2008
January 17th - Xmas - New Year log -
2008c-06
March 26th - Easter log -
2008e-50 -
(Not in log) Discovered. Descended. Surveyed upstream + downstream.
Top level to push and survey.
TL=392m
March 28th - Easter log -
2008e-56;
2008e-57 -
High level explored.
March 29th - Easter log -
2008e-57;
2008e-58 -
Further exploration + pushing inlets in Squality Street. 3 teams.
March 30th - Easter log -
2008e-58;
2008e-59;
2008e-70 -
Tying up various loose ends
March 31st - Easter log -
2008e-77 -
Tying up various loose ends
Batches 2889_08_01 to 2889_08_18
TL = 2120.7
April 1st - Easter log -
2008e-72
April 2nd - Easter log -
2008e-78
April 11th - Easter log -
2008e-84
January 1st - Whit log -
2008w-00
July 15th - summer log -
2008s-01 -
Photos + looking @ broken stal - rebroken.
July 22nd - summer log -
2008s-11 -
(A) Pete Smith extensions @ PS1, PS2 and PS3 on large survey.
(B) Deep pitches found near "choke - tree roots above" @ NW side (unexplored)
© p30 dropped to water and sumps batch 19 L=115.1
TL = 2235.8 VR = 52m
July 23rd - summer log -
2008s-12;
2008s-14;
2008s-15 -
(1) Batch 20: Extended Dingle Pringle Pretty Passage to a s/s choke L=65.5
TL=2301.3m
(2) Batch 21: Surveyed long rift off 7-way junction
L=69m TL=2370.3m
(3) Loose pitch descended - 40m to a choke.
See also PS4 + PS5
July 25th - summer log -
2008s-21 -
(1) Yesterday final survey Batch 8_22 L=110.5m
TL=2480.8m
(2) Draughting rift snappered; stream reached with wide sump; 8cm airspace with strong draught.
July 26th - summer log -
2008s-22;
2008s-23 -
Through duck to big passage, still going. L=239.1
TL=2719.9m
July 27th - summer log -
2008s-26;
2008s-27;
2008s-28 -
2 survey / push teams in: streamway then high level explored.
Batch 24: 559-7
Batch 25: 434.4
Batch 26: 379.4
TL=2719.9 + 1373.5 = 4093.4m
Still open @ boulder choke end.
July 30th - summer log -
2008s-37 -
2 teams in to clear up + survey yesterday's scampering
Batch 28 L=99.6; Batch 29 L=98.6;
Batch 22A - Resurvey Whitworth World (top) 51.4
Batch 30 25.1; Batch 31 42.8; Batch 32 65.7
L=383.2m TL=4546.5m
July 31st - summer log -
2008s-38 -
(1) Photos long rift
(2) Explored pitches @ NW side
(3) Re-rigged p12.
August 2nd - summer log -
2008s-52;
2008s-65
August 3rd - summer log -
2008s-45;
2008s-52;
2008s-65;
2008s-66 -
Side passage near end Batch 08_35 L=91.4
Precarious Passage joined to slit near entrance. L=125.8 Batch 08_36
Batch 37_Resurvey of Rift off 7-way chamber + pitch + aven
TL=5044.9m
August 4th - summer log -
2008s-52;
2008s-57
August 7th - summer log -
2008s-64
August 12th - summer log -
2008s-71 -
(1) Alternative route to p12 surveyed. Batch 40.
(2) Passage up from pitch base @ Lake Bassenthwaite (41)
(3) Tight pitch down to river opened up and rope through duck tidied up.
August 17th - summer log -
2008s-80;
2008s-82 -
(1) Whitworth Challenge (very tight) surveyed 08_42 L=24.5
(2) Leg-over Passage 08_43 43.9m
(3) Resurvey pitch to lake
(4) Getting to know system trip.
August 18th - summer log -
2008s-82;
2008s-82;
2008s-83;
2008s-83 -
Extended off Mancunian Candidate but not surveyed back. Batch 08_45 L=450m
August 21st - summer log -
2008s-82;
2008s-83 -
Linking passage surveyed in water. Batch 08_47
L=430m TL = 6167m
August 28th - summer log -
2008s-89 -
Aquainting trip
August 31st - summer log -
2008s-87;
2008s-87;
2008s-91;
2008s-91 -
Whites Haven extension L132.3m TL = 6299m
Also passages from old choke back towards Whites Haven looked at, but not surveyed.
January 1st - autumn log -
2008a-24
November 5th - autumn log -
2008a-20 -
Cleaning of formations. Remove part of Penguin Passsage stal for repair.
2009
April 3rd - Easter log -
2009e-07 -
Tackled up 'preferred route'
Survey detail added to HL beyond sump.
April 4th - Easter log -
2009e-08 -
Tourist trip.
April 6th - Easter log -
2009e-14
April 10th - Easter log -
2009e-23;
2009e-31 -
(1) Tourist trip
(2) Batches 09_03 32.1m up aven
09_04 210m
April 11th - Easter log -
2009e-23;
2009e-35;
2009e-45 -
(1) Top level choke poked in.
(2) End of cave up boulders. Terminally choked. 20.53 Total L=262.6
Batch 09_05 TL = 7516.4m
April 12th - Easter log -
2009e-29;
2009e-38;
2009e-39 -
(1) Batch 09_06 Surveyed beyond sump high level to rifts
TL=7516.4 + 427.2 = 7943.6m
(2) More found on top level but not surveyed.
(3) Jim Lister dive upstream Buttermere.
(4) Traverse out in heading S off N sandstone chamber. Pinches out.
April 14th - Easter log -
2009e-44 -
Derigging from Buttermere
April 18th - Easter log -
2009e-55 -
Detackled. Only traverse line left on
Descriptions of passages at end of Easter 09 log.
January 1st - Easter log -
2009e-67;
2009e-69;
2009e-71
August 4th - summer log -
2009s-40 -
Tackled up.
(1) Radios to try 3166 link - failed.
(2) Scaled aven into passage. Batch 09_08 L=127.4m TL=8763m
Side loop surveyed. Batch 09_09 64m
TL=8827m
August 6th - summer log -
2009s-41 -
(1) Altered + additions to batch 09_09
L=459 TL=8827-64+459=9222m
(2) Additions at end
Batch 09_10 611.45m; 09_11 91m; 09_12 100m; total 802m
TL=10024m
August 8th - summer log -
2009s-41;
2009s-42 -
Batch 09_13 L=30 TL=10054m
Batch 09_14 L=756 TL=10810m
Batch 09_15 L=866 TL=11676m
Batch 09_16 L=74 TL=11750m
Batch 09_17 L=231 TL=11981m
Batch 09_18 L=590 TL=12571m
2010
April 1st - Easter log -
2010e-12 -
Batch 10_02 127.5m TL=13046m
batch 10_01 236m TL=13282m
April 13th - Easter log -
2010e-35 -
Detackled.
August 10th - summer log -
2010s-40 -
Tourist trip through Lake Bassenthwaite for some.
3 continued to survey new side passages.
Batch 10_3 34m (10-4 connecting) 10-5 68m = 102m new
TL=13384m
August 17th - summer log -
2010s-67;
2010s-68 -
Batch 10_07 L=143m
Batch 10_08 past 3300 L=50m
TL = 193 + 13581 = 13774m
2011
January 1st - Easter log -
2011e-25;
2011e-26
April 18th - Easter log -
2011e-09 -
Tackled up to the duck.
April 19th - Easter log -
2011e-12;
2011e-13;
2011e-15 -
(1) Pushed at end. 229.2m Batch 2889_11_01
(2) Pushed up inlet 246m Batch 2889_11_02
475m + 13774
TL=14249m (2 accounts later in log)
April 23rd - Easter log -
2011e-24 -
Batch 11_03 links 2 known stations 118m
TL=14367m
Detackled. Description in log book.
May 16th - Easter log -
2011e-55 -
Jim Lister + Colin Hayward tackle up cave to Buttermere.
May 17th - Easter log -
2011e-55 -
Dive gear in.
May 18th - Easter log -
2011e-55;
2011e-57 -
Dive 25m downstream to chamber + second sump. Grade 1 survey may be suspect.
Length not added to 2889 length.
May or may not be upstream of Wild Eels Sump.
Detackle.
May 19th - Easter log -
2011e-55
May 22nd - Easter log -
2011e-56
May 23rd - Easter log -
2011e-58
May 24th - Easter log -
2011e-58 -
Length of 59m now added 14367+59 = 14426m
June 14th - Whit log -
2011w-04
July 24th - summer log -
2011s-13 -
Dowsing over end of the "La Gatuna" inlet (Suit Wrecker)
2012
February 9th - Jan-Feb log -
2012jf-04;
2012jf-05
January 1st - Easter log -
2012e-51;
2012e-52;
2012e-53;
2012e-54
July 27th - summer log -
2012s-10 -
Tackled down to lake.
August 7th - summer log -
2012s-47
August 8th - summer log -
2012s-47
August 9th - summer log -
2012s-47
August 10th - summer log -
2012s-45;
2012s-47
December 30th - Xmas - New Year log -
2012c-03
2013
March 26th - Easter log -
2013e-35 -
Tackled up. Water in Bassenthwaite high. (2 accounts)
March 31st - Easter log -
2013e-13;
2013e-17 -
Photos on the top level.
April 1st - Easter log -
2013e-19
April 4th - Easter log -
2013e-23 -
Wrong Trousers excavated through to stand-up, going routes.
April 7th - Easter log -
2013e-49;
2013e-49 -
Also on 7/4/13: New pitch (4m) down off entrance pitch. Loose boulders. Stooping height passage leads off.
April 8th - Easter log -
2013e-54;
2013e-55;
2013e-56 -
Passages from previous day surveyed.
Batch 13_01 replaced by larger 13_01
Total new =207m + 15271 = 15478m
July 31st - summer log -
2013s-26
January 1st - summer log -
2013s-45;
2013s-46
August 1st - summer log -
2013s-30
August 3rd - summer log -
2013s-40
August 4th - summer log -
2013s-42 -
Tackle up planned overnight(s) trip tomorrow. Photograph.
August 5th - summer log -
2013s-53;
2013s-54;
2013s-55;
2013s-56;
2013s-57;
2013s-58;
2013s-59;
2013s-60;
2013s-61 -
2 night camp N of Jack's Rake.
August 6th - summer log -
2013s-49;
2013s-50;
2013s-53;
2013s-54;
2013s-55;
2013s-56;
2013s-57;
2013s-58;
2013s-59;
2013s-60;
2013s-61 -
2 night camp N of Jack's Rake.
1 team out to take in Molephone.
Molephoning above Wasdale Screes.
August 7th - summer log -
2013s-53;
2013s-54;
2013s-55;
2013s-56;
2013s-57;
2013s-58;
2013s-59;
2013s-60;
2013s-61 -
2 night camp N of Jack's Rake.
Batches 13_04, 13_05, 13_06, 13_07 surveyed
Lengths = 18+54+62+64 = 198m
TL = 15740m
Also batches 13_08, 13_09 25+44m = 69m
TL = 15809m NOTE: Batch 13_09 linked end of Frizzington Extension with passage to east.
survey of F.E. is well out?
August 9th - summer log -
2013s-67 -
Wrong Trousers. Explore up c4m but closed in. L=44m batch 13_11
Also bouldery series back under entrance off base of p into Wrong Trousers L=22 batch 13_10
TL=15875m
August 17th - summer log -
2013s-79
2014
July 31st - summer log -
2014s-22;
2014s-23 -
Voice, smoke, hammering, molephone, radio connections with 3916 Calf Hole @ Wasdale Screes area.
August 8th - summer log -
2014s-44;
2014s-45;
2014s-46;
2014s-47 -
More smoke testing. Joss sticks. Dig now appears to be over the left hand boulder choke.
Also dug into passage first spotted 31/7/14 on east side. Pitches and going lead.
August 15th - summer log -
2014s-58;
2014s-59;
2014s-60;
2014s-61;
2014s-62 -
Connected to 3916 part way up slope @ Wasdale Screes.
See 3916 for BigMat Calf Hole entrance activities.
August 17th - summer log -
2014s-65;
2014s-66 -
BMCH: Pitch rigged and extension @ Wasdale Screes surveyed 108m.
Hard Not Pass [sic]
August 18th - summer log -
2014s-66;
2014s-67 -
Further surveying: "Pity the Fool"
August 19th - summer log -
2014s-67 -
Hard Not Pass. Survey up to BMCH entrance bolt
Whole batch 14-01
August 21st - summer log -
2014s-69 -
White havens investigation.
August 22nd - summer log -
2014s-69 -
Investigate Frizzington Extensions discrepancy.
August 24th - summer log -
2014s-70 -
Investigate Frizzington Extensions discrepancy.
August 25th - summer log -
2014s-70 -
Investigate Frizzington Extensions discrepancy.
August 26th - summer log -
2014s-70 -
Investigate Frizzington Extensions discrepancy.
August 27th - summer log -
2014s-71 -
Investigate Frizzington Extensions discrepancy.
+ detackle main entrance.
14_02
November 10th - autumn log -
2014a-02 -
Trips to try to find route through to the end.
November 11th - autumn log -
2014a-02 -
Trips to try to find route through to the end.
November 12th - autumn log -
2014a-02;
2014a-03 -
Leads near Nearly Dan Chamber looked at. Big passage and excellent formations.
14_03 L=242.3 Fanny Bramble Passage
14_04 L=428.1m
December 24th - Xmas - New Year log -
2014c-01 -
Housekeeping trip to Henry's Way.
No 1 Haverflatts Lane is best route.
December 26th - Xmas - New Year log -
2014c-01 -
Under E wall of Nearly Dan Chamber.
Roa Island batch 14_05 L=89.8m + 17498.1
=17587.9
December 27th - Xmas - New Year log -
2014c-01 -
Side passage @ start of Help Me Lloyd.
215m surveyed Batch 14_06
"Let it Snow"
L=215 + 17587.9 = 17802.9
December 29th - Xmas - New Year log -
2014c-01 -
(1) 100m upstream of La Gatuna inlet: 61m W-heading extension "Meathop Passage"
Batch 14_07 L=61+5+17802.9 TL = 17864.4
(2) "Grange-over-Sands" @ S end of Henry's Way
Batch 14_08 L=140.2 + 17864.4 = 18004.6m
December 30th - Xmas - New Year log -
2014c-01 -
(1) "Rooze Chamber" Batch 14_09 L=80
TL=18085.4
(2) Oxbow in Frizzington Batch 14_10 L=29.2
TL=18114.6m
December 31st - Xmas - New Year log -
2014c-02 -
Oxbow on High Street Batch 14_11
L=69.3 TL=18183.9
2015
January 1st - Xmas - New Year log -
2014c-02 -
Resurvey of S heading passage
Total surveyed = 338m of which
"Should Have Gone to Surveying School" is 115.2
TL=18299.1m
(Xmas surveying: 801m 'new passage' + 223m resurvey)
April 1st - Easter log -
2015e-07;
2015e-22;
2015e-41 -
(1) Leads on the "Should Have Gone to Surveying School" Most small.
128.8m surveyed (batch 15_02) TL=18425.9m
(2) Shaft in Deep Rifts Passage dropped. p30 Batch 15_01 L=64.6
TL=18490.5m
(2 accounts)
April 3rd - Easter log -
2015e-13;
2015e-14;
2015e-16;
2015e-41 -
Pushing at end of Deep Rifts Passage. Opened up to a rift / aven Batch 15_03
L=29.7 TL=18520.2
(2 log book accounts)
April 4th - Easter log -
2015e-35 -
Climb up into 3m shown @ Red Pike. Long term dig.
April 5th - Easter log -
2015e-24 -
Passage heading SW from Nearly Dan Chamber. No significant finds. Photos here and in SHGTSS.
April 7th - Easter log -
2015e-28 -
Aquaintance trip to SHGTSSavers area.
April 9th - Easter log -
2015e-31 -
Dropped p7m at R of end choke in SHGTSS area. Found p not on survey 20m back from choke on NE side. Not dropped.
May go to passage under?
No passage under.
April 11th - Easter log -
2015e-31;
2015e-32 -
Check end of cave S of Henry's Chamber. End choke looked at. No way on.
At 5 ways Chamber - 3 side passages marked ? all end after a few metres.
April 14th - Easter log -
2015e-33;
2015e-41 -
Entrance is slumping.
Survey + resurvey around Frizzington.
Batch 15_05 81m new
15_06 206m new
TL=18807m
April 15th - Easter log -
2015e-34;
2015e-41 -
Batch 15_04 "Doldy's Draughting Passage. Still going. Length = 5mm
TL=18862m
July 30th - summer log -
2015s-13;
2015s-14 -
4117 Ciervo drops down pitch into Vaca p35.
Total length = 19388 (491+35+18862)
August 2nd - summer log -
2015s-21;
2015s-25 -
Tourist trip top level.
August 5th - summer log -
2015s-26;
2015s-27;
2015s-28 -
Pushed at end of Deep Rifts Passage
Batch 15_08 goes to surface: Cuba Libre entrance (4182) L=24.5
Batch 15_07 = 39.5 End of Deep Rifts.
TL=19388 + 64 = 19452m
August 6th - summer log -
2015s-36 -
Push around Cuba Libre / Deep Rifts.
Batch 15_09 L=12m
TL=19464m
August 13th - summer log -
2015s-47;
2015s-48 -
Push Doldy's Draughting Rift. Bolting traverses + ~100m passages ends @ edge of large shaft. Heading towards site 3300.
Batch 15_10 length = 100.7m
TL=19565m
October 14th - autumn log -
2015a-04 -
Surveyed down from 4117.
TL now = 19571m
November 11th - autumn log -
2015a-09 -
Extended Suit Wrecker Inlet up RH passage off.
Named 'Bernard'. Batch 15_11 L=214m
TL=19785m
November 13th - autumn log -
2015a-10;
2015a-11 -
Pushed on a t end of Suitwrecker Inlet. Ends in choke. 15hr trip.
Batch 15_12 L=591m
TL=20376m
Also see log book skecth for more detail of passages at Suitwrecker 4, 5, 6.
2016
March 16th - Easter log -
2016e-05 -
(1) Clear out mud slump in BMCH entrance.
(2) Doldy's D. R: Lower level @ end is blind. Opening above bolt climbed ~4m.
Continued L to breakdown and R is a hole in rift - worth investigating.
March 17th - Easter log -
2016e-07 -
Traverse line put in on route to Pont Aven. DistoC2 not working.
All leads checked out on red level to east of Scafell Aven. Bolt climb here needs doing.
March 19th - Easter log -
2016e-08 -
Surveyed Maze of Tight Cross Rifts.
Batch 16_01 (added to total later)
March 20th - Easter log -
2016e-09 -
Ascended bolt climb up to NE of Scafell Aven. At top (c5?) 6 - 7m of passage goes to muddy traverse to where it closes in.
May be chamber above?
Batch 16_02 L=24m
TL=20400m
March 21st - Easter log -
2016e-10 -
Continued surveying rifts S of Botchergate. Ended in water (swimming)
March 24th - Easter log -
2016e-16;
2016e-17 -
More passage surveyed off F. @ Botchergate. dseep water upstream. Sumped after 130m
Batche 16_01 = 1018.4m; 16_03 = 103.6m
TL=20400 + 1122 = 21522m
March 28th - Easter log -
2016e-25
March 31st - Easter log -
2016e-35 -
Passages pushed around "Buzzin gets Closer"
Surveyed batches 16_04 + 16_05 L=71m
TL=21522 + 71 = 21593m
June 11th - summer log -
2016s-01
July 24th - summer log -
2016s-15;
2016s-60 -
Various surveys:
16_07 38.85m;
16_08 31.79m;
16_09 159.29m;
16_10 91.35m
July 25th - summer log -
2016s-09 -
Pushed end of Frizzington Extensions.
Flat out enters chamber after dig.
Slide down into well decorated passage then step over 4m deep pot.
Sandy crawl to a 6m rift, climb down then an undescended p10. Not surveyed.
July 27th - summer log -
2016s-17;
2016s-17;
2016s-18;
2016s-19;
2016s-60 -
(1) Note about goat knocking rock topwards hole. Keep cover over hole at all times.
(2) Surveying green level (see next trip) around Whitehavens area 16_11
July 28th - summer log -
2016s-21;
2016s-60 -
ditto Batch 16_11 =593.09 in total
Down to Tuna Can Corner.
July 30th - summer log -
2016s-23;
2016s-24;
2016s-60 -
Batch 16_12 around Tuna Can Corner and Mancunian Candidate.
Then 16_13 Boulder choke area survey.
16_12 = 295m; 16_13 =107.2m
*See later*
August 1st - summer log -
2016s-26;
2016s-60 -
Extending 1st Terminal Choke + Shoulder of Mutton areas.
16_12 + 16_13 extended.
August 3rd - summer log -
2016s-29
August 4th - summer log -
2016s-33;
2016s-34;
2016s-60 -
Explored and surveyed past 1st Terminal Choke + around Rib Tickler. Shoulder of Mutton 12 hr trip.
Total length surveyed 16S (summer 2016) = 1967.4m?
August 6th - summer log -
2016s-50;
2016s-60 -
Batch 16_15 @ end of Doldy's Rift.
Ends in boulder choke
Also 16_16 in Frizzington Extensions.
16_15 - 51m; 16_16 - 20m
Total corrected new for summer = 1799.5
+ 21636 TL = 23435.5m
August 7th - summer log -
2016s-48 -
Tourist trip via BMCH. Photos.
December 26th - Xmas - New Year log -
2016c-01 -
Via BigMat Calf Hole, checked out base of SF Aven to Penrith HMT Duck. Nothing much found.
December 28th - Xmas - New Year log -
2016c-02 -
Via BigMat to SpecSavers.
Nothing new found.
December 31st - Xmas - New Year log -
2016c-02 -
Via BMCH. Resurveyed Fred Whitton Series to just N of Scafell Aven sorting out the "confused and confusing" area that needs redrawing.
2017
April 10th - Easter log -
2017e-07;
2017e-08 -
Revisiting Mad Arse area.
July 28th - summer log -
2017s-09;
2017s-10;
2017s-11 -
Mad Arse area revisited + water route surveyed. Batch 2889_17_01
L=104m TL=23540m
August 12th - summer log -
2017s-43 -
Banger No 5 pushed for 28.5m
TL=23540+29 = 23569m
August 16th - summer log -
2017s-54 -
Far end of Frizzington 17_02 L=127
TL=23696m
3 x 13m pitches investigated.
2018
February 8th - Jan-Feb log -
2018jf-08;
2018jf-10 -
Entrance has permanent bolt.
Visit to high level chokes + passages @ end of top level. Could be dug in draughty weather. 2 accounts
April 3rd - Easter log -
2018e-60 -
Andy P stuck for about 45 minutes on p14. Released by Jim D using rope and pulleys.
April 10th - Easter log -
2018e-57
April 13th - Easter log -
2018e-72 -
Dig in high level choke. No go.
April 17th - Easter log -
2018e-67 -
Entrance to BMCH in good order.
various extensions after trip to Scafell Aven.
Batch 18_01 L=35.2m
Batch 18_02 L=52.2m
TL = 87.4 + 23696 = 23783m
August 1st - summer log -
2018s-19 -
French visit with PS to view gypsum near to BMCH entrance.
December 25th - Xmas - New Year log -
2018c-02;
2018c-09 -
Tourist trip BigMat to High Street Oxbow
2019
April 18th - Easter log -
2019e-29;
2019e-53 -
Trip to check out possible leads but all had been done. (2 accounts)
April 27th - Easter log -
2019e-51 -
Pitfall traps removed + photos + spot collecting.
August 1st - summer log -
2019s-14 -
(1) Dropped p20 @ end of "Help Me Lloyd" traverse. Blind.
(2) Photos Kendal Mint Cake
August 17th - summer log -
2019s-45 -
Route finding trip for Jim Lister to dive sump (from 3916)
August 18th - summer log -
2019s-50 -
Solo trip transport gear in.
August 19th - summer log -
2019s-50 -
Detail added / changed at Elephant Sump and south in stream from Bassenthwaite.
August 21st - summer log -
2019s-52 -
Kit out. Solo trip.
2021
July 24th - summer log -
2021s-07 -
Surveyed between Satterthwaite Tarn Chamber and Cockup.
131m new surveyed. 2889_21_01
TL=23783+131 = 23914m
2022
April 6th - Easter log -
2022e-02 -
Water level high @ Scafell Aven area.
Small find at Tuna Can Corner. Sketch in log book.
2023
November 9th - autumn log -
2023a-21 -
Familiarisation trip form BMCH to start of Suit Wrecker.
Join Cuba Libre to Vaca on survey.
2025
February 10th - Xmas- New Year log -
2024c-31