August 4th - summer log -
2006s-21 -
"Not Granny's Grave" dig in streamway. Draughts.
More work needed. Photos.
August 13th - summer log -
2018s-37;
2018s-39 -
Digging.Down 2.5m. Draughts. Friendly farmer.
(2 accounts)
August 15th - summer log -
2018s-39 -
Continue digging. Surveyed.
August 27th - summer log -
2018s-62
August 1st - summer log -
2019s-18
August 2nd - summer log -
2019s-18
August 13th - summer log -
2019s-34 -
Into bedding down on right. Draughts.
Looks promising.
August 16th - summer log -
2019s-43;
2019s-47 -
Dug through to very low dry streamway. Upstream may choke, but needs digging out.
Downstream to small chamber in collapsed sediments.
Survey. Photos.
August 27th - summer log -
2019s-58 -
Photos + survey (survey has O + E?)
L=28m d=11m
Entrance better @ 452696 4800996 ^209?
(Best to check with surface survey up to gate?
August 11th - summer log -
2022s-34 -
Draughting. Best to dig @ base of entrance shaft.
See also DCC account later in log.