MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#2889 Vaca, Torca La
Hornedo - 30T 0448258 4801193 Altitude: 111m - Length: 23914m Depth: 67m
Website description for site 2889   |   Site in context, area map

Extra notes from card index
• cairn on wall @ 0448356 4801411 ^112 top of ladder (entrance) @ 0448360 4801402 ^106
• L08W Survey from Patrick Warren
• April 2012: Batch 11_01 drawn up (Jess Eades)
• April '13: Jim Lister + Colin Hayward unable to push on upstream around Elephant Sump.
• Summer '13: See 767 for sump details. TL=15542m
• Summer 2014: Check lengths after 27/8/14
• L14A: Finished off surface work @ 3916 BMCH.
• Autumn 2014: Length adjustments 09/8/2013 13_11 15875.0 Hard Knott 14_01 439.5 16314.5 remove duplicate from 9_14 -41.1 16275.5 Frizzington remove old batch completely 10_01 -236.2 16037.3 Frizzington 14_02 790.4 16827.7 Log file for 2889.svx now gives 17005.8, i.e. 178m too long. This is probably due to continuing survey overlap. "Correct" value is probably shorter length. 14_03 242.3 17070.0 14_04 428.1 17498.1
• L16E: See 3916 for that vicinity.
• After Easter 2016: New in Cuba Libre (4182) 16_06 30m + Vaca = 1260m Therefore TL=20376 + 1260 = 21636m
• After Easter 2016: Videos to edit from Si + Di. See summer 2016

Orphan card index date references to logbook pages
• [24/07/2008] Pitch @ S end joined to stn below. Then rift pushed to stream. Draughting rift passed, but needs enlarging
• [29/07/2008] Boulder choke passage surveyed. No obvious way through boulders. Other passages looked at, but no survey. Batch 27 L=70m TL=4163.4m
• [01/08/2008] [Date?] Batch 08_33 31m pitch off high level L=116.3 Batch08_34 Down to Squality Street L=22.2 TL=4685 (some accounts later in log book)
• [04/08/2007] Batch 08_38 L=33.6m TL=5078.5 "50m rift" linked to passage S of 12m pitch
• [10/08/2008] Shafts dropped: Batch 16a replaces 16 35m pitches down to 'base' level. Batch 39 TL=5173
• [17/01/2009] (1) Stal reinstated (2) Bolt to alcove in southern passage.
• [07/04/2009] Climb 40m aven to ramp to boulders possibly below site 3166. Surveyed 286m
• [08/04/2009] Up 'Scafell Aven' (=40m Aven)TL=6299 + 286 = 6585m
• [09/04/2009] (1) Unsuccessful attempt to find sump. (2A) Up Scafell Aven N+S L=456m (B) South of Scafell Aven L=213m Day total = 669m TL=669+6585 = 7254m
• [13/04/2009] 7 in to sump. Only 3 continues to survey batch 09_07 - explored previously - surveyed today L=692m TL=8636m
• [13/08/2009] Batch 09_19 L=227 TL=12798m Batch 09_20 L=120 TL=12918m (About 200m unsurveyed on Eastern inlet at end of 09_19) d=65m
• [15/08/2010] Passage heads north towards site 3300. L=197.4 TL=13581m
• [13/08/2011] Extension around Deep Rifts Passage / Ed's Birthday Passage area. L=86m TL=14426 + 86 = 14512m Batch 11_05
• [05/04/2012] Photos of entrance.
• [26/04/0102] Downstream sump dived through to WIld Mare.
• [27/04/2012] Downstream sump dived through to WIld Mare.
• [28/04/2012] Downstream sump dived through to WIld Mare.
• [29/04/2012] Downstream sump dived through to WIld Mare. Batch 12_01. Some is repeat survey. New = 115.7 TL Vaca = 14512 + 116 = 14628m + Wild Mare length = 594 >> 0 =15222m
• [07/07/2012] Upstream diving.
• [08/07/2012] Upstream diving. Got through to walking passage.
• [09/07/2012] Upstream diving. Into Bassenthwaite. Surveyed length 49m TL=15222+49 = 15271m
• [30/07/2014] Tackled up (not in log)
• [08/04/2015] Specsavers looked at.
• [09/04/2018] Spot sampling for entomology project. Photos.

Dated logbook entries with card index notes

2008

January 17th - Xmas - New Year log - 2008c-06
March 26th - Easter log - 2008e-50 - (Not in log) Discovered. Descended. Surveyed upstream + downstream. Top level to push and survey. TL=392m
March 28th - Easter log - 2008e-56; 2008e-57 - High level explored.
March 29th - Easter log - 2008e-57; 2008e-58 - Further exploration + pushing inlets in Squality Street. 3 teams.
March 30th - Easter log - 2008e-58; 2008e-59; 2008e-70 - Tying up various loose ends
March 31st - Easter log - 2008e-77 - Tying up various loose ends Batches 2889_08_01 to 2889_08_18 TL = 2120.7
April 1st - Easter log - 2008e-72
April 2nd - Easter log - 2008e-78
April 11th - Easter log - 2008e-84
January 1st - Whit log - 2008w-00
July 15th - summer log - 2008s-01 - Photos + looking @ broken stal - rebroken.
July 22nd - summer log - 2008s-11 - (A) Pete Smith extensions @ PS1, PS2 and PS3 on large survey. (B) Deep pitches found near "choke - tree roots above" @ NW side (unexplored) © p30 dropped to water and sumps batch 19 L=115.1 TL = 2235.8 VR = 52m
July 23rd - summer log - 2008s-12; 2008s-14; 2008s-15 - (1) Batch 20: Extended Dingle Pringle Pretty Passage to a s/s choke L=65.5 TL=2301.3m (2) Batch 21: Surveyed long rift off 7-way junction L=69m TL=2370.3m (3) Loose pitch descended - 40m to a choke. See also PS4 + PS5
July 25th - summer log - 2008s-21 - (1) Yesterday final survey Batch 8_22 L=110.5m TL=2480.8m (2) Draughting rift snappered; stream reached with wide sump; 8cm airspace with strong draught.
July 26th - summer log - 2008s-22; 2008s-23 - Through duck to big passage, still going. L=239.1 TL=2719.9m
July 27th - summer log - 2008s-26; 2008s-27; 2008s-28 - 2 survey / push teams in: streamway then high level explored. Batch 24: 559-7 Batch 25: 434.4 Batch 26: 379.4 TL=2719.9 + 1373.5 = 4093.4m Still open @ boulder choke end.
July 30th - summer log - 2008s-37 - 2 teams in to clear up + survey yesterday's scampering Batch 28 L=99.6; Batch 29 L=98.6; Batch 22A - Resurvey Whitworth World (top) 51.4 Batch 30 25.1; Batch 31 42.8; Batch 32 65.7 L=383.2m TL=4546.5m
July 31st - summer log - 2008s-38 - (1) Photos long rift (2) Explored pitches @ NW side (3) Re-rigged p12.
August 2nd - summer log - 2008s-52; 2008s-65
August 3rd - summer log - 2008s-45; 2008s-52; 2008s-65; 2008s-66 - Side passage near end Batch 08_35 L=91.4 Precarious Passage joined to slit near entrance. L=125.8 Batch 08_36 Batch 37_Resurvey of Rift off 7-way chamber + pitch + aven TL=5044.9m
August 4th - summer log - 2008s-52; 2008s-57
August 7th - summer log - 2008s-64
August 12th - summer log - 2008s-71 - (1) Alternative route to p12 surveyed. Batch 40. (2) Passage up from pitch base @ Lake Bassenthwaite (41) (3) Tight pitch down to river opened up and rope through duck tidied up.
August 17th - summer log - 2008s-80; 2008s-82 - (1) Whitworth Challenge (very tight) surveyed 08_42 L=24.5 (2) Leg-over Passage 08_43 43.9m (3) Resurvey pitch to lake (4) Getting to know system trip.
August 18th - summer log - 2008s-82; 2008s-82; 2008s-83; 2008s-83 - Extended off Mancunian Candidate but not surveyed back. Batch 08_45 L=450m
August 21st - summer log - 2008s-82; 2008s-83 - Linking passage surveyed in water. Batch 08_47 L=430m TL = 6167m
August 28th - summer log - 2008s-89 - Aquainting trip
August 31st - summer log - 2008s-87; 2008s-87; 2008s-91; 2008s-91 - Whites Haven extension L132.3m TL = 6299m Also passages from old choke back towards Whites Haven looked at, but not surveyed.
January 1st - autumn log - 2008a-01; 2008a-08; 2008a-09; 2008a-10; 2008a-11; 2008a-12; 2008a-13
January 1st - autumn log - 2008a-24
November 5th - autumn log - 2008a-20 - Cleaning of formations. Remove part of Penguin Passsage stal for repair.

2009

April 3rd - Easter log - 2009e-07 - Tackled up 'preferred route' Survey detail added to HL beyond sump.
April 4th - Easter log - 2009e-08 - Tourist trip.
April 6th - Easter log - 2009e-14
April 10th - Easter log - 2009e-23; 2009e-31 - (1) Tourist trip (2) Batches 09_03 32.1m up aven 09_04 210m
April 11th - Easter log - 2009e-23; 2009e-35; 2009e-45 - (1) Top level choke poked in. (2) End of cave up boulders. Terminally choked. 20.53 Total L=262.6 Batch 09_05 TL = 7516.4m
April 12th - Easter log - 2009e-29; 2009e-38; 2009e-39 - (1) Batch 09_06 Surveyed beyond sump high level to rifts TL=7516.4 + 427.2 = 7943.6m (2) More found on top level but not surveyed. (3) Jim Lister dive upstream Buttermere. (4) Traverse out in heading S off N sandstone chamber. Pinches out.
April 14th - Easter log - 2009e-44 - Derigging from Buttermere
April 18th - Easter log - 2009e-55 - Detackled. Only traverse line left on Descriptions of passages at end of Easter 09 log.
January 1st - Easter log - 2009e-67; 2009e-69; 2009e-71
August 4th - summer log - 2009s-40 - Tackled up. (1) Radios to try 3166 link - failed. (2) Scaled aven into passage. Batch 09_08 L=127.4m TL=8763m Side loop surveyed. Batch 09_09 64m TL=8827m
August 6th - summer log - 2009s-41 - (1) Altered + additions to batch 09_09 L=459 TL=8827-64+459=9222m (2) Additions at end Batch 09_10 611.45m; 09_11 91m; 09_12 100m; total 802m TL=10024m
August 8th - summer log - 2009s-41; 2009s-42 - Batch 09_13 L=30 TL=10054m Batch 09_14 L=756 TL=10810m Batch 09_15 L=866 TL=11676m Batch 09_16 L=74 TL=11750m Batch 09_17 L=231 TL=11981m Batch 09_18 L=590 TL=12571m

2010

April 1st - Easter log - 2010e-12 - Batch 10_02 127.5m TL=13046m batch 10_01 236m TL=13282m
April 13th - Easter log - 2010e-35 - Detackled.
August 10th - summer log - 2010s-40 - Tourist trip through Lake Bassenthwaite for some. 3 continued to survey new side passages. Batch 10_3 34m (10-4 connecting) 10-5 68m = 102m new TL=13384m
August 17th - summer log - 2010s-67; 2010s-68 - Batch 10_07 L=143m Batch 10_08 past 3300 L=50m TL = 193 + 13581 = 13774m

2011

January 1st - Easter log - 2011e-25; 2011e-26
April 18th - Easter log - 2011e-09 - Tackled up to the duck.
April 19th - Easter log - 2011e-12; 2011e-13; 2011e-15 - (1) Pushed at end. 229.2m Batch 2889_11_01 (2) Pushed up inlet 246m Batch 2889_11_02 475m + 13774 TL=14249m (2 accounts later in log)
April 23rd - Easter log - 2011e-24 - Batch 11_03 links 2 known stations 118m TL=14367m Detackled. Description in log book.
May 16th - Easter log - 2011e-55 - Jim Lister + Colin Hayward tackle up cave to Buttermere.
May 17th - Easter log - 2011e-55 - Dive gear in.
May 18th - Easter log - 2011e-55; 2011e-57 - Dive 25m downstream to chamber + second sump. Grade 1 survey may be suspect. Length not added to 2889 length. May or may not be upstream of Wild Eels Sump. Detackle.
May 19th - Easter log - 2011e-55
May 22nd - Easter log - 2011e-56
May 23rd - Easter log - 2011e-58
May 24th - Easter log - 2011e-58 - Length of 59m now added 14367+59 = 14426m
June 14th - Whit log - 2011w-04
July 24th - summer log - 2011s-13 - Dowsing over end of the "La Gatuna" inlet (Suit Wrecker)

2012

February 9th - Jan-Feb log - 2012jf-04; 2012jf-05
January 1st - Easter log - 2012e-51; 2012e-52; 2012e-53; 2012e-54
July 27th - summer log - 2012s-10 - Tackled down to lake.
August 7th - summer log - 2012s-47
August 8th - summer log - 2012s-47
August 9th - summer log - 2012s-47
August 10th - summer log - 2012s-45; 2012s-47
December 30th - Xmas - New Year log - 2012c-03

2013

March 26th - Easter log - 2013e-35 - Tackled up. Water in Bassenthwaite high. (2 accounts)
March 31st - Easter log - 2013e-13; 2013e-17 - Photos on the top level.
April 1st - Easter log - 2013e-19
April 4th - Easter log - 2013e-23 - Wrong Trousers excavated through to stand-up, going routes.
April 7th - Easter log - 2013e-49; 2013e-49 - Also on 7/4/13: New pitch (4m) down off entrance pitch. Loose boulders. Stooping height passage leads off.
April 8th - Easter log - 2013e-54; 2013e-55; 2013e-56 - Passages from previous day surveyed. Batch 13_01 replaced by larger 13_01 Total new =207m + 15271 = 15478m
July 31st - summer log - 2013s-26
January 1st - summer log - 2013s-45; 2013s-46
August 1st - summer log - 2013s-30
August 3rd - summer log - 2013s-40
August 4th - summer log - 2013s-42 - Tackle up planned overnight(s) trip tomorrow. Photograph.
August 5th - summer log - 2013s-53; 2013s-54; 2013s-55; 2013s-56; 2013s-57; 2013s-58; 2013s-59; 2013s-60; 2013s-61 - 2 night camp N of Jack's Rake.
August 6th - summer log - 2013s-49; 2013s-50; 2013s-53; 2013s-54; 2013s-55; 2013s-56; 2013s-57; 2013s-58; 2013s-59; 2013s-60; 2013s-61 - 2 night camp N of Jack's Rake. 1 team out to take in Molephone. Molephoning above Wasdale Screes.
August 7th - summer log - 2013s-53; 2013s-54; 2013s-55; 2013s-56; 2013s-57; 2013s-58; 2013s-59; 2013s-60; 2013s-61 - 2 night camp N of Jack's Rake. Batches 13_04, 13_05, 13_06, 13_07 surveyed Lengths = 18+54+62+64 = 198m TL = 15740m Also batches 13_08, 13_09 25+44m = 69m TL = 15809m NOTE: Batch 13_09 linked end of Frizzington Extension with passage to east. survey of F.E. is well out?
August 9th - summer log - 2013s-67 - Wrong Trousers. Explore up c4m but closed in. L=44m batch 13_11 Also bouldery series back under entrance off base of p into Wrong Trousers L=22 batch 13_10 TL=15875m
August 17th - summer log - 2013s-79

2014

July 31st - summer log - 2014s-22; 2014s-23 - Voice, smoke, hammering, molephone, radio connections with 3916 Calf Hole @ Wasdale Screes area.
August 8th - summer log - 2014s-44; 2014s-45; 2014s-46; 2014s-47 - More smoke testing. Joss sticks. Dig now appears to be over the left hand boulder choke. Also dug into passage first spotted 31/7/14 on east side. Pitches and going lead.
August 15th - summer log - 2014s-58; 2014s-59; 2014s-60; 2014s-61; 2014s-62 - Connected to 3916 part way up slope @ Wasdale Screes. See 3916 for BigMat Calf Hole entrance activities.
August 17th - summer log - 2014s-65; 2014s-66 - BMCH: Pitch rigged and extension @ Wasdale Screes surveyed 108m. Hard Not Pass [sic]
August 18th - summer log - 2014s-66; 2014s-67 - Further surveying: "Pity the Fool"
August 19th - summer log - 2014s-67 - Hard Not Pass. Survey up to BMCH entrance bolt Whole batch 14-01
August 21st - summer log - 2014s-69 - White havens investigation.
August 22nd - summer log - 2014s-69 - Investigate Frizzington Extensions discrepancy.
August 24th - summer log - 2014s-70 - Investigate Frizzington Extensions discrepancy.
August 25th - summer log - 2014s-70 - Investigate Frizzington Extensions discrepancy.
August 26th - summer log - 2014s-70 - Investigate Frizzington Extensions discrepancy.
August 27th - summer log - 2014s-71 - Investigate Frizzington Extensions discrepancy. + detackle main entrance. 14_02
November 10th - autumn log - 2014a-02 - Trips to try to find route through to the end.
November 11th - autumn log - 2014a-02 - Trips to try to find route through to the end.
November 12th - autumn log - 2014a-02; 2014a-03 - Leads near Nearly Dan Chamber looked at. Big passage and excellent formations. 14_03 L=242.3 Fanny Bramble Passage 14_04 L=428.1m
December 24th - Xmas - New Year log - 2014c-01 - Housekeeping trip to Henry's Way. No 1 Haverflatts Lane is best route.
December 26th - Xmas - New Year log - 2014c-01 - Under E wall of Nearly Dan Chamber. Roa Island batch 14_05 L=89.8m + 17498.1 =17587.9
December 27th - Xmas - New Year log - 2014c-01 - Side passage @ start of Help Me Lloyd. 215m surveyed Batch 14_06 "Let it Snow" L=215 + 17587.9 = 17802.9
December 29th - Xmas - New Year log - 2014c-01 - (1) 100m upstream of La Gatuna inlet: 61m W-heading extension "Meathop Passage" Batch 14_07 L=61+5+17802.9 TL = 17864.4 (2) "Grange-over-Sands" @ S end of Henry's Way Batch 14_08 L=140.2 + 17864.4 = 18004.6m
December 30th - Xmas - New Year log - 2014c-01 - (1) "Rooze Chamber" Batch 14_09 L=80 TL=18085.4 (2) Oxbow in Frizzington Batch 14_10 L=29.2 TL=18114.6m
December 31st - Xmas - New Year log - 2014c-02 - Oxbow on High Street Batch 14_11 L=69.3 TL=18183.9

2015

January 1st - Xmas - New Year log - 2014c-02 - Resurvey of S heading passage Total surveyed = 338m of which "Should Have Gone to Surveying School" is 115.2 TL=18299.1m (Xmas surveying: 801m 'new passage' + 223m resurvey)
April 1st - Easter log - 2015e-07; 2015e-22; 2015e-41 - (1) Leads on the "Should Have Gone to Surveying School" Most small. 128.8m surveyed (batch 15_02) TL=18425.9m (2) Shaft in Deep Rifts Passage dropped. p30 Batch 15_01 L=64.6 TL=18490.5m (2 accounts)
April 3rd - Easter log - 2015e-13; 2015e-14; 2015e-16; 2015e-41 - Pushing at end of Deep Rifts Passage. Opened up to a rift / aven Batch 15_03 L=29.7 TL=18520.2 (2 log book accounts)
April 4th - Easter log - 2015e-35 - Climb up into 3m shown @ Red Pike. Long term dig.
April 5th - Easter log - 2015e-24 - Passage heading SW from Nearly Dan Chamber. No significant finds. Photos here and in SHGTSS.
April 7th - Easter log - 2015e-28 - Aquaintance trip to SHGTSSavers area.
April 9th - Easter log - 2015e-31 - Dropped p7m at R of end choke in SHGTSS area. Found p not on survey 20m back from choke on NE side. Not dropped. May go to passage under? No passage under.
April 11th - Easter log - 2015e-31; 2015e-32 - Check end of cave S of Henry's Chamber. End choke looked at. No way on. At 5 ways Chamber - 3 side passages marked ? all end after a few metres.
April 14th - Easter log - 2015e-33; 2015e-41 - Entrance is slumping. Survey + resurvey around Frizzington. Batch 15_05 81m new 15_06 206m new TL=18807m
April 15th - Easter log - 2015e-34; 2015e-41 - Batch 15_04 "Doldy's Draughting Passage. Still going. Length = 5mm TL=18862m
July 30th - summer log - 2015s-13; 2015s-14 - 4117 Ciervo drops down pitch into Vaca p35. Total length = 19388 (491+35+18862)
August 2nd - summer log - 2015s-21; 2015s-25 - Tourist trip top level.
August 5th - summer log - 2015s-26; 2015s-27; 2015s-28 - Pushed at end of Deep Rifts Passage Batch 15_08 goes to surface: Cuba Libre entrance (4182) L=24.5 Batch 15_07 = 39.5 End of Deep Rifts. TL=19388 + 64 = 19452m
August 6th - summer log - 2015s-36 - Push around Cuba Libre / Deep Rifts. Batch 15_09 L=12m TL=19464m
August 13th - summer log - 2015s-47; 2015s-48 - Push Doldy's Draughting Rift. Bolting traverses + ~100m passages ends @ edge of large shaft. Heading towards site 3300. Batch 15_10 length = 100.7m TL=19565m
October 14th - autumn log - 2015a-04 - Surveyed down from 4117. TL now = 19571m
November 11th - autumn log - 2015a-09 - Extended Suit Wrecker Inlet up RH passage off. Named 'Bernard'. Batch 15_11 L=214m TL=19785m
November 13th - autumn log - 2015a-10; 2015a-11 - Pushed on a t end of Suitwrecker Inlet. Ends in choke. 15hr trip. Batch 15_12 L=591m TL=20376m Also see log book skecth for more detail of passages at Suitwrecker 4, 5, 6.

2016

March 16th - Easter log - 2016e-05 - (1) Clear out mud slump in BMCH entrance. (2) Doldy's D. R: Lower level @ end is blind. Opening above bolt climbed ~4m. Continued L to breakdown and R is a hole in rift - worth investigating.
March 17th - Easter log - 2016e-07 - Traverse line put in on route to Pont Aven. DistoC2 not working. All leads checked out on red level to east of Scafell Aven. Bolt climb here needs doing.
March 19th - Easter log - 2016e-08 - Surveyed Maze of Tight Cross Rifts. Batch 16_01 (added to total later)
March 20th - Easter log - 2016e-09 - Ascended bolt climb up to NE of Scafell Aven. At top (c5?) 6 - 7m of passage goes to muddy traverse to where it closes in. May be chamber above? Batch 16_02 L=24m TL=20400m
March 21st - Easter log - 2016e-10 - Continued surveying rifts S of Botchergate. Ended in water (swimming)
March 24th - Easter log - 2016e-16; 2016e-17 - More passage surveyed off F. @ Botchergate. dseep water upstream. Sumped after 130m Batche 16_01 = 1018.4m; 16_03 = 103.6m TL=20400 + 1122 = 21522m
March 28th - Easter log - 2016e-25
March 31st - Easter log - 2016e-35 - Passages pushed around "Buzzin gets Closer" Surveyed batches 16_04 + 16_05 L=71m TL=21522 + 71 = 21593m
June 11th - summer log - 2016s-01
July 24th - summer log - 2016s-15; 2016s-60 - Various surveys: 16_07 38.85m; 16_08 31.79m; 16_09 159.29m; 16_10 91.35m
July 25th - summer log - 2016s-09 - Pushed end of Frizzington Extensions. Flat out enters chamber after dig. Slide down into well decorated passage then step over 4m deep pot. Sandy crawl to a 6m rift, climb down then an undescended p10. Not surveyed.
July 27th - summer log - 2016s-17; 2016s-17; 2016s-18; 2016s-19; 2016s-60 - (1) Note about goat knocking rock topwards hole. Keep cover over hole at all times. (2) Surveying green level (see next trip) around Whitehavens area 16_11
July 28th - summer log - 2016s-21; 2016s-60 - ditto Batch 16_11 =593.09 in total Down to Tuna Can Corner.
July 30th - summer log - 2016s-23; 2016s-24; 2016s-60 - Batch 16_12 around Tuna Can Corner and Mancunian Candidate. Then 16_13 Boulder choke area survey. 16_12 = 295m; 16_13 =107.2m *See later*
August 1st - summer log - 2016s-26; 2016s-60 - Extending 1st Terminal Choke + Shoulder of Mutton areas. 16_12 + 16_13 extended.
August 3rd - summer log - 2016s-29
August 4th - summer log - 2016s-33; 2016s-34; 2016s-60 - Explored and surveyed past 1st Terminal Choke + around Rib Tickler. Shoulder of Mutton 12 hr trip. Total length surveyed 16S (summer 2016) = 1967.4m?
August 6th - summer log - 2016s-50; 2016s-60 - Batch 16_15 @ end of Doldy's Rift. Ends in boulder choke Also 16_16 in Frizzington Extensions. 16_15 - 51m; 16_16 - 20m Total corrected new for summer = 1799.5 + 21636 TL = 23435.5m
August 7th - summer log - 2016s-48 - Tourist trip via BMCH. Photos.
December 26th - Xmas - New Year log - 2016c-01 - Via BigMat Calf Hole, checked out base of SF Aven to Penrith HMT Duck. Nothing much found.
December 28th - Xmas - New Year log - 2016c-02 - Via BigMat to SpecSavers. Nothing new found.
December 31st - Xmas - New Year log - 2016c-02 - Via BMCH. Resurveyed Fred Whitton Series to just N of Scafell Aven sorting out the "confused and confusing" area that needs redrawing.

2017

April 10th - Easter log - 2017e-07; 2017e-08 - Revisiting Mad Arse area.
July 28th - summer log - 2017s-09; 2017s-10; 2017s-11 - Mad Arse area revisited + water route surveyed. Batch 2889_17_01 L=104m TL=23540m
August 12th - summer log - 2017s-43 - Banger No 5 pushed for 28.5m TL=23540+29 = 23569m
August 16th - summer log - 2017s-54 - Far end of Frizzington 17_02 L=127 TL=23696m 3 x 13m pitches investigated.

2018

February 8th - Jan-Feb log - 2018jf-08; 2018jf-10 - Entrance has permanent bolt. Visit to high level chokes + passages @ end of top level. Could be dug in draughty weather. 2 accounts
April 3rd - Easter log - 2018e-60 - Andy P stuck for about 45 minutes on p14. Released by Jim D using rope and pulleys.
April 10th - Easter log - 2018e-57
April 13th - Easter log - 2018e-72 - Dig in high level choke. No go.
April 17th - Easter log - 2018e-67 - Entrance to BMCH in good order. various extensions after trip to Scafell Aven. Batch 18_01 L=35.2m Batch 18_02 L=52.2m TL = 87.4 + 23696 = 23783m
August 1st - summer log - 2018s-19 - French visit with PS to view gypsum near to BMCH entrance.
December 25th - Xmas - New Year log - 2018c-02; 2018c-09 - Tourist trip BigMat to High Street Oxbow

2019

April 18th - Easter log - 2019e-29; 2019e-53 - Trip to check out possible leads but all had been done. (2 accounts)
April 27th - Easter log - 2019e-51 - Pitfall traps removed + photos + spot collecting.
August 1st - summer log - 2019s-14 - (1) Dropped p20 @ end of "Help Me Lloyd" traverse. Blind. (2) Photos Kendal Mint Cake
August 17th - summer log - 2019s-45 - Route finding trip for Jim Lister to dive sump (from 3916)
August 18th - summer log - 2019s-50 - Solo trip transport gear in.
August 19th - summer log - 2019s-50 - Detail added / changed at Elephant Sump and south in stream from Bassenthwaite.
August 21st - summer log - 2019s-52 - Kit out. Solo trip.

2021

July 24th - summer log - 2021s-07 - Surveyed between Satterthwaite Tarn Chamber and Cockup. 131m new surveyed. 2889_21_01 TL=23783+131 = 23914m

2022

April 6th - Easter log - 2022e-02 - Water level high @ Scafell Aven area. Small find at Tuna Can Corner. Sketch in log book.

2023

November 9th - autumn log - 2023a-21 - Familiarisation trip form BMCH to start of Suit Wrecker. Join Cuba Libre to Vaca on survey.

2025

February 10th - Xmas- New Year log - 2024c-31

Published documents: print and digital

• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• pp18-23 - p18(p), 19, 20(p), 20-21(s)(p), 22(p), 23
• [FN] Corrin Juan, 2010 Expedition Report: Matienzo, Spain 2009 Speleology Issue 16, December 2010 BCRA
• pp12-14 - Summary.
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• p271 - Description. Line survey.
• [FP] Corrin Juan, 2011 Expedition Report: Matienzo 2010 Speleology Issue 17, March 2011 BCRA
• p9,10 - p9 photo, p10 Summary + photo.
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p11,12 - Summary.
• [GH] Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• p43 - On map (postulated hydrology)