MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#0258 Calleja Rebollo, Torcón de la
Toad in the Hole
Seldesuto - 30T 0448780 4795064 Altitude: 293m - Length: 8369m Depth: 118m
Website description for site 0258   |   Site in context, area map

Extra notes from card index
• L81: Description of cave in back - Pete
• After 1988 TL=4.016km "PL"=3800 depth =50m
• L89: and later? detackle
• L07E : No log book accounts. Batches surveyed @ end of cave as follows: 4 hours later 8/4/07 60.79 Bad day 10/4/07 100.58m Move It 11/4/07 283.2 * Old Stuff 12/4/07 54.25 PMT 12/4/07 206.61* Practice 14/4/07 42.92 Man-Down 14/4/07 106.17 * =855m TL=7386 d=95m * Are heading N in occasional streamway. Mud @ lower levels.
• 5/11/23 Survey 'complete' 0258-2023s-02.pdf

Orphan card index date references to logbook pages
• [14/08/1981] To dig - into small chamber. ENd of obvious pushing.
• [30/07/1987] (i) to CS continue dig - photos taken (ii) Cheese Shop series explored.
• [05/08/1989] Surface survey tying in Humo (45) and Seldesuto (370)
• [01/08/1996] Bits surveyed 36.5+12.3 = 49m TL=5427m
• [11/04/1998] Continue exploring same pit
• [10/08/1998] Breakthrough in v. well decorated Correspondents' Capers 46.5m surveyed. Tl=6149+45.6 = 6195m
• [16/12/2019] Photos from Carlos Lamoile
• [12/10/2026] Bolts and pulleys remove 2 boulders. Scaff bar would be a good idea to stop rocks rolling in again. 2 ladders recommended on slippery entrance slope.

Dated logbook entries with card index notes

1966

July 8th - summer log - 1966s-03

1981

July 26th - summer log - 1981s-12 - Initial poke.
July 30th - summer log - 1981s-22 - digging
July 31st - summer log - 1981s-25 - Entry by Pat
January 1st - summer log - 1981s-96; 1981s-97; 1981s-A2
August 1st - summer log - 1981s-28 - Entry by others . Exploration to climb. Photos. survey
August 3rd - summer log - 1981s-37 - Scaled up and explored.
August 5th - summer log - 1981s-43; 1981s-44; 1981s-45 - Huge chamber found SKETCH
August 6th - summer log - 1981s-46; 1981s-47 - Exploration SKETCH
August 8th - summer log - 1981s-46
August 13th - summer log - 1981s-66; 1981s-67; 1981s-68 - Surveying & photos. SKETCH explore. Digging in chasmber.

1982

August 10th - summer log - 1982s-34

1985

July 18th - summer log - 1985s-01

1987

July 28th - summer log - 1987s-18 - Chocolate Slice dig started
July 29th - summer log - 1987s-18; 1987s-18; 1987s-19; 1987s-19 - (i) continued (ii) Also found extension near entrance drop.
July 31st - summer log - 1987s-19
August 1st - summer log - 1987s-19; 1987s-19; 1987s-20; 1987s-20; 1987s-75; 1987s-75 - Abortive trip to Cheese Shop
August 2nd - summer log - 1987s-22 - CSS traverse to end to choke. Continues at shaft base in small series.
August 3rd - summer log - 1987s-25; 1987s-75 - Surveyed Cheese Shop.Finished at ?
August 4th - summer log - 1987s-25; 1987s-26; 1987s-75 - Cocoa Series entered + surveyed
August 11th - summer log - 1987s-51 - Pitch descended in CS
August 13th - summer log - 1987s-57; 1987s-58; 1987s-59; 1987s-75 - Pitch dropping - area not surveyed.
August 16th - summer log - 1987s-64; 1987s-65; 1987s-68; 1987s-76 - See later as well - Jim's bit. Surveying and pushing about 500m new stuff found heading south off Choc.
August 17th - summer log - 1987s-67 - Re-surveyed and surveyed some new. New bolt needed on 1st climb up.
August 18th - summer log - 1987s-72 - Survey and explore.

1988

July 30th - summer log - 1988s-13; 1988s-14 - Look at original choke and dig. New bolt in pitch up head.
July 31st - summer log - 1988s-15; 1988s-19 - Molephoning. Doesn't work. (2 accounts)
January 1st - summer log - 1988s-95; 1988s-97; 1988s-A6
August 2nd - summer log - 1988s-21 - Molephoning - good reception at 50m depth; poor reception at 85m depth
August 5th - summer log - 1988s-40; 1988s-46; 1988s-47; 1988s-48 - Molephoning. Surface location of SE Passage end. See log book for location. About 40m found. Also large 150 x 20m chamber / passage.
August 8th - summer log - 1988s-58; 1988s-58 - tourist trip to start of 87 extensions.
August 9th - summer log - 1988s-59; 1988s-62 - Two teams pushing on. Large chamber found.
August 11th - summer log - 1988s-70; 1988s-72; 1988s-89 - (i) Pushing near end of western arm into Two Owls Series (avvount also after 14/8/88) (ii) Other team find nothing.
August 14th - summer log - 1988s-84; 1988s-88; 1988s-89; 1988s-90; 1988s-91 - Pushing trip at end. Ends near Las Calzadillas (2 accounts)
August 17th - summer log - 1988s-96; 1988s-97 - Pushing at end. Cloud Nine. Streamway heard in 2 places (2 accounts)
August 20th - summer log - 1988s-A2 - Resurvey some parts
August 22nd - summer log - 1988s-A5

1989

January 1st - summer log - 1989s-00
August 7th - summer log - 1989s-73 - Rigging up pitches
August 8th - summer log - 1989s-75; 1989s-75; 1989s-76; 1989s-76; 1989s-79; 1989s-79; 1989s-81; 1989s-81; 1989s-84; 1989s-84 - Climb aven in S passage. Mud/boulder choke. Smoke test of crawl from molephone point. Seen emerging from both holes in main valley (685)
August 10th - summer log - 1989s-85; 1989s-86; 1989s-86 - (1) Traverse near entrance done. Re-explored large chamber. Good photo trip needed. (2) Photo trip from Lost Sereis out. (3) Pushing bits beyond 4th pitch TL=4546m
August 11th - summer log - 1989s-88
August 12th - summer log - 1989s-91; 1989s-92

1991

August 8th - summer log - 1991s-40 - Pitch descended in Misty Series. Sketch.

1993

August 1st - summer log - 1993s-21; 1993s-22 - Misty Series draughting dig. Also 42m surveyed. TL = 4999m
August 2nd - summer log - 1993s-26 - Dug through to tight upwards bits
August 14th - summer log - 1993s-66 - Derigged. TL=4999m

1995

April 14th - Easter log - 1995e-06; 1995e-07; 1995e-18 - Widening squeezes
June 1st - Whit log - 1995w-09 - Looking at Baz's Choke dig.
July 30th - summer log - 1995s-21 - Rigged to Misty Series. Various pushes. No surveying.
August 6th - summer log - 1995s-57 - Digging Chocolate Slice
August 15th - summer log - 1995s-91 - Detackled. Baz's dig looks good.

1996

April 3rd - Easter log - 1996e-03; 1996e-04 - Photos in early passages. Digging in Baz's Dig. Looks hopeless?
April 6th - Easter log - 1996e-08 - Photos and surveying bits 81.2m TL=5080m
April 7th - Easter log - 1996e-15 - In Cocoa Series. Surveyed just before JSD23 to draughting squeeze. Various bolts. 16m TL = 5096
July 26th - summer log - 1996s-02 - ST Anns Passage 203m surveyed TL=5299m
July 29th - summer log - 1996s-04 - Extended St Anns Passage 79m TL=5378m
July 31st - summer log - 1996s-05
August 5th - summer log - 1996s-16 - In St Ann's Series. Various small and muddy extensions surveyed. 9.5+15.8+21.3+29.3=76+5427 = 5503m

1997

July 25th - summer log - 1997s-03 - Tackled up
August 5th - summer log - 1997s-30 - tourist trip(?)
August 6th - summer log - 1997s-29; 1997s-30 - Bits around Saville Row 45m TL=45+5503=5548m
August 8th - summer log - 1997s-52 - p18m descended; hideous. TL=5566m Elsan-soaked T shirt left at end of S passage for draught to surface (Not smelt the following day.)
August 9th - summer log - 1997s-38
August 11th - summer log - 1997s-46 - Derigged.
August 12th - summer log - 1997s-53

1998

April 8th - Easter log - 1998e-08; 1998e-09 - Traverse over to mud choke. Near Misty Series pitch
April 9th - Easter log - 1998e-10 - Further exploration beyond Baz's Choke. Surveyed 206.2m TL=5566+206 = 5772m
April 10th - Easter log - 1998e-18; 1998e-19 - Explored Chamber 2 p and started deep pit exploration beyond
April 13th - Easter log - 1998e-23; 1998e-26 - Continued traverse 8/4/98. Surveyed stn 940-943 Length =5772+47.3=5813m Chamber @ 200,300 found length 72m
April 14th - Easter log - 1998e-28 - Baz's wet shaft explored to narrow p12m and narrow upstream unexplred rift full of choss. T Length = 5980m d=-67m
July 25th - summer log - 1998s-02 - Further exploration up boulder choke in Baz's Choke extension.
July 29th - summer log - 1998s-04 - Hole at Easter extension end - no way on. Choke draughts out but splits up and remains elusive. Dig at top of Baz's Chamber - draughting low crawl, sandy floor - partly calcited. Needs tools.
August 3rd - summer log - 1998s-08 - Push in Patrick's Silly Passage
August 5th - summer log - 1998s-09 - Push in Patrick's Silly Passage. Extensions: Peardrop Passage 129.8. Pedro's Pot 39.2m down to -62m TL=5980+169 = 6149m
August 9th - summer log - 1998s-23 - Pushing upstream at base of Baz's Wet Pitch. 5m gained. Tight and awkward but draughts.

1999

July 28th - summer log - 1999s-09 - Tackled up partly. Baz's Chamber p dropped.
July 29th - summer log - 1999s-10 - Exploration at 1st Return. (1) 2nmd Coming is continuation over a "bold step". High rifts. Draught lost. TL=95m (2) Grade 1 chamber surveyed TL=150m Fossil Chamber. TL=6440m Contains 2 x 100m+ avens. (3) Pitch before rope traverse tackled up.
August 10th - summer log - 1999s-32 - Pitches descended in Two Owls Passages.Surveyed 29.9m TL=6470m d=67m

2002

July 31st - summer log - 2002s-08 - 3rd and 4th pitches bolted for SRT.
August 1st - summer log - 2002s-08 - 6th pitch needs rerigging. Looked at first drop in last extension in 1st Return - needs long rope. Surveyed to pit@-357,-104 L=16m TL=6486m d=67.
August 8th - summer log - 2002s-19; 2002s-20 - (1) Survey links 23.9 + 21.1 (2) Pitch at 1st Return descended 40m to mud choke. (Unsurveyed) TL=6486+45 = 6531m
August 16th - summer log - 2002s-29

2007

January 1st - Easter log - 2007e-38
April 6th - Easter log - 2007e-37 - (Back of log) GPS entrance 0448882 4795273 Altitude 300m
January 1st - summer log - 2007s-63

2008

March 17th - Easter log - 2008e-40 - Tackle up
March 18th - Easter log - 2008e-40 - Tackle up
March 19th - Easter log - 2008e-40; 2008e-41 - Trip to far end of Move It extensions. Batch Not Impressed Batch Back Again
March 21st - Easter log - 2008e-41 - Through boulder choke in 'Man Down' to p25m down to muddy passage. Batch Chasing the Dragon
March 23rd - Easter log - 2008e-42 - Upstream end of Move It extended. Batch How Bad Is It
March 25th - Easter log - 2008e-42; 2008e-43 - Girly Day Out surveyed Total new length 516m (+7386) TL=7902m d=118m
March 26th - Easter log - 2008e-45 - Photo trip innear series.

2012

February 9th - Jan-Feb log - 2012jf-04
April 3rd - Easter log - 2012e-14 - Tackled up to Girlies Day Out
April 4th - Easter log - 2012e-14; 2012e-15; 2012e-16 - Explored aven at GDO. Site 3638 found above Toad on same day (2 accounts)
April 7th - Easter log - 2012e-27; 2012e-27; 2012e-36 - Two trips Girlies Day Out area.Down pitches. Detackled on the way out.

2017

April 18th - Easter log - 2017e-30 - Blocked entrance unblocked
May 6th - Easter log - 2017e-51

2023

July 21st - summer log - 2023s-08 - Calibrate DistoX's
July 22nd - summer log - 2023s-08 - Pushed and survey dashed passage on survey. Fixed rope and bolts do not look good.
July 26th - summer log - 2023s-12 - Attemp to get to ST Ann's but climbs over drops need protection.
July 29th - summer log - 2023s-13 - In Big Chamber near entrance located phreatic maze. Some surveying done. Will return.
July 31st - summer log - 2023s-22; 2023s-23 - Surveying in maze area off Big Chamber Batch 23-01 L=270m TL=8208 d=118m
August 1st - summer log - 2023s-22 - Hand line over traverse into St Ann's Batch 23-02 L=36m

2024

April 6th - Easter log - 2024e-38 - Looking at sites above Toad and #3638 and #5419, #2930 (main sink).

2025

February 10th - Xmas- New Year log - 2024c-31
April 19th - Easter log - 2025e-34; 2025e-35; 2025e-42; 2025e-43 - (1) Familiarisation - missing a possible big passage off Girlies Day Out. (2) Photos not worthwhile in Saville Row. Heavily corroded anchors en route.
April 22nd - Easter log - 2025e-54; 2025e-55 - (1) Some bolts replaced. (2) GDO extension. L=161m 0256-25-01 TL = 8208 + 161 = 8369m

2026

July 22nd - summer log - 2026s-02 - ESOCAN safety alert (24/9/25), entrance blocked by a large boulder.
August 6th - summer log - 2026s-47 - Found blocked.
August 9th - summer log - 2026s-32 - 1 rock removed - another is still blocking the hole.

Published documents: print and digital

• [P3] Corrin J et al, 1981a Matienzo Expedition 1981 J. Manchester University Speleological Society No. 10
• p(v) - photo
• p(vi) - description• p(vi) - survey
• [R] Corrin J, 1981 Matienzo 1981 Caves & Caving 14, Nov. 1981
• p17
• [W2] Smith P, 1982b La Expedicion Inglesa a Matienzo 1981 Boletin Cantabro de Espeleologia 2, April 1982
Summary
• [G] Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions
• p11
• p19 - account PL=459 + vert range =35
• [BB] Corrin J and Knights S, 1988 Matienzo 1987 Caves & Caving 41, Autumn 1988
1987 Summary + photos + survey
• [DB] Cawthorne Bob et al, 1988 Matienzo '88 Plymouth Caving Group Newsletter and Journal, No. 104, Dec. '88
• p18 - Exploration account
• p19 - Molephone
• [BC] Davis J and Corrin J, 1989 Matienzo 1988 Caves & Caving 44, Summer 1989
Summary of extensions. 2km surveyed. Postulation about speleogenesis. Possible links hydrologically with Mostajo, Aguanaz etc
• [DC] Neill A et al, 1989 Matienzo 1989 Plymouth Caving Group Newsletter and Journal, No. 107, Dec. '89
• p10 - Smoke test?
• pp10,11 - 1989 explorations• p11,12 - Dodo Grotto explored; detackled.
• [BJ] Corrin J, 1990 Matienzo '89 Caves & Caving 49, Autumn 1990
Cave comes back on itself. Summary. Smoke tests. Cover photo is Toad.
• [CK] Cawthorne B and Neill A, 1990 Matienzo '88 Newsletter No. 58. April 1990. W Pengelly Cave Studies Trust
• p13
• [DD] Neill Ali, 1991 Matienzo '91 Plymouth Caving Group Newsletter and Journal, No. 112, Autumn 91
• p13
• [BO] Corrin J, 1992a Matienzo '91 Caves & Caving 55, Spring 1992
summary
• [BP] Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - Area map
• p350 - Black line survey
• [DE] Neill Alasdair and Jackson Keith, 1993 Matienzo '93 Plymouth Caving Group Newsletter and Journal, No. 119, Winter 93- 94
• p7
• [BZ] Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
Summary. Length on p27
• [CS] Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
• p68 - Possible link with Colmenas-Escalón? On '94 area map.
• [CU] Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p26 - Mention
• [DM] Corrin Juan, 1997a Matienzo Caves & Caving, Issue 75, Spring '97
• p18 - Summary of finds
• [DR] Corrin Juan, 1997b Expedición Británica a Matienzo 1996 Boletín Cántabro de Espeleogía no 13. Santander.
• p82 - Summary of finds
• [DS] García José León, 1997 Cantabria Subterránea. Catálogo de las Grandes Cavidades
• p431 - summary & exploration history to 1996
• p434 - photo
• [DV] Corrin Juan, 1997c El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p713 - Future hopes
• [DN] Corrin Juan, 1998 Matienzo 1997 Caves & Caving, Issue 79, Spring '98
1997 summary
• [DW] Corrin Juan, 1999 Matienzo Caves & Caving 83, Spring '99
98 summary
• [DY] Corrin Juan, 2000 Matienzo '99 Caves & Caving 87, Spring/Summer 2000
summary
• [EF] Corrin Juan, 2001a The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p13 - Mentioned in summary article
• [EQ] Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p15 - summary & exploration history
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p31, 32, 38 - In summary article in Spanish
• [FF] Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p20 - Summary of 07 finds.
• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p19, 22
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• pp495-496 - History, description, line survey, photos
• [GF] Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p10 - summary
• p11 - photo.
• [GH] Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• p43 - On postulated hydrology map