of first drop. Capping needed in rift.
February 21st - Jan-Feb log -
2014jf-04;
2014jf-05;
2014jf-07 -
Maya Teleta - capped narrow passage to R of Croc. Slide. Ended after a few metres.
Investigate base of 1st pitch. Almost connected to Lost Chamber.
Photos; survey. Sketch in log book.
New = 163m TL=1562m
December 24th - Xmas - New Year log -
2018c-01;
2018c-02 -
Si and Di talk to land owner.
No chance of entry. Refused. Signs up.