Extra notes from card index
• L81: Description of cave in back - Pete
• After 1988 TL=4.016km "PL"=3800 depth =50m
• L89: and later? detackle
• L07E : No log book accounts. Batches surveyed @ end of cave as follows: 4 hours later 8/4/07 60.79
Bad day 10/4/07 100.58m
Move It 11/4/07 283.2 *
Old Stuff 12/4/07 54.25
PMT 12/4/07 206.61*
Practice 14/4/07 42.92
Man-Down 14/4/07 106.17 * =855m
TL=7386 d=95m
* Are heading N in occasional streamway. Mud @ lower levels.
• 5/11/23 Survey 'complete' 0258-2023s-02.pdf
Orphan card index date references to logbook pages
• [14/08/1981] To dig - into small chamber. ENd of obvious pushing.
• [30/07/1987] (i) to CS continue dig - photos taken
(ii) Cheese Shop series explored.
• [05/08/1989] Surface survey tying in Humo (45) and Seldesuto (370)
• [01/08/1996] Bits surveyed 36.5+12.3 = 49m TL=5427m
• [11/04/1998] Continue exploring same pit
• [10/08/1998] Breakthrough in v. well decorated Correspondents' Capers 46.5m surveyed.
Tl=6149+45.6 = 6195m
• [16/12/2019] Photos from Carlos Lamoile
• [12/10/2026] Bolts and pulleys remove 2 boulders. Scaff bar would be a good idea to stop rocks rolling in again.
2 ladders recommended on slippery entrance slope.
Dated logbook entries with card index notes
1966
July 8th - summer log -
1966s-03
1981
July 26th - summer log -
1981s-12 -
Initial poke.
July 30th - summer log -
1981s-22 -
digging
July 31st - summer log -
1981s-25 -
Entry by Pat
January 1st - summer log -
1981s-96;
1981s-97;
1981s-A2
August 1st - summer log -
1981s-28 -
Entry by others . Exploration to climb. Photos. survey
August 3rd - summer log -
1981s-37 -
Scaled up and explored.
August 5th - summer log -
1981s-43;
1981s-44;
1981s-45 -
Huge chamber found SKETCH
August 6th - summer log -
1981s-46;
1981s-47 -
Exploration SKETCH
August 8th - summer log -
1981s-46
August 13th - summer log -
1981s-66;
1981s-67;
1981s-68 -
Surveying & photos. SKETCH explore. Digging in chasmber.
1982
August 10th - summer log -
1982s-34
1985
July 18th - summer log -
1985s-01
1987
July 28th - summer log -
1987s-18 -
Chocolate Slice dig started
July 29th - summer log -
1987s-18;
1987s-18;
1987s-19;
1987s-19 -
(i) continued
(ii) Also found extension near entrance drop.
July 31st - summer log -
1987s-19
August 1st - summer log -
1987s-19;
1987s-19;
1987s-20;
1987s-20;
1987s-75;
1987s-75 -
Abortive trip to Cheese Shop
August 2nd - summer log -
1987s-22 -
CSS traverse to end to choke. Continues at shaft base in small series.
August 3rd - summer log -
1987s-25;
1987s-75 -
Surveyed Cheese Shop.Finished at ?
August 4th - summer log -
1987s-25;
1987s-26;
1987s-75 -
Cocoa Series entered + surveyed
August 11th - summer log -
1987s-51 -
Pitch descended in CS
August 13th - summer log -
1987s-57;
1987s-58;
1987s-59;
1987s-75 -
Pitch dropping - area not surveyed.
August 16th - summer log -
1987s-64;
1987s-65;
1987s-68;
1987s-76 -
See later as well - Jim's bit.
Surveying and pushing about 500m new stuff found heading south off Choc.
August 17th - summer log -
1987s-67 -
Re-surveyed and surveyed some new.
New bolt needed on 1st climb up.
August 18th - summer log -
1987s-72 -
Survey and explore.
1988
July 30th - summer log -
1988s-13;
1988s-14 -
Look at original choke and dig. New bolt in pitch up head.
July 31st - summer log -
1988s-15;
1988s-19 -
Molephoning. Doesn't work. (2 accounts)
January 1st - summer log -
1988s-95;
1988s-97;
1988s-A6
August 2nd - summer log -
1988s-21 -
Molephoning - good reception at 50m depth; poor reception at 85m depth
August 5th - summer log -
1988s-40;
1988s-46;
1988s-47;
1988s-48 -
Molephoning. Surface location of SE Passage end. See log book for location. About 40m found. Also large 150 x 20m chamber / passage.
August 8th - summer log -
1988s-58;
1988s-58 -
tourist trip to start of 87 extensions.
August 9th - summer log -
1988s-59;
1988s-62 -
Two teams pushing on. Large chamber found.
August 11th - summer log -
1988s-70;
1988s-72;
1988s-89 -
(i) Pushing near end of western arm into Two Owls Series (avvount also after 14/8/88)
(ii) Other team find nothing.
August 14th - summer log -
1988s-84;
1988s-88;
1988s-89;
1988s-90;
1988s-91 -
Pushing trip at end. Ends near Las Calzadillas (2 accounts)
August 17th - summer log -
1988s-96;
1988s-97 -
Pushing at end. Cloud Nine. Streamway heard in 2 places (2 accounts)
August 20th - summer log -
1988s-A2 -
Resurvey some parts
August 22nd - summer log -
1988s-A5
1989
January 1st - summer log -
1989s-00
August 7th - summer log -
1989s-73 -
Rigging up pitches
August 8th - summer log -
1989s-75;
1989s-75;
1989s-76;
1989s-76;
1989s-79;
1989s-79;
1989s-81;
1989s-81;
1989s-84;
1989s-84 -
Climb aven in S passage. Mud/boulder choke. Smoke test of crawl from molephone point. Seen emerging from both holes in main valley (685)
August 10th - summer log -
1989s-85;
1989s-86;
1989s-86 -
(1) Traverse near entrance done. Re-explored large chamber. Good photo trip needed.
(2) Photo trip from Lost Sereis out.
(3) Pushing bits beyond 4th pitch TL=4546m
August 11th - summer log -
1989s-88
August 12th - summer log -
1989s-91;
1989s-92
1991
August 8th - summer log -
1991s-40 -
Pitch descended in Misty Series. Sketch.
1993
August 1st - summer log -
1993s-21;
1993s-22 -
Misty Series draughting dig. Also 42m surveyed.
TL = 4999m
August 2nd - summer log -
1993s-26 -
Dug through to tight upwards bits
August 14th - summer log -
1993s-66 -
Derigged. TL=4999m
1995
April 14th - Easter log -
1995e-06;
1995e-07;
1995e-18 -
Widening squeezes
June 1st - Whit log -
1995w-09 -
Looking at Baz's Choke dig.
July 30th - summer log -
1995s-21 -
Rigged to Misty Series. Various pushes. No surveying.
August 6th - summer log -
1995s-57 -
Digging Chocolate Slice
August 15th - summer log -
1995s-91 -
Detackled. Baz's dig looks good.
1996
April 3rd - Easter log -
1996e-03;
1996e-04 -
Photos in early passages. Digging in Baz's Dig. Looks hopeless?
April 6th - Easter log -
1996e-08 -
Photos and surveying bits 81.2m TL=5080m
April 7th - Easter log -
1996e-15 -
In Cocoa Series. Surveyed just before JSD23 to draughting squeeze. Various bolts. 16m
TL = 5096
July 26th - summer log -
1996s-02 -
ST Anns Passage 203m surveyed TL=5299m
July 29th - summer log -
1996s-04 -
Extended St Anns Passage 79m TL=5378m
July 31st - summer log -
1996s-05
August 5th - summer log -
1996s-16 -
In St Ann's Series. Various small and muddy extensions surveyed.
9.5+15.8+21.3+29.3=76+5427 = 5503m
1997
July 25th - summer log -
1997s-03 -
Tackled up
August 5th - summer log -
1997s-30 -
tourist trip(?)
August 6th - summer log -
1997s-29;
1997s-30 -
Bits around Saville Row 45m TL=45+5503=5548m
August 8th - summer log -
1997s-52 -
p18m descended; hideous. TL=5566m
Elsan-soaked T shirt left at end of S passage for draught to surface (Not smelt the following day.)
August 9th - summer log -
1997s-38
August 11th - summer log -
1997s-46 -
Derigged.
August 12th - summer log -
1997s-53
1998
April 8th - Easter log -
1998e-08;
1998e-09 -
Traverse over to mud choke. Near Misty Series pitch
April 9th - Easter log -
1998e-10 -
Further exploration beyond Baz's Choke. Surveyed 206.2m
TL=5566+206 = 5772m
April 10th - Easter log -
1998e-18;
1998e-19 -
Explored Chamber 2 p and started deep pit exploration beyond
April 13th - Easter log -
1998e-23;
1998e-26 -
Continued traverse 8/4/98. Surveyed stn 940-943 Length =5772+47.3=5813m
Chamber @ 200,300 found length 72m
April 14th - Easter log -
1998e-28 -
Baz's wet shaft explored to narrow p12m and narrow upstream unexplred rift full of choss.
T Length = 5980m d=-67m
July 25th - summer log -
1998s-02 -
Further exploration up boulder choke in Baz's Choke extension.
July 29th - summer log -
1998s-04 -
Hole at Easter extension end - no way on. Choke draughts out but splits up and remains elusive. Dig at top of Baz's Chamber - draughting low crawl, sandy floor - partly calcited. Needs tools.
August 3rd - summer log -
1998s-08 -
Push in Patrick's Silly Passage
August 5th - summer log -
1998s-09 -
Push in Patrick's Silly Passage. Extensions: Peardrop Passage 129.8. Pedro's Pot 39.2m down to -62m
TL=5980+169 = 6149m
August 9th - summer log -
1998s-23 -
Pushing upstream at base of Baz's Wet Pitch. 5m gained. Tight and awkward but draughts.
1999
July 28th - summer log -
1999s-09 -
Tackled up partly. Baz's Chamber p dropped.
July 29th - summer log -
1999s-10 -
Exploration at 1st Return. (1) 2nmd Coming is continuation over a "bold step". High rifts. Draught lost. TL=95m
(2) Grade 1 chamber surveyed TL=150m Fossil Chamber.
TL=6440m Contains 2 x 100m+ avens.
(3) Pitch before rope traverse tackled up.
August 10th - summer log -
1999s-32 -
Pitches descended in Two Owls Passages.Surveyed 29.9m
TL=6470m d=67m
2002
July 31st - summer log -
2002s-08 -
3rd and 4th pitches bolted for SRT.
August 1st - summer log -
2002s-08 -
6th pitch needs rerigging. Looked at first drop in last extension in 1st Return - needs long rope.
Surveyed to pit@-357,-104 L=16m
TL=6486m d=67.
August 8th - summer log -
2002s-19;
2002s-20 -
(1) Survey links 23.9 + 21.1
(2) Pitch at 1st Return descended 40m to mud choke. (Unsurveyed)
TL=6486+45 = 6531m
August 16th - summer log -
2002s-29
2007
January 1st - Easter log -
2007e-38
April 6th - Easter log -
2007e-37 -
(Back of log) GPS entrance 0448882 4795273 Altitude 300m
January 1st - summer log -
2007s-63
2008
March 17th - Easter log -
2008e-40 -
Tackle up
March 18th - Easter log -
2008e-40 -
Tackle up
March 19th - Easter log -
2008e-40;
2008e-41 -
Trip to far end of Move It extensions.
Batch Not Impressed
Batch Back Again
March 21st - Easter log -
2008e-41 -
Through boulder choke in 'Man Down' to p25m down to muddy passage.
Batch Chasing the Dragon
March 23rd - Easter log -
2008e-42 -
Upstream end of Move It extended.
Batch How Bad Is It
March 25th - Easter log -
2008e-42;
2008e-43 -
Girly Day Out surveyed
Total new length 516m (+7386)
TL=7902m d=118m
March 26th - Easter log -
2008e-45 -
Photo trip innear series.
2012
February 9th - Jan-Feb log -
2012jf-04
April 3rd - Easter log -
2012e-14 -
Tackled up to Girlies Day Out
April 4th - Easter log -
2012e-14;
2012e-15;
2012e-16 -
Explored aven at GDO. Site 3638 found above Toad on same day (2 accounts)
April 7th - Easter log -
2012e-27;
2012e-27;
2012e-36 -
Two trips Girlies Day Out area.Down pitches. Detackled on the way out.
2017
April 18th - Easter log -
2017e-30 -
Blocked entrance unblocked
May 6th - Easter log -
2017e-51
2023
July 21st - summer log -
2023s-08 -
Calibrate DistoX's
July 22nd - summer log -
2023s-08 -
Pushed and survey dashed passage on survey. Fixed rope and bolts do not look good.
July 26th - summer log -
2023s-12 -
Attemp to get to ST Ann's but climbs over drops need protection.
July 29th - summer log -
2023s-13 -
In Big Chamber near entrance located phreatic maze. Some surveying done. Will return.
July 31st - summer log -
2023s-22;
2023s-23 -
Surveying in maze area off Big Chamber Batch 23-01 L=270m
TL=8208 d=118m
August 1st - summer log -
2023s-22 -
Hand line over traverse into St Ann's Batch 23-02 L=36m
2024
April 6th - Easter log -
2024e-38 -
Looking at sites above Toad and #3638 and #5419, #2930 (main sink).
2025
February 10th - Xmas- New Year log -
2024c-31
April 19th - Easter log -
2025e-34;
2025e-35;
2025e-42;
2025e-43 -
(1) Familiarisation - missing a possible big passage off Girlies Day Out.
(2) Photos not worthwhile in Saville Row.
Heavily corroded anchors en route.
April 22nd - Easter log -
2025e-54;
2025e-55 -
(1) Some bolts replaced.
(2) GDO extension. L=161m 0256-25-01
TL = 8208 + 161 = 8369m
2026
July 22nd - summer log -
2026s-02 -
ESOCAN safety alert (24/9/25), entrance blocked by a large boulder.
August 6th - summer log -
2026s-47 -
Found blocked.
August 9th - summer log -
2026s-32 -
1 rock removed - another is still blocking the hole.
Published documents: print and digital
• [P3]
Corrin J et al, 1981a Matienzo Expedition 1981 J. Manchester University Speleological Society No. 10
• p(v) - photo
• p(vi) - description• p(vi) - survey
• [W2]
Smith P, 1982b La Expedicion Inglesa a Matienzo 1981 Boletin Cantabro de Espeleologia 2, April 1982
Summary
• [G]
Corrin J, 1983c The 1981 & 1982 Matienzo Expeditions • p11
• p19 - account PL=459 + vert range =35
• [DB]
Cawthorne Bob et al, 1988 Matienzo '88 Plymouth Caving Group Newsletter and Journal, No. 104, Dec. '88
• p18 - Exploration account
• p19 - Molephone
• [BC]
Davis J and Corrin J, 1989 Matienzo 1988 Caves & Caving 44, Summer 1989
Summary of extensions. 2km surveyed. Postulation about speleogenesis. Possible links hydrologically with Mostajo, Aguanaz etc
• [DC]
Neill A et al, 1989 Matienzo 1989 Plymouth Caving Group Newsletter and Journal, No. 107, Dec. '89
• p10 - Smoke test?
• pp10,11 - 1989 explorations• p11,12 - Dodo Grotto explored; detackled.
• [BJ]
Corrin J, 1990 Matienzo '89 Caves & Caving 49, Autumn 1990
Cave comes back on itself. Summary. Smoke tests. Cover photo is Toad.
• [DD]
Neill Ali, 1991 Matienzo '91 Plymouth Caving Group Newsletter and Journal, No. 112, Autumn 91
• p13
• [BP]
Corrin J, 1992b Las Cavidades Principales en los Montes Alrededor de Matienzo (Ruesga, Cantabria) Actas del V Congreso Español de Espeleologia, Camargo Santander 1-4 Noviembre de 1990
• p346 - Area map
• p350 - Black line survey
• [BZ]
Corrin J, 1994a Matienzo '93 Caves & Caving 63, Spring '94
Summary. Length on p27
• [CS]
Corrin J, 1994b Matienzo '94 Caves & Caving 66, Winter '94
• p68 - Possible link with Colmenas-Escalón? On '94 area map.
• [CU]
Corrin Juan, 1995b Exploraciones en Matienzo 1993 Boletín Cántabro de Espeleología no. 11
• p26 - Mention
• [DM]
Corrin Juan, 1997a Matienzo Caves & Caving, Issue 75, Spring '97
• p18 - Summary of finds
• [DR]
Corrin Juan, 1997b Expedición Británica a Matienzo 1996 Boletín Cántabro de Espeleogía no 13. Santander.
• p82 - Summary of finds
• [DS] García José León, 1997
Cantabria Subterránea. Catálogo de las Grandes Cavidades • p431 - summary & exploration history to 1996
• p434 - photo
• [DV] Corrin Juan, 1997c
El desarrollo futuro de la exploración espeleológica en la zona de Matienzo Cantabria Subterránea. Catálogo de las Grandes Cavidades vol 2
• p713 - Future hopes
• [DN]
Corrin Juan, 1998 Matienzo 1997 Caves & Caving, Issue 79, Spring '98
1997 summary
• [EF] Corrin Juan, 2001a
The Matienzo Caves: exploration and documentation The Archaeology of the Matienzo Depression, North Spain. BAR International Series 975
• p13 - Mentioned in summary article
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p15 - summary & exploration history
• [FD]
Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• p31, 32, 38 - In summary article in Spanish
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p20 - Summary of 07 finds.
• [FM]
Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p19, 22
• [GF]
Corrin Juan, 2013a Matienzo 2012 Speleology Issue 19, December 2013 BCRA
• p10 - summary
• p11 - photo.