2006
August 7th - summer log -
2006s-29 -
Explored. Tall opening. Slot in floor needs opening up. L=8m?
2011
July 24th - summer log -
2011s-12
January 1st - autumn log -
2011a-21;
2011a-24
November 11th - autumn log -
2011a-17
November 13th - autumn log -
2011a-19
November 14th - autumn log -
2011a-16;
2011a-19 -
Boulder removed and rift enlarged.
p7 tight enters roomy chamber with excavated strongly draughting rift dropping as a p3. A p19.5 awaits.
November 15th - autumn log -
2011a-16;
2011a-20 -
Enlarged at head. Drop to flat floor. Passage leads to aven accessed by a short p down.
November 17th - autumn log -
2011a-16 -
At base is p20. At base is walk to a large chamber with several ways on.
Plenty of walking passage. 2 streamways.
Also avens noted with open passage.
TL=761m d=89m
November 18th - autumn log -
2011a-16;
2011a-22 -
Surveying trip. Main passages only surveyed.
Main passage ends at low duck.
RH branch followed to a p30
November 22nd - autumn log -
2011a-17
November 30th - autumn log -
2011a-25;
2011a-26 -
Pitch dropped to an 'inviting' sump. (2 entries)
January 1st - Xmas - New Year log -
2011c-02
December 23rd - Xmas - New Year log -
2011c-01;
2011c-05 -
Walk above cave.
2012
March 26th - Easter log -
2012e-04 -
Pushing; exploring; survey; photos.
DistoX >>> batches 12-01, 12-02, 12-03
March 28th - Easter log -
2012e-05;
2012e-06 -
Pushing; exploring; survey; photos.
DistoX >>> batches 12-01, 12-02, 12-03
March 30th - Easter log -
2012e-07;
2012e-08 -
Pushing; exploring; survey; photos.
DistoX >>> batches 12-01, 12-02, 12-03
March 31st - Easter log -
2012e-07 -
Pushing; exploring; survey; photos.
DistoX >>> batches 12-01, 12-02, 12-03
Surveyed 524m TL = 1286m
April 3rd - Easter log -
2012e-17;
2012e-17;
2012e-35;
2012e-35 -
Enlarging head of 2nd pitch.
Exploring around "Breakdown Chamber"
April 5th - Easter log -
2012e-30;
2012e-30;
2012e-36;
2012e-36 -
Aven climbing
(1) to pitch down
(2) Part way up 35m aven
April 7th - Easter log -
2012e-30;
2012e-30;
2012e-31;
2012e-31;
2012e-38;
2012e-38 -
(i) Bolting in aven - mainly closed in.
(ii) Surveying
batch 12-04 49.4m
batch 12-05 73m
batch 12-06 175.5
TL = 1584m
November 6th - autumn log -
2012a-02
2013
March 25th - Easter log -
2013e-39 -
Bolted into higher level passage over sump. Still going.
13-01 L=33
TL=1798m
March 29th - Easter log -
2013e-36 -
New extension. Survey in Therion.
13-02 L=181m
March 31st - Easter log -
2013e-40;
2013e-40 -
New extension. ?
July 26th - summer log -
2013s-12 -
Bolting Snail Aven Batch 13-03 L=18m
TL=1816m
July 28th - summer log -
2013s-13 -
Continue into boulder choke where survey stops. Up waterfall into continuing inlet - not surveyed. L=136m
TL = 1952m
August 5th - summer log -
2013s-46
August 6th - summer log -
2013s-50 -
Rope on top pitch replaced.
Sump inspected.
August 21st - summer log -
2013s-86 -
(1) Possible smoke test into Cubillón from 3752 not possible. Draught in wrong direction.
(2) Bolting at furthest south up mud staircase.
5m progress; equipment failure.
2014
April 15th - Easter log -
2014e-17 -
Dive kit to sump. Snappers opened up tight sections. Tilberthwaite.
April 16th - Easter log -
2014e-21;
2014e-22 -
Dive site - no go. Mud.
Tight rift opposite pitch base pushed for 60m where dive made to -5m.
Sketch in log book.
April 17th - Easter log -
2014e-33 -
Dive gear removed.
April 25th - Easter log -
2014e-48 -
Bat Aven climbed. Ends in small rifts.
TL=1952m (+60m @ dive site not surveyed)
November 13th - autumn log -
2014a-05 -
(i) End of high S. Passage to aven climbed @ Easter (2014?). Rifts are very tight. Some more detail in log.
(ii) Collapse down aven just before last pitch has a strong draught. See site 4094.
November 14th - autumn log -
2014a-08 -
Hole above seen (Site 4094)
November 15th - autumn log -
2014a-06
2015
September 15th - autumn log -
2015a-01 -
Trip to end abandoned at the mud staircase (requires steps cutting).
Evidence of surface debris at breakdown chamber at base of 2nd big pitch.
Boulders have fallen down and silt is in danger of blocking the route through.
September 24th - autumn log -
2015a-02 -
Trip to end to re-assess work required.
November 18th - autumn log -
2015a-12 -
Strong cold draught noticed above entrance.
Traverse to L accesses site ________?
2016
April 2nd - Easter log -
2016e-58 -
End of Upper S Passage. Removed stal in aven to reveal chamber beyond.
Snappered.
April 9th - Easter log -
2016e-54;
2016e-59 -
Drawn survey with names.
SW corner snappers @ hole in possible chamber.
Very wet. "Trapped" ^36m up
October 16th - autumn log -
2016a-02 -
First awkward take off enlarged.
Extra rope rigged on last entrance pitch p8.
Aven just prior to same pitch bolted until no safe way on through boulders (10m). Some debris cleared below aven.
October 20th - autumn log -
2016a-02 -
To "far climb" where large cavern visible through stal gap. Previous snapper had done little, so exercise repeated.
October 26th - autumn log -
2016a-03 -
Further enlarging @ top of first pitch.
(Note: rope frayed.)
2017
April 9th - Easter log -
2017e-17 -
Replaced rope on second pitch and removed rub point.
April 23rd - Easter log -
2017e-48 -
OBA poured into streamway near sump. Detectors placed @ 0713, 0551 and stream below 0767.
May 4th - Easter log -
2017e-50 -
Aguanaz detectors are positive.
May 6th - Easter log -
2017e-50
2019
August 22nd - summer log -
2019s-53 -
Dived at end of First South Passage.
Footprint seen from bolt route above.
Equipment on entrance pitch in poor condition.
August 23rd - summer log -
2019s-57 -
Batch 19-01 surveyed (as five sections)
(L=129m)
Still lots to look at.
August 25th - summer log -
2019s-58 -
Batch 19-01 added to. 400m surveyed.
Length of 19-01 = 529m
TL = 529 + 1952 = 2481m
2021
February 14th - Jan-Feb log -
2021jf-11 -
Stickle Tarn = Tilberthwaite Tarn.
2022
July 31st - summer log -
2022s-69
August 21st - summer log -
2022s-64 -
Tilberthwaite Tarn sump dived. No way on. Water sinks through gravel and mud.
Landowner met.
August 23rd - summer log -
2022s-64;
2022s-65;
2022s-66 -
Dived through Bassenthwaite Water sump. Pitches being numbered.
Café Chamber - pitch 7 vertical is out on survey.
Descended and is short cut.
August 24th - summer log -
2022s-66 -
Downstream in B.W. extension dug and ~60m passage to a pitch.
August 25th - summer log -
2022s-66 -
Roof capped. Upstream sump not a priority after inspection.
August 26th - summer log -
2022s-66 -
Capping.
August 27th - summer log -
2022s-66 -
Crawl opened enough to rig pitch. About 20m? deep slopes to sump pool.
Dived in zero vis. Going deep.
August 28th - summer log -
2022s-69 -
Another trip - end not reached.
L=52.3m (to top ofpitch)
TL=2481 + 52 = 2533m
August 30th - summer log -
2022s-69;
2022s-70 -
More diving. Complicated sump. Poor viz. Down to -16m
2023
April 4th - Easter log -
2023e-07 -
(i) Trench dug to lower water.
(ii) Low gravel crawl sand bagged to prevent filling in.
Rigging on first 5 pitches needs replacing.
April 8th - Easter log -
2023e-36 -
Resurveying project - batches 1, 2, 3
April 9th - Easter log -
2023e-36;
2023e-37 -
with some extension + passage detail 4
April 10th - Easter log -
2023e-37;
2023e-38;
2023e-39 -
Batch 5.
April 13th - Easter log -
2023e-50 -
Replacing ropes, hangers etc
TL = 2533 + 151 = 2684m (2673 in log file)
August 8th - summer log -
2023s-36;
2023s-55 -
Pushing down pitch. Surveyed but not tied into main line yet.
Photos SDs
August 10th - summer log -
2023s-43;
2023s-44;
2023s-45 -
(i) Hilary Steps - a couple of well decorated chambers + squeeze then choked with calcite.
(ii) Attempt to dive duck / sump found earlier. No line belay points.
(iii) Further extensions - not surveyed.
Sketch in log book.
2024
February 6th - Jan-Feb log -
2024jf-05 -
Photo from Sam D
March 26th - Easter log -
2024e-11 -
Extended as batch 24-01 L=81.5m
Tie in survey to include 23-06 L=59.5
Water heard below @ very tight pitch.
TL=2673 + 41 = 2814m
TL = 2797m (adjusted)
2025
April 14th - Easter log -
2025e-14 -
Dive bottles in to duck / sump. Pitch up investigated.
April 15th - Easter log -
2025e-18 -
Resin anchors in on top pitch + remove some obstructions.
April 16th - Easter log -
2025e-24 -
Dive upstream inlet sump. Closed down after 9m.
Digging out downstream sump 2.
April 21st - Easter log -
2025e-47 -
Dive downstream sump 2. Difficult.
April 22nd - Easter log -
2025e-47;
2025e-48 -
No further diving at downstream sump 2.
Site detackled.